RESUME
V.P.O kultana
Distt. Rohtak (HR)
pin-*24119
***********.****@*****.*** *********.***@*****.***
PhoneNo.-999-***-****/925*******
RAMESH KUMAR
Total 9.5 Years of total Experience in Telecom Industry.
Hands On experience in Installation & Commissioning of NEC – MW Pasolink(PDH), Pasolink+(SDH) & NEOi
3 Year Diploma Electronics &Telecommunications
Employment Detail:--
Currently working Tata Tele Services Ltd. New Delhi Network Engineer since 14.09.20012
Description:-
• Maintained necessary communication between NEC,NOKIA,HUAWEI, UNINOR,RELAINCE,TTSL & Vendor to maintain Installation tracker as well as Quality of sites.
• Daily work report & AT report preparation.
• NMS visibility, configuration & Site Integration.
• Quality audit for Installed sites by vendor as per NEC standard.
• Troubleshooting on Transmission Equipment related factor.
• Microwave commissioning of NEC(SDH & PDH)radio link..
• Fault rectification related to NEC microwave radio(iPASO200,PASOLINK NEOi &NEOi CPV,PASOLINK V4).
• I & C of 0.3m, 0.6m, 1.2m,1.8m diameter NEC Microwave radio as per Link Budget (iPASO200,PASOLINK NEOi &NEOi CPV,PASOLINK V4).
• Link up-gradation from PDH to SDH conversion of transmission media
Objective: To work on challenging assignments for an organization that cares for its Employees and
Provide professional environment.
Job Target: Telecom Project
Previous Experiences:
• Arya Communications & Electronics Services Pvt. Ltd, New Delhi .
Location:–, New Delhi .(July 2004-Oct 2007)
Designation: Sr. Technician
• Reliance Communication as Microwave Engineer.
Location: Rohtak Haryana. Oct 2007 TO May 2009
NEC India Pvt. Ltd as Cluster Project & Quality Engineer
Location: Rohtak Haryana jun 2009 To March. 20011
Project done for Operator:
Reliance Communications: Haryana, Himachal Pradesh, Punjab, Rajasthan, UP
TTSL: Rajasthan, UP Haryana
MTNL Delhi
BSNL: Punjab, Haryana delhi
TTSL GSM :Haryana
Working Responsibilities Details:
Operator: Reliance Communications Ltd. - Haryna,Himachal Pradesh,Punjub,Rajasthan,UP
Equipment / Project:NEC Microwave (PDH), Pasolink+(SDH) & NEOi & Transportation
Hops Completed: 1100 and onwards.
Working Responsibilities:
Subcon & Project Management.
Installation of 0.3m, 0.6m, 1.2m, 1.8m & 2.4m dia. microwave antennas
Alignment of 7GHz and 15 GHz mini SDH and PDH link and backbone microwave antennas.
Managing installation team, their site movement and manpower distribution.
Daily Progress Report & AT report preparing.
Intallation & Commissioning of NEC Microwave Pasolink (PDH), Pasolink+ (SDH) & NEOi and its troubleshooting.
Measuring of VSWR & Return Loss in IF Cable And Link Performance testing by BER Meter.
PNMS Configuration.
Industrial Training
Attended 5 days training on the Installation of Alcatel SDH equipments during
12 /09/2005 to 16/09/2005 at Alcatel India Ltd. Gurgaon
Attended 5 days training program on the Installation, commissioning & alignment of NEC microwave link during 5/07/2004 to 9/07/2004 at ARYACOM office in Delhi
Attended workshop of one day on Motorola Canopy (a broadband equipment) at Motorola IndiaLtd.
2 days training at RELIANCE COMMUNICATION LTD. under following deptt. Operation and Maintenance and installation & commissioning at Chandigarh.
Attended training on Operation and Maintenance of the Microwave and SDH organized by RELIANCE COMMUNICATION LTD. at Chandigarh.
Operator: Tata Teleservices Pvt Ltd. - Rajasthan,UP
Equipment / Project: NEC Microwave (PDH), Pasolink+ (SDH) & NEOi & Transportation
Hops Completed: 300 and onwards.
Working Responsibilities:
Subcon & Project Management.
Managing installation team, their site movement and manpower distribution.
Daily Progress Report & AT report preparing.
Installation & Commissioning of NEC Microwave (PDH), Pasolink+(SDH) & NEOi as well as its troubleshooting.
PNMS Configuration.
Operator : Delhi-MTNL
Equipment / Project: BTS (Motorola H-II) Lucent and NEC Microwave / GSM Project for I/C
Site Completed: 150 (approx.)
Working Responsibilities:
Installation /Commissioning & Power Calibration of BTS. E1 & Alarm Patching.
VSWR & RF Power measuring by Bird/Anritsu as well as Analog & Digital Power Meter.
AT performing with Motorola & MTNL(Delhi) Representative.
Subcon Management.
Operator : BSNL(Punjub,Haryana,UP)
Equipment / Project: BTS & BSC (LG) / CDMA Project for Installation of BTS & BSC.
Site Completed: BSC Completed 10 and BTS Completed 150(approx.)
Working Responsibilities:
Installation of BTS and BSC.
E1 & Alarm Patching.
Subcon Management & AT-Report Preparing.
Operator: HUTCH(UP,Haryana,Punjub,Rajasthan)
Equipment / Project: BTS (Motorola H-II) & NEC-Microwave / GSM Project
Site Completed: 50(approx.)
Working Responsibilities:
Subcon Management & AT-Report Preparing.
Installation & Commissioning of BTS & NEC Microwave.
E1 & Alarm Patching.
Operator: TTSL (Broadband) – Himachal & Delhi.
Equipment/Project: RADWIN -- Installation & Commissioning of 2.4 GHz. Ethernet /E1 Link
Hop Completed: 25 (approx.)
Working Responsibilities:
Team Leading and Technical Report & AT Report preparing.
Installation & Commissioning of 2.4 GHz link.
LOS Survey using 12 Channel Garmin GPS & E1 Terminating.
Rajasthan & west circle done the installation and testing of 1642,1660,1662
Worked on Motorola BTS and Harris Microwave for MTNL Delhi
Installation, commissioning and link alignment of around 250 hops of NEC microwave for RTL in HP circle
Worked on NOKIA BTS installation project for HUTCH Rajasthan
O&M of SDH/PDH Equipments (Nortel,Nec Pasolink).
Maintenance and commissioning of OME (Optical multiservice edge)6500 series.
Maintaining data sheet and monitoring of cell sites using optical network manager.
Knowledge of E1-tester,Optical power meter,Optical source meter.
Troubleshooting of Transport Equipments (OME6110,OME 6130,OME6500,TN-1C,TN-1X,4XE
Installation and commissioning of NORTEL SDH equipments.
Handling NE Integration of NORTEL SDH MUX, new NE visibility and line up of the NE within Optical Network.
Transmission Acceptance Testing of POIs with BSNL.
To Manage Routine Alarms in the Network.
To Investigate the alarms, resolve fault & reassurance with NOC.
Huawei bts Installation
To interact with Local vendors for environmental upkeep of sites.
Videocon and TTSL Project for Haryana
TTSL O&M Since for new delhi
Achievements: Successful in I & C of NEC Microwave & BTS
PASPORAT AVILABITY
Qualification
Matriculation from H.S.E.B. (HR)
3 Year Diploma Electronics &Telecommunications
Personal Profile:
Father’s Name
Gender
Marital Status Mr. Rajender Singh
Male
Married
Nationality
Language Skill Indian
English, Hindi.
Date of Birth
10.04.1980