Christopher W. Hart 817-***-****
**** ****** **** ***** #****, Arlington, TX 76011 ************@*****.***
Professional Profile
1. Qualifications:
2. 25 Years Electronic Technician
1. 10 Years Mechanical / Electromechanical troubleshooting and repair of PLC based factory
automation equipment – pneumatics, conveyors, solenoids, motors,
2. 10 Years Field Engineering / Installation
3. 25 Years Electronic / Mechanical Assembly and Installation – soldering, cabling, wire tying,
shrink wrapping
4. 14 Years Installation / Project Management
5. 10 Years Technical Support / Training
1. 10 Years QA / QC Inspection - micrometers, calipers, dial gauges, measuring devices
1. 11 Years supervising / mentoring / peer development
2. 7 Years machine experience with PLC controlled equipment and Variable Frequency Drives
3. 8 Years Video Jet and Image Ink Jet Printer experience
4. IPC-A-610 Certified
Education:
ITT Technical Institute, Arlington, TX
1984-1986
3.47 GPA
Associates of Applied Science
Electronics Engineering
Professional Experience
Communications Test Design, INC. (Through Adecco Technical Resources)
2013 – Current
Electronic Technician
Activities:
1. Troubleshooting and repair of Cable TV network equipment and set top boxes.
2. Ensuring maximum throughput and disposition of backlogged repair items.
3. Oversee specific projects related to production and repair procedures.
National Presort, INC., Fort Worth, TX
2012
Technical Support / Customer Service
Responsibilities:
1. Phone Support to NPI customers for repair of mail sorting equipment
1. Setup and Test of sorting machines before shipping to customer
1. Camera calibration and test
4. Ink Jet printer calibration and repair
Northrop Grumman, INC., Elkridge, MD
2010-2012
Field Engineer / Technical Support / Trainer / Quality Assurance
Responsibilities:
2. Technical Support / Training of Northrop and US Post Office personnel on Postal Flats
Sequencing Sorter machine
2. Installation / Troubleshoot / Repair of Flats Sorter Machine
2. Validation / Performance Test and selloff of sorting machine
5. Quality Inspection of machined and welded parts – gears, pulleys, belts, electronic / electrical
parts for fit and finish
Siemens Infrastructure, Arlington, TX
2004 - 2009
Technical Support / Field Engineer / Project Manager / Quality Assurance
Achievements:
1. Promoted to Technical Support Engineer from Field Engineer
2. Developed a highly successful training course for USPS Maintenance personnel for Preventive /
Corrective Maintenance and machine optimization of Postal sorting machines.
1. Promoted to Team Lead of Installation Team within weeks of initial hire
2. Successfully Installed and performed Acceptance Testing of 85 Postal sorting machines
nationwide over 3 year period with 100% on time completion and Acceptance / Selloff
1. Developed team members and groomed them for Lead Positions
Responsibilities:
3. Phone and Field Technical Support for Siemens and Postal Technicians for troubleshooting and
repair of automation machines
3. Develop Technical documentation and notes
3. Use of schematics and test equipment for troubleshooting electronic and mechanical issues
6. Installation / Power up / Test of automation machines
1. Team Lead over Installation Team during 3 year nationwide machine deployment – 100% travel
2. Quality Assurance oversight of entire machine – electronic and mechanical parts, belts, frames,
leveling / straightness of machine all the way to finished product
Southlake Construction, Dallas, TX
2002 - 2004
Project Manager
Responsibilities:
4. Compile competitive bids for Interior Finish construction projects
5. Supervise projects to ensure on-time and quality completion
6. Oversight and correction of any substandard construction methods
Tek Systems / Worldcom INC., Richardson, TX
2000-2002
Project Manager
Responsibilities:
7. Managed up to 25 simultaneous Collocated Telecom Installation projects
8. Assessed Telecom Facilities for AC / DC power, HVAC capacity, and Fiber / DS1/DS3 signal
capacity
9. Defined all power and signal / bandwidth requirements for installation
10. Interacted with 5 different Account Management and Engineering groups to ensure on time
completion of telecom equipment installations
Delta Communications Garland, TX
1999-2000
Electronic Technician
Responsibilities:
11. Repair and programming of two way radios, amplifiers, and repeaters
12. Use of RF test equipment, oscilloscopes, multi-meters
13. Utilized electronic schematics for troubleshooting
Bearcom, INC, Dallas TX
1997-1999
Group Supervisor / Electronic Technician Quality Assurance
Responsibilities:
14. Managed group of 6 technicians
15. Responsible for training, supervision, hiring and firing of group employees
16. Repair and programming of two way radios, amplifiers, and repeaters
17. Use of RF test equipment, oscilloscopes, and meters
Nortel, INC., Richardson, TX
1996
Field Installation Engineer
Responsibilities:
18. Nationwide Installation of PCS Cellular Network
19. Switch equipment and cellular base station equipment installation, test, and turn up
20. 100% travel
21. Used RF test equipment for troubleshooting
22. Read physical layout plans and blueprints
Motorola, INC. Fort Worth, TX
1994-1996
Electronic / Test / Quality Assurance Technician
Responsibilities:
23. Oversee production line operations
24. Component level repair of cellular base station equipment
25. Interface with Engineering groups for improvement and finalization of prototypes
26. Quality Assurance inspection of finished product
27. Use of RF Test Equipment and electronic schematics
Nokia, INC. Fort Worth, TX
1993-1994
Electronic / Test / Quality Assurance Technician
Responsibilities:
28. Component level repair of cellular subscriber units
29. Used schematics, RF test equipment, oscilloscopes, and meters
30. Final Quality Test / Inspection of finished product before shipping