CURRICULUM VITAE
Contect No. 009***********(KSA), 009*-********* (pakistan)
Email;***************@*****.***
Name : Aftab Hussain
Designation : Site Supervisors/General Foreman
Religion : Islam
Address in Pakistan : House No.862 street No.6 Model Town Kahutta
road Humak, Islamabad
Passport No. : AV 6897142
28th June,2011
Validity of Passport :
Educational Qualification : Passed Metric with sciences.
F.sc. with general science
Technical Qualification : Diploma of Associates Engineering three years.
: Diploma of Draughtsman six months.
: Surveying advances course with totalo station.
Computer Education : Auto Cad 2d and 3d course
: Microsoft Offices 2000 to 2006.
: Adobe photoshop, Flash, e.g.
: Auto cad 14 with AEG. Tools.
: Auto Cad 2001 to 2007 with 2D and 3D.
: E-Commerce.
Driving License : Holding valid Pakistan Driving License.
Languages Known : English, Arabic and Urdu.
Languages writing : English and Urdu.
Professional Experience : Eight and half years of experience in the Gulf in
different types of projects in different company
: More then four years working in pakistan in
different different types of roads and buildings..
1) At present working with Al Rashed Trading and Contracting company
in K. S.A. from 5th january 2011 to till date Jezan immegrants
housing project in jezan as a Civil Forman.
Duties and Responsibality:
1 Finishing work with a team different types of villas.
2 Take off material quantity as requirement on site.
3 Assign finishig work with labour plustring block work tiling etc.
4 Order material through store follow the approval materials from the store.
5 Co-ordination with consultants, Clints and other sub contractors
.
2) Working with H.B.K.(Qatar) L. L. C. as a Senior Civil Foreman/
Supervisor from 09.05.2008 to 13.3.2010.
Domestic Solid Waste Mangement Center Projects.
Duties and Responsibilities:
1
Take off material quantity as requirement on site.
1 Ordering aproved materials, following up the material requirement through main
store, purchasing department, and the suppliers to receive the materials at the
required time.
2 Supervision of job at site with best quality to achieve local and international
Standards in installation, testing and commissioning of all Civil Works systems.
3 Preparing daily worksheet, weekly progress report, monthly progress report etc.
4 Preparing the monthly Bills, preparing quotations for variations, and bills etc.
5 Giving details and informations for shop drawings and as Built Drawings.
Scope of work in Brief
6 Co-ordination with consultants, Clints and other sub contractors.
7 Giving details for shop drawings, variations due to site conditions and clints
modifications, correction details for as Built Drawings.
8 Starting the work from footing to fifth stories buildings DSWMC for infrastracture
building and commercial building and Solid Waste Plant.
9 Excevation the area for foundation work.
10 Fabricate the all kinds of shutter for Column and wall fixing.
11 Making the barbanding schedul for site and fabricate steel on site.
12 Making the working scheduling and adoping o site.
13 Making barbanding schedule and arrange a team for steel cutting bending and
fixing.
14 Cheecking all work before inspection and neessary action taking for inspection and
clear work before inspection.
Duties & Responsibilities :
1 With a team of 85 workers, two Foreman, and three chargehands completed the
assigned job with in the scheduled time. The assigned works supervised individually
as follows:
1 Arange machinery for excevation and running the task and complete job according
the schedule time.
2 Arrange a team clear the area for blinding work.
3 Making form work in RCC slabs and structure.
4 Footing work,making shuttering for footing fixing and rebar fixing in footing. One
Charge hand is arrange for casting.
5 Core and column work arrange and Charge hang arrange for daily task.
6 Internal work of column and beam and cheecking all work as site condation and all
arrangement for consultants cheecking.
3) Working with Group five construction at Dubai in UAE
from 8th November 2005 to18th November 2007.
1 Duries and reswponsibality
. Estimate the materials for daily use on site.
Ordering aproved materials, following up the material requirement through main
store, purchasing department, and the suppliers to receive the materials at the
required time.
Preparing daily worksheet, weekly progress report, monthly progress report etc.
Preparing the monthly Bills, preparing quotations for variations, and bills etc
Giving details and informations for shop drawings and as Built Drawings.
Supervision of job at site with best quality achieve local and international
standards.
Scope of work in Brief
15 Co-ordination with consultants, Clints and other sub contractors.
16 Giving details for shop drawings, variations due to site conditions and clints
modifications, correction details for As Built Drawings.
17 Starting the work from the piling to seven stories building for car parking and cargo
building and connecting bridge.
18 Cut off the piling and excevation the area for foundation work.
19 Fabricate the all kinds of shutter for Core and Column and fixing for both.
20 Making the barbanding schedul for all site to make steels works on site.
21 Making the working scheduling and adoping o site.
22 Starting the piling work according to situation.
23 Internal use of material in the piling and a team prepair to do task
24 Cutting the piling and ecevation the area according the requiremen.
25 Fabricate shutter for Core and Column f ixing shutter for both.
26 One core wall Form work maxinum two days and casting.
4) Working with Reza investment company in the Kingdom of
Soudia Arabia from 2001 to 2004.
Duties and responsibality
27
Special work on swimming pool courts and sports works.
With the team of 23 workers with three charge hand complete the task.
28 Co-ordination with consultants, Clints and other sub contractors.
29 Giving details for shop drawings, variations due to site conditions and clints
modifications, correction details for As Built Drawings.
30 Starting the work from footing to2nd stories buildings.
31 Prepair daily progress report for work on site.
32 Fabricate the all kinds of shutter for Core and Column and fixing for both.
33 Making the barbanding schedul for all site to make steels works on site.
34 Making the working scheduling and adoping on site.
35 Modification correction details for as built drawings.
36 Supervise the job as local and international standared.
5) Working with FLS. Pakistan from11th March 1998 to 2001 in
Pakistan as Civil Foreman.
37 Duties and responsibality
38 Working in the different types of buildings including factorie, government buildings
and roads works.
39 Layout of footing work column and beam forming work of column and work.
40 Block, pleastering and finishing work according to contract.
41 Finishing work of vilas and different types of buildings.
42 Purcheasing ordering materials. Required o n site through local or main store.
43 Scope of works
44 Co-ordinates with consultants, Clints and other subcontractors.
45 With a team of 30 workers, completed the assigned job with in the scheduled time.
The assigned work supervised individually.