Post Job Free
Sign in

System Plant

Location:
Riyadh, Riyadh Province, Saudi Arabia
Posted:
March 15, 2014

Contact this candidate

Resume:

Personal Details

Full Name : Romay Wildan

Place/Date of Birth : Cilegon / May 09th, 1980

Nationality : Indonesian

Gender : Male

Phone : +966********* / +628**********

E-mail : *******@*****.**.**

Religion : Moslem

Formal Education

Period School / University

1999 - 2006 Jenderal Achmad Yani University-Indonesia, Chemical

Engineering Department

Qualification

. Familiar with utility process, core common/gas process.

. Familiar with Interlock system, Petrochemical/Hydrocarbon Process.

. Familiar with Lock, Tag And Try (LTT Box)

. Familiar with Permit

. Familiar With System Walk down

. Pump Seal Systems

. Loop Reactor

Training

- Hamworthy ENVIROjet Gas Burner Type SGL 8/10000 Training February 25-

26 2008

- Training Of DELTA V - Emerson Software

January 2010

- Training And Certification Of Occupational Health And Safety - Chemical

November 2009

- Training and Certification Of Fire Fighting Classes C

January 2010

- Training And Certification Of Boiler (first class boiler)

July 2010

Working Experience

A. February 2005 - April 2011

Company : PT. Petrokimia Nusantara Interindo (PENI) - BP, Now Called PT.

Titan Petrokimia Nusantara

As : Senior Operator

Duty & Responsibility :

1. Ethylene and Butene: Jetty Head Off Load Ethylene and Butene Unloading

Arm, Compressor Boil Off Gas, Vaporizer Liquid Ethylene, Gas Ethylene

purification.

Hexane: Drying, Stripping and Distillation Column.

3. Catalyst: Manufacture Cr+6 from Cr+3 and Ziegler Catalyst

4. Utility:

- Sea Water intake.

- Treated Cooling Water Closed loop system.

- Fire Water, Electric and Engine Diesel Fire Pump.

- Potable & Demin Water.

- Steam Generation fire tube type.

- Instrument Air Compressor.

- Effluent treatment, flare & Incinerator.

- Hydrogen and Nitrogen network, Vent System.

B. April 2011 - February 2013

Company : Saudi Chevron Phillips Chemical (S-Chem)

As : Process Reactor Operator

Duty and Responsibility :

1. Pre-Commissioning Air Blowing

2. Pre-Commissioning Power Flushing

3. Pre-Commissioning Steam Blowing

4. Pre Startup Safety Review (PSSR) - Tracking

5. Pre-Commissioning /Commissioning And Startup Boil Off Gas Propylene

Unit.

6. Pre-Commissioning/Commissioning And Startup Olefin Conversion Unit Plant

(Propylene and Iso-Butene Plant)

Basic Section :

. Reactors to hydrogenate Raw C4's

. DeIsobutanizer" Column to separate IsoButenes

. Olefins Conversion Unit

. Total Hydrogenation Unit, Isobutane Recovery Unit

7. Pre-Commissioning/Commissioning And Startup Hexene Plant

Basic Section :

. CATALYST Preparation Area - All Chemical Tanks, Catalyst Mixing & Feed

Tanks, EthylBenzene Storage Cyclohexane and 5 Dryers with Nitrogen

Regent system,

. Ethylene Feed System - Compressors and Dryers

. Hexene Reactors - Feed Heaters, Reactor Loops and Reactor Coolant

system.

. Fractionation Section - Primary Fractionator, Decene Recovery Column

and Hexene Splitter Column.

. Product Storage - Hexene Tanks ( UT ) MOGAS Drum for Decene and Heavy &

Spent Catalyst Drum

8. Pre-Commissioning/Commissioning And Startup Pyrolisis Gasoline Plant

Basic Section :

REACTION SECTION

. First Stage Reactor

. Second Stage Reactor

. Hydrogen Compressor

FRACTIONATION SECTION

. H2S STRIPPER

. DEPENTANIZER

. DEHEXANIZER

C. March 2013 - Present

Company : Saudi Aramco Shell Refinery (SASREF)

As : Sr. Operator

Duty and Responsibility : Utility and Aromatic

Utility : Accidently Oil Contaminated Sewer, Effluent water system, Potable

water, Cooling System, Fire system, Flush Oil (Steam Turbine Pump),

Chlorinator system, Instrument Air/ Plant Air, Fuel Gas System, Steam

generation, Boiler Feed Water System, Nitrogen System.

Aromatic site : Sulfulane Extraction Unit, Aromatics Fraction Unit, Benzene

Emission Control System and Turnaround Shutdown and Prestart

up/Startup

Sincerely Yours,

Romay Wildan Ma'ruf



Contact this candidate