Ali ALAZZAWI
***** **** **** **. *******, TX ****2,
Cell: 832-***-**** & Email: ***********@*****.***
OBJECTIVE
Seeking a position primavera schedule in a challenging environment where my education and
10 years of Technical and field experience can be utilized. I am a dedicated and innovative individual,
and am certain that I will prove an immediate asset any company where technical competence and
perseverance are in demand. Experienced with highly competitive technical and team management
experience, And in-depth experience of quality, management programs, Statistical analysis,
regulatory compliance, Quality improvements. Recognized for ability to lead teams and quality
improvements to achieve positive outcomes, Results driven but diplomatic professional able to work
effectively in teams or independently to meet and exceed business as well as customer needs.
WORKING AUTHORIZATION: Permanent Resident
HIGHLIGHT OF QUALIFICATIONS
• Quality assurance and control
• Work flow planning
• PE construction and reconstruction
• Primavera P6 Scheduling (5 years’ experience with Primavera software), Cost Control
And Resource Allocation; Excel and the Microsoft Suite of Programs, Schedule Analyzer Pro,
• Digger, Adobe Acrobat, Picasa, PhotoshopAuto CAD and AutoCAD architectural user
• RMA Programs of PE
• A+ and networking
• Degree in ISO 9001 and IMS
• Excel, word,power point and project Management of Microsoft office
• S.A.P OF material management
• Familiar treatment with E-RMA SYS. Of supplier RMA request
• Easiest work in E-NCMR and connect the vendor to respond his comments or questions to fix the
problem/ misunderstood.
• Familiar with EGRN and E-FOX system of manufacturing industry world
PROFESSIONAL EXPERIENCE
Foxconn Assembly LLC.
11177 Compaq Center West Dr.
Houston, TX 77070
MRB Clerk/ Quality Department. Jul-2012 - Present
The Material Review Board (MRB) is responsible for deciding the disposition of all discrepant material.
• inspecting production material and customer returns
• maintaining quality inspection documentation
• moving inspected material out of MRB The Quality Manager is responsible for
• ensuring that all MRB documentation is prepared and distributed
• coordinating the daily MRB meeting
• inspecting incoming purchased material
• maintaining receiving inspection documentation
• moving inspected material out of MRB
• arrange with the suppliers all the RMA’S return materials
2
USA ARMAY CORPS OF ENGINEERS
Baghdad Iraq
Project Engineer, July 2009 – February 2012
Began working as a quality assurance engineer and primavera scheduling for infrastructure project and after
five months I was promoted to P.E. overseeing infrastructure and construction of lift up stations. As the
project engineer I was also responsible for all project invoicing. I had more than 11 project with this
company the biggest project respectively
• Wastewater treatment plant WWTP in Fallujah city –Iraq my job was mange $30 million for this project
and review the drawing sight over the contactor quality due and primavera invoices, work schedule attends
of site engineers roll the engineering daily report.
• Lift Pump Station Sewer system in Baghdad city –Iraq my job was mange about $10 million, review the
drawings of project and approved the constructors duty in site job, follow up the schedule time of work
with primavera (project management program)
• Supply electric power station in Ramadi – city IRAQ My job was manage $ 36 million and review the
drawing of the project approved the construction and installation the medium voltage and control room,
instillation the SKADA system of control and 4 generation FGW 1.5 MG for emergency, fuel system
4000,000 gallon and security system in the site .
• Transients power station in Ramadi city – Iraq to received 132 KW and transfer it to 33 KW and 11 KW by
using high voltage cables connection
• Majed Camp of USA army –Fallujah city – Iraq that includes the housing and laborers and office system
with all required utilities this camp for more than 11000 person my duty in this project site manger and
responsible the management money movement with MS PROJECT 2007 to the bank account of the
company.
• Digging wells of water in ALNABR province in Iraq on the pilgrim way, the wells depth were between
145-220m
• Extend cables of high voltage through Baghdad city in Iraq among supplying power station, transference
plant station and the resident city by using several size, kinds of cables and tools
Baghdad, Iraq
Onsite Engineer 3/2006 TO 7/2009
I worked with this company as a project Engineer and primavera 6 responsible for new construction and
rebuilds. During my tenure, I established the K-SPAN system of building using MIC industry machinery. In
the three years at the organization, I was responsible for four projects and managed more than $70 million
review the invoice with Primavera 6 and manger the site recourse, as flowing.
• Police Academy K-pan warehouse. This project started at 2006 in Baghdad- Iraq with budge $40 million
more than 3 construction and industry companies, my job in this project was construction the K-SPAN
system with MIC machine and build about 15 hunger 1700m2 each . And do the insulation for the hot
weather in and outside the building.
• Working to build plant of refining oil and gas in sough of Iraq the work include operation and maintenance
service for 2 years, so the company committed to provide special crews for 6o workers and care by these
issue through the time of contract
2
832-***-**** ***********@*****.*** Page 3/2
ALI ALAZZAWI.
EDUCATION
• Houston community college 2014
PDMS piping Deign
• Houston Community college 2013
Computer A+
• Al-Hurrah college 2008
Project management programmers (MS Project 2006, primavera 6)
• Mustansriah University. 2006
Civil Engineering
• Al-Habaneha school. 2001
High school
REFERENCE
• CPT Julia Ruddock Corps of engineering (USACE) Deputy OIC, Al Anbar RO
*****.*******@**.****.***
• Eng. Santiago loa supplier engineer and quality supervisor of FOXCONN LLC 281-***-****
• Eng.Abdul wahab. Quality Engineer of MRB Dep. Of FOXCONN LLC 832-***-****
Abdul Wahab Ahmad/USA/FOXCONN