Belview, Mn.
Scott Pederson
Professional
Experience 2013-Present
Project Manager / Purchasing
SpecSys Manage builds of equipment from 500 hrs to 20,0000 hrs
Granite Falls Mn
Manage timelines of build so that it is completed on
time and budget
Purchase components and raw material for build most
economical
2011 - January 13th, 2013
Manufacturing Engineer
Manage machine maintenance personnel with daily
priorities.
Chandler Industries Plan shipping of product to meet due dates.
Inc. Work with management to meet due dates. Overtime and
Montevideo, MN extra resources etc.
Create bar graphs for work center efficiencies.
Compare estimate with real time for profitability of
part numbers.
Re-estimate non-profitable part numbers.
Implement new tooling and routings for ergonomics for
machine operators and improve efficiencies of part
numbers.
Set up new work center areas for user friendly
environment for operator.
Ongoing 5s improvements weekly.
Weekly engineering meetings for new product and new
tooling implementation.
Work with machine operators in building team
environment to help improve profitability for operator
and company.
Hutchinson 1998 - January 2009
Technology Inc. Tool Maker Lead / Prototype Engineer
Hutchinson, MN Manage 15 -20 people on their daily duties.
Manage and level the workload in the shop.
Heavy workloads look for other vendors to send
external.
Create work center teams, write up reports to show
efficiencies in work area.
Double check routings and estimates of jobs.
Research and purchase machines.
Work with engineers to utilize the lasted technology
to improve build time and develop new tooling.
Disciplinary action meetings up to termination.
Conducted Interviews.
Bi -annual reviews of staff.
Procurement of companies to expand tooling base.
1997 - 1998
Tooling Estimator
Estimate the time to build tooling.
Structure an order on how the tool should be run
through the shop in an orderly manner.
1995 - 1997
Tooling Coordinator
Coordinate tools through tool room to ensure fastest
build time.
Work with toolmakers, design and purchasing to prepare
for tool build.
1994 - 1995
Mechanical Technician
Assemble and debug production machines such as forming
systems, accugrams, laser welders and hole shears.
1992 - 1994
New Build Toolmaker
Build high tolerance detab dies, forming dies, and one
up detab dies.
1990 - 1992
Custom Repair and New Build Toolmaker
Build and maintain sheet shears, detab dies, damper
dies, and selective sheet shear. Make improvements to
machines and modify.
1988 - 1990
Surface Grinding and Heat Treat Specialist
Surface grinding precision parts and heat-treating
material to a specified Rockwell hardness.
1987 - 1988
Class A, CNC Production Machinist
High Tolerance CNC, lathe, horizontal mill, boring and
surface finish.
Sanborn
Manufacturing
Company
Springfield, MN
Education
Productivity Inc.
Minneapolis, MN 2012
Fanuc Control
HAAS CNC Operator Training
HAAS CNC Programming Training
Professional
Training Institute 2009
Fargo, ND Insurance
Life, Accident and Health
1990 - 2008
Hutchinson Tecnology View My Transcripts
Inc. List of classes provided on a separate sheet.
Hutchinson, MN 1986 Graduate
Machine Tool Technology
First Year - shop practice 720 hours, math 80 hours,
blueprint reading, sketching, drafting 90 hours and
Southwestern theory 180 hours.
Technical College Second Year - numerical control, CNC 200 hours, mold
Granite Falls, MN making 430 hours, jig and fixture design 45 hours,
blue print reading, industrial relations 75 hours and
EDM 50 hours.
1984 Belview High School Graduate
General
Interests Reading, music and outdoor activities.