Name: Su Zhen Feng
Date of Birth: December 18,1968
Qualifications:
Qualified Drilling Engineer by CNPC (China National Petroleum Corporation)
Foreign Language:
Fluent in spoken & written English
Education:
Graduated from Jiang-Han Petroleum Institute in 1991 & received Bachelor
degree of Drilling Engineering
Training
March 1995-Nov.1995
English/computer/first aid/well control/H2S prevention training in the
Advanced Training Center of Zhong Yuan Petroleum Exploration
Bureau(ZPEB),gained grade A.
Certificate
Hold current valid IADC well control certificate which will expire on April
13/2015.
Home phone: 039*-*******
Cell phone: 139-****-****
Working Experience:
April 2008 - Date
Day drilling and completion supervisor for COPC ( ConocoPhillips China Inc.
).
Mainly in charge of the daily operation at Jack-up and platform rig in
Bohai bay and all the wells drilled and completed were on day rate basis,
experienced drilling and completion operation on rig, such as open hole
drilling with ultradril water base mud and oil base mud system, open hole
lower completion with stand-alone screen, stack-pack operation, STMZ(
single trip multi-zone ) frac pack operation, acid operation, cased hole
completion operation, water injector well operation, deep set upper
completion( with IB5 installation pack off assembly at bottom of the string
) and shallow set upper completion etc.
September 2007 - March 2008
Senior drilling engineer for COPC ( ConocoPhillips China Inc. ).
Mainly in charge of the office support for the offshore rig including
procedure preparation, itemize AFE, provide technology support to the rig
regarding down-hole problem solving.
January 2007 - August 2007
Day drilling supervisor for SIPC Myanmar( Sinopec International Petroleum
Corporation Myanmar Project ).
Mainly in charge of the daily operation at rig and all the wells drilled
were on day rate basis, experienced high pressure drilling, high and low
pressure existed in the same open hole section.
January 2006 - December 2006
Day drilling supervisor for CNPCIAE ( China National Petroleum Corporation
International Algeria Exploration ).
Mainly in charge of the daily operation at rig and all the wells drilled
were on day rate basis.
September 2004 - 2005 December
Night supervisor for Pan-China Resources LTD, a wholly subsidiary of
Sunwingenergy limited company
Mainly in charge of supervising daily operations at rig & all the wells
drilled were on day rate basis
March 2003-August 2004
Senior Toolpusher for Rig 908(diesel electrical rig) of Drilling Company
No.2 of ZPEB( Zhongyuan Petroleum Exploration Bureau?) in MOL drilling
project in Block 48&49,P.R Yemen
Mainly in charge of the daily operations at rig following the operation
instructions of the Operator's supervisor
January 2001-February 2003
Drilling Engineer for Rig 50113(diesel electrical rig)of Drilling Company
No.2 of ZPEB
Mainly worked as a supervisor at rig & all the wells drilled were on turn-
key basis.
September 1998-December 2000
Chief Engineer for Yan' an Zhong-sheng Drilling and Production Co, Ltd., a
subsidiary of ZPEB in Yan' an city, north-west China
Mainly in charge of technology management and making the technical
decisions, had experienced the technologies as following: cluster-well
drilling technology mainly focusing on cluster-wells' anti-collision, lost
circulation control, long-interval cementing, drilling directional wells
with high deviation, dealing a lot with down-hole drilling problems such as
fishing as well.
January 1996-September 1998
Drilling Engineer for the Drilling Branch of ZPEB' s Shan-bei Drilling
Engineering Department, a drilling service company in Yan' an city in north-
west China
Taking daily technical inspection to all the rigs & providing technical
support to the rig engineers, helping rig solve down-hole problems.
April 1994-January 1996
Work-over Engineer for Work-over Department of Drilling Engineering Company
NO.5 of ZPEB.
Mainly worked both in the office engaged in work-over technology management
& on site as a work-over supervisor, for repairing and/or changing the
eroded casing, & window-opening, sidetracking, fishing, etc. in cased
holes.
July 1991-April 1994
Drilling Technician, Drilling Engineer for Rig 32959 of Drilling Company
No.4 of ZPEB.
Mainly worked as a technical supervisor at rig & all the wells drilled were
on turn-key basis.