MILTON G. MANOS
**** ******** ****** ** ******, Ohio 44718
330-***-**** (C) 330-***-**** (H) *********@***.***
PROFILE
ENGINEER with extensive project management, plant and energy design, piping
and hydraulics, process improvement, HVAC, controls, quality, and
manufacturing background. Lead engineer for several successful multimillion
dollar projects. Self-directed lead engineer / project manager who enjoys
coordinating teams. Cash flow manager for contracts, scheduling, and cost
engineering. An excellent communicator who manages with integrity and
initiative. Great problem solving ability and computer-aided engineering
skills. Quick to understand and apply new technologies to "get the job
done." Career objective is to increase margins in position of engineering
or project manager by prudent technical/quality/financial management.
EXPERIENCE
Project Lead CIC Group
8/2013 to 2/2014
Managed blast & paint subcontractors and piping fabrication projects for
clients (Babcock & Wilcox, gas burner assemblies, 25% profit). Achieved
20% profit on $3.2 MM Celanese (cellulose acetate manufacturing plant) gas-
fired boiler retrofit project (Black & Veatch), including new pipelines and
valves for natural gas, fuel oil, compressed air, process water,
condensate, and boiler feedwater. Forecasted costs, revenue, profit, shop
labor resources, and executed work in accordance with contract
specifications, using Solidworks drawings and ASME/API/AWS codes. Manage
change orders and provided financial, WBS, MS Project schedule, and
progress updates to executive management and customer. Developed project
plan with customer, including logistics, deliverables, responsibilities,
and terms of acceptance. Resolved welding and paint quality issues.
Improved internal PM processes, MS SL cost reporting, material inventory,
and document control. Coordinated factory (traveler) routings with Plant
Manager and Safety Supervisor.
Project Manager
Siemens 3/2008 to
12/2012
Siemens Energy Environmental Systems product line system integration
development, engineering coordination, requisition preparation, bid
evaluation, Vendor expediting, contract negotiation, change order
estimating for air pollution control (APC) systems (PJFF, HLPAC, WFGD,
DESP, WESP). Provided technical support of U.S. and International Sales
Orders; supported environmental regulation and compliance consulting,
environmental impact evaluation, ASME BPVC, engineering, and document
control processes. Implemented customer contract requirements and
coordinated internal/external resources to execute primary Project Engineer
protocols: issue requisitions/PO's, approve Vendor drawings for
fabrication, deliver material to meet customer critical dates on time.
Trimble County APC project, budget $138 MM: As Piping Project Engineer:
resolved customer drawing comments, check contract specification, resolve
maintenance issues, created AutoCad drawings, coordinate internal
engineering reviews, direct Vendor activities, and deliver fabrications to
Customer. Resolved customer drawing comments and directed Vendor activities
to finalize drawings for piping and interfaces with ductwork, structural
steel, and flue gas desulferization process equipment. Determined lift
plans, rigging methods, and contractors for field installations. Managed
piping/valve Vendor progress for 40 APC piping design systems and 15
Vendors: conduct weekly status review meetings with Vendors, update Action
List, conduct weekly progress review meetings with Customer, create
Primavera schedule exception reports and notify Project Manager, Buyer, and
Design Engineer concerning procurement, design, and/or delivery problems,
contact Vendor to expedite procurement activities. Coordinated responses to
Customer concerning piping/valve tagging and Vendor worksheets eliminating
design errors, commodity databases, isometrics, and P&IDs. Developed Master
Siemens Drawing List for overall project and managed 10,000 Customer and
Vendor documents. Prime coordinator for resolving O&M Manuals; Customer's
unapproved document status; external eTransmittals to Customer and Vendor;
reducing exceptions to < 100 documents (1%) within 2 years using Excel, MS
Access database. Provided technical responses to Customer requests for
information (RFI) and change requests to resolve site construction issues.
Assigned to Siemens Industry Large Drives manufacturing plant 2/15/2010 as
Project Engineer for Qatar Liquified Natural Gas (LNG; Trains 4, 5, 6, 7;
budget $233 MM). Led daily site calls, coordinated site team activities,
and prepared minutes of meeting. Prepared Management of Change (MOC,
engineering design changes), ordered materials, and software modifications
for outage work. Managed site, quality (250 8D reports), and engineering
resources for refurbishment activities: 7.2 kV switchgear, power cell, DI
cooling system modifications, transformer, and conducted QA inspections.
Promoted to Project Manager, Siemens Industry Large Drives 4/18/2011.
Assigned to Quality First projects for Project Management Module for LNG
Qatar water cooled large drives. Assigned to air and water cooled variable
frequency drive projects (14) ranging in size from $0.5 MM to $2.5 MM. Led
team, prepared risk and cost analysis, created MS Project Schedules, Gantt,
PERT, SAP budget and procurement, change orders; conducted Factory
Acceptance Tests for Large Drives; coordinated engineering and logistics
for large drive procurement, manufacturing, testing, delivery, and field
service hand-off to resolve Customer issues. Launched new product (part
numbers) in SAP utilizing 5 stage development process.
MILTON G. MANOS
Page Two
Senior Manufacturing Engineer Hayes Lemmerz
2004 to 1/2008
Promoted from Senior Manufacturing Engineer to Senior Reliability Engineer
6/1/2007. Per MBB directive, managed new TPM (Total Productive Maintenance)
program with workshop for Military Hummer Hoop Line, improving machinery
reliability, uptime, and overall equipment effectiveness (OEE). Implemented
TPM processes to military 20x10 line, truck rim lines and EDP paint line.
Developed predictive maintenance for machinery hydraulics of the entire
facility. Implemented preventative maintenance for rim lines and facility
HVAC equipment. Led associated Safety Process Risk Assessment teams and
implemented electrical solutions and access platforms to eliminate OSHA
violations; served on safety steering committee. Supervised contractor for
HVAC maintenance and new chiller fan improvements. Executed & managed
process improvement projects for paint finishing lines and steel wheel
welding & press assembly.
Improved factory processes, directed operations, and supervised maintenance
and production work for truck wheel cell, military stud press, and powder
coat painting line. Modified demount/adaptor cell to one piece flow,
improving takt time, relocated machinery, and improved welder capability.
Conducted design of experiments and SPC studies,
designed/fabricated/installed new machinery dies, eliminated rim curl
variation, identified/installed maintenance improvements, conducted wheel
run-out studies, established welding control settings and implemented
countermeasures, improving process capability by 50%, reducing labor costs
by eliminating the need for 100% product quality checks for truck wheel
cell, saving $150,000 annually. As powder coat team leader, installed
electrical and mechanical grounding systems, fan cooling, paint gauging
controls, R&R attribute study, calculated value stream, and implemented
LEAN process improvements, 5S, increasing first pass yield wheels from 92%
to 100%, saving $250,000 annually. Implemented safety improvements,
installed machine guarding, electric eyes, CNC program, and machinery
rebuilds for military wheel trimmer.
Project Manager
Johnson Controls
2003 to 2004
Directed application engineers, software engineers, contractors for design,
installation and commissioning of HVAC control projects for Washington DC
federal buildings, including GSA/National Oceanic Atmospheric Agency
(NOAA), U.S.D.A., Department of Interior, and Walter Reed Army Medical
Center. Prepared cost estimates, change orders, project schedule, risk log,
customer billings, budget analysis, and managed cash flow. Managed four
man crew for start-up work of cooling towers, steam boiler, hot water
heating systems, VAV boxes, and fan coil units for Dept. of Interior.
Programmed unitary controllers, prepared Visio interlock wiring diagrams,
and ordered control hardware for Crystal City Apartments. Integrated
emergency generator power system with BACnet HVAC control system for NOAA
building construction. Reviewed designs for NEC compliance. Achieved 20%
profit margin on projects.
Mechanical Engineer GE Power Systems -
Energy Services 2000 to 2002
Project manager for GE new product initiative: automatic coal damper (U.S.
Patent 6,799,525). Researched existing patents and wrote patent for new GE
product. Prepared AutoCAD 3D design drawings, electro-magnetic power
cylinder, combustion, air flow, and machine component stress calculations,
specified ceramics, built and tested prototypes, and completed six sigma
analysis for best product based upon customer CTQ survey. Completed
nondisclosure & property rights agreement with Air Monitor real-time coal
flow measure and developed GE Fanuc/Air Monitor integrated control system.
Wrote software/hardware specs and completed controls factory acceptance
test. Completed cost proposals, schedules, customer value calculator,
competitive analysis, multi-generation product plan, marketing plan, and
technical sales overview. Solicited U.S. Dept. of Energy, State of Ohio,
and utility customers for product demonstrations.
Developed new design procedure for six sigma root cause FMEA analysis of
boost air hose failure. Prepared boiler cost analysis, ductwork pressure
lost calculations, ASME BPVC checks, Minitab DFSS, and requisitions for
over fire air ductwork, boost air piping, and expansion joints for boiler
reburn air emissions control projects. Developed boiler PLC control logic
and ceramic coating & metallurgical material specs for high temperature
coal muzzle component. Conducted combustion start-ups, Q/A inspections of
ductwork, and safety inspections of access platforms. Prepared
technical/cost review analysis for reburn/low NOx burner proposals.
Conducted petroleum coke customer survey of fifteen U.S. coal-fired plants.
Developed scope, spec/reviewed bids, and design for DOE Gas Reformer and
biogas reburn projects. Developed nondisclosure & property rights agreement
with Lehigh University.
Division Engineer
Collins & Aikman
1997 to 2000
Managed process improvement projects, product launches, and maintenance
work. Completed design, construction, city permitting, and start-up for
office expansion and HVAC. Designed/installed vinyl embossing machinery,
power cylinders, hydraulic piping, gauging equipment, cure press molding
tooling, and rubber calendar line projects. Vinyl embossing projects
resulted in $250,000 annual cost savings and expediting General Motors year
2000 delivery.
Developed product cost, analyzed workflow and calculated labor time
studies. Improved management resource planning, kanban techniques,
preventative maintenance schedules, and cellular manufacturing for QS9000
certification. Conducted design of experiment, process trials, and
statistical analysis to improve extrusion, mold release agent, rubber dip
supply system, and automotive floor mat quality, saving $200,000 annually.
Installed and started-up electric infrared oven, automated temperature
controls, carpet web guidance, injection molding, vinyl gauging, and
machinery PLC's. Started-up punch press and carpet cutting machinery,
prepared drawings, developed product launch cost analysis, APQP, PPAP,
using Windows 98 (3D AutoCAD 14, MathCAD, SQC Pack, MS Office/Project).
Reviewed designs for O.S.H.A, N.F.P.A., B.O.C.A. code compliance. Obtained
building permits, installed utilities, and LAN network. Completed design,
construction, and start-up for office expansion, including Trane roof top
cooling units and conducted HVAC maintenance program.
MILTON G. MANOS
Page Three
Senior Engineer East Ohio
Machinery 1996 to
1997
Supervised engineers/designers, managed projects, and prepared technical
service proposals for industrial customers. Lead engineer for U.S, Steel
temper mill/galvanized strip revamp project, provided on-site constructions
supervisions, designed planted layout, heavy machine foundations, steel
towers, furnace structures, mechanical process equipment, hydraulic piping,
gauging, and motor drives (3D AutoCAD, STAAD, F.E.A., MathCAD, MS
Office/Project). Projects: Timken bearing indexing conveyor, Owens Corning
fiberglass melter, Walt Disney boat ride hydraulics, steel frame weldments,
roof top HVAC, waste water treatment systems. Designed truck axle hydraulic
drilling and spot welding station for Rockwell International. Analyzed weak
link stress components of steel mill drive train.
Project Engineer
First Energy 1982 to 1995
Promoted to Project Engineer 5/1987. Served as Project Manager and liaison
between internal project groups (engineering, purchasing, divisions,
plants, accounting, and legal) and companies such as Babcock & Wilcox,
Honeywell, and Asea Brown Boveri. Developed, negotiated, and administered
contracts, evaluated bids, supervised engineering design work, and
expedited purchasing, contractor, and vendor activities. Prepared drawings
schedules, cost estimates, and bid documents. Projects undertaken include
Data Acquisition System Replacement, Continuous Emission Monitors, Air
Pollution Control projects (Gas Reburn, SNOX, and Scrubber). Prepared and
negotiated U.S. Dept. of Energy procurement and scope of work contracts.
Started up equipment, reconciled project budget, and resolved contractor
cost claim issues. Conducted boiler and generation unit performance
testing. Prepared contractor bid packages and managed boiler & turbine
outage construction work. Diagnosed and corrected booster fan problems.
Installed gas and water meter utilities, substations, power supplies, and
high voltage transformers.
Prepared specification, schedule, and cash flow for Data Acquisition System
Replacement, improving plant productivity and reducing manpower by 20%.
Expanding plant office and HVAC system for computer clean room
installation. U.S. Steel coke supply project resulted in increasing cash
flow $250,000 per month and maintained U.S. Steel as the largest metered
customer in the First Energy System. Installed automated truck weigh scale.
Served as Construction Manager, supervised contractor, coordinated
engineering/procurement activities, and erected Absorber building for
Scrubber Project, completing work on schedule and under budget. Coordinated
field start-up activities and resolved contractor punch-list issues.
Conducted boiler tube welding inspections.
Promoted from Plant Engineer B to Plant Engineer A within three years.
Served Operation and Maintenance Departments for coal-fired power plants
throughout Ohio and Pennsylvania to prepare cost estimates and drawings for
structural/mechanical additions, waste water treatment, environmental, and
Improve Settling Basin/Lamella Thickener projects, streamlining operations
and reducing maintenance costs. Wrote associated O & M procedures.
EDUCATION
Ashland University - M.B.A., 2003, 3.7, Marketing & Finance Major
University of Akron - M.S. Mechanical Engineering, 1989, 3.6, Machinery &
Vibration Major; Thesis: Extreme Operating
Conditions of a Nuclear Power Plant
Feedwater Pump as Induced by Component Excitations
-- B.S. Civil & Mechanical Engineering,
1982, 3.0, Structural & Hydraulics Major
Product Line Training - Siemens Energy Environmental Systems: DESP, WESP,
PJFF 6/2008, WFGD 6/2009
Machine Safety Guarding - Rockford Systems, 4/2007, Robot Operations -
Fanuc Robotics 12/2007
Electro-deposition Paint (EDP) Knowledge - PPG 10/2007, Powder Coat
Painting - PPG 10/2004
Management By Fact, Supervisory Skills, Hydraulics - Hayes-Lemmerz
Operational Excellence, 8/2004, 9/2006, 11/2006
GE Power Systems University - Green Belt Quality Certification, Design for
Six Sigma 3/2002
Allen Bradley Programmable Controller School - Certification, 4/1998,
AutoCad Drawing - 2/1986, 15 years experience
American Society of Heating, Refrigeration and Air-Conditioning Engineers -
ASHRAE Member, 2002-2004
Professional Engineer - State of Ohio, 9/1986, 50560
Project Manager Professional - Project Management Institute, 7/2011,
2038291
CONSULTING
Senior Mechanical Engineer Fives Bronx
2/2013 to 7/2013
Developed machinery process cycle times to meet Customer API contract spec
for oil pipe production demand. Completed component design, drawings, and
calculations for international oil piping factory machinery projects,
including hydraulic intensifier, leak tester, pipe sealing systems, dual
head hydro-tester, safety hood, operator's pulpit, trolley crane, reject
paint marking, and quality control. Lead engineer for hydraulic, pneumatic,
control systems & schematics, structural steel, concrete foundations, and
heavy steel weldments using AutoCad, 3D Inventor 2014 and documentation of
applicable ACI, AWS, AISC standards for civil, structural, and piping
design.