JINOY ANTONY P.
Career Objective
Secure a position in an organization that promises career
[pic] development. Look forward to grow along with the organization.
E-mail: Academic Profile
jinoy_antony@yahoo.c B-Tech in Electrical & Electronics Engineering ( 1st Class )
o.in JYOTHI ENGINEERING COLLEGE, CHERUTHURUTHY,THRISSUR-KERALA
jinoy.antony@gmail.c MBA IN PROJECT MANAGEMENT - Pursuing (4th semester Pursuing)
om SENSORIUM THRISSUR, KERALA.
Diploma in Electrical Engineering ( 1st Class )
THIAGARAJAR POLYTECHNIC COLLEGE, ALAGAPPANAGAR THRISSUR-KERALA
Contact No: Diploma In Project Planning & Management using PRIMAVERA
Saudi Arabia
+966-0592327200* Employment Records
(* preferred Number) Total Experience - 7 Year.
IN KINGDOM OF SAUDI ARABIA
India (Home) Sep 2012 onwards working with M/s. Sendan International Co. Ltd, as
+91-889******* an Electrical /
+91-944******* Planning Engineer for their YANBU ARAMCO SINOPEC REFINERY PROJECT
(Gasoline Package).
Job responsibilities
Present Address: Preparation of Work Schedule using Primavera.
Jinoy Antony Coordination with Client, Sub-contractors and Site Team.
Pavarattikaran House Substation erection.
Monitoring the site Work and Request Site Instruction for Variation
Manakody P.O. and Re-Work.
Thrissur, Kerala Lighting control System, fire alarm System Paging system and other
India. communication system installation, perforated tray and cable works
and Equipment grounding system work.
Installation of equipments like power transformers (45MVA, 10MVA),
Date of Birth : Station service Transformer 11KV/433V (2.5MVA), neutral grounding
04,March, 1986 transformer CTs, PTs, Circuit Breaker, Isolator, capacitor bank, and
lightning arrester.
Installation of various electrical motors
Passport Details: Earth mat laying and Equipment earthing
G9189442 Supervision of H.T, L.T, & Control cable Laying and Termination.
Valid till: 06 July Preparation of As-Built Drawings and getting approval.
2018 Proper Manpower allocation as per the Work requirement.
Drawing Preparation and getting Approval for additional work.
Preparation of reports for daily progress & Variation Work.
Possible Joining Preparation of monthly invoice as per the work progress and for
Time: 15 Days from variation work.
Offer Letter Vendor Assistance for testing and commissioning.
Receiving Date Coordination for clearing Punch List.
Working complies with ARAMCO & HSE standards.
Attending weekly meeting with client and preparation of MOM.
Current Salary:
2800.00 USD IN OMAN
April 2010 to May 2012 worked with M/s. Al Turki Enterprises L.L.C.,
Oman as an Electrical Engineer for their The Wave Muscat Project
Expected Salary: with top International Consultants like PARSONS INTERNATIONAL, W/s
Better than current ATKINS and COWI & PARTNERS. As an Electrical Engineer with over 5
salary, As per years experience in the Infrastructure and building services. I have
Company Standard extensive experience in the on-site execution, coordination and
supervision of HV, LV and ELV Electrical systems.
The Wave Muscat is a residential enclave set alongside six
kilometers of gulf of Oman consisting of District Cooling Plant,
apartments, town houses, village blocks, 750 villas, business park,
five star hotels & golf courses etc.,
Job responsibilities
Primary responsibilities are site execution, testing and
Nationality : Indian commissioning and technical meetings with consultants and client.
Daily reporting to Project manager & Coordinator.
Preparing shop drawing, get approval from the consultant/Client
on-site reviewing of shop drawings, raising TQ and clarify all the
Sex : Male Technical Queries in a thorough and timely manner, liaison with all
discipline to ensure a coordinated installation.
Co-ordination with Ministry of Electrical Department (MEDCo).
Marital Status: Preparation of Material Submittals, Method statements, Variations
Single etc., Preparation of Design drawing for variation works.
Conduct site inspections and discuss design issues with consultant
to ensure smooth operation of the site and no delays caused to
Religion : Christian project Progress.
Coordination with other engineering services as well as storm water,
TSE, portable water, Landscaping and chilled water drawings.
Co-ordination and meeting with relevant sub contractors.
License: Indian Preparation of Operation & Maintenance Manuals.
(Light + Transport Maintenance work for the entire wave project up to DLP period.
Vehicle) Material Procurement of using SAP.
Working complies with HSE standards.
Languages Known : Work Profile
English, Malayalam & Substation Erection, HV Cable-Laying from Grid Substation and
Testing of transformer, HV cable high pressure test and outgoing LV
Hindi (Read, Write & cable test.
speak) Inspecting Installation of District Cooling Plant & Pump Room
Tamil ( speak) Switchgears and other equipments.
Good knowledge of Transformers, Ring Main Unit, Electrical motors
and Main Feeder Pillars (3200A, 1600A
Reference: Installation of Street and Landscape Lights.
Providing Provision for Telecom, Building Management System, Access
Mr. Manual Dimaya Control System and CCTV in the entire Wave Muscat site.
Electrical Site Client: "The Wave" Muscat Oman.
Engineer
PARSONS INTL. Co. 3 ) IN QATAR - Mar 09
LLC. Experience in TRADEMEN Trading & Contracting CO W.L.L. Doha, Qatar
The Wave Project as an Electrical Design Engineer
Muscat, Oman Designing & Detailing of Small Power drawings as per the Client
Mob No: requirements and Kharamma Standards.
009**-******** Designing & Detailing of lighting drawings as per the client
requirements and Kharamma standards.
Checking the drawings and commenting the correction to the
draughtsman.
Attending the discussions with the client and understanding the
requirements.
Coordination with client
4)IN INDIA - March 2007 - March 2009
Experience in Kerala State Electricity Board Thrissur as an
Electrical Assistant Engineer (2007 to 2008 Night Shift)
Daily Operation and Maintenance of the 110KV substation. I got
enough exposure in the Maintenance & Operation of auto recloser,
panel board, Power Transformers, Circuit breakers, Current
transformers, Potential Transformers, Lightning arresters and Line /
Bus isolators.
Completed Projects Profiles
All External Electrical works for the Golf Academy (Substation
Erection, Both HV & LV Cable works, Landscape & Street lighting, ELV
Provision and Tapping HV Power from Overhead line through Horizontal
Thrust Bore to the substation).
E & I Work for Yanbu Aramco Sinopec Refinery Project (Gasoline
Package). (Ongoing)
Infrastructure & Electrical works for (B + G + 4) three Apartments
and Townhouses.
Infrastructure & Electrical works for 110 villas in The Wave
project.
Infrastructure & Electrical works for Oman sail (Almouj MARINA)
Dockyards.
Key Skills
PROJECT PERT/CPM Schedule for Monitoring and Control of Activities
Project co-ordination with customers, consultants, vendors and
sub-Contractors
Inspecting the Electrical site materials
Good interpersonal, Coordination and communication skills
Computer Proficiency
PRIMAVERA 6.0
AutoCAD
SAP
Pro-E
Microsoft office
I hereby declare that all the information's given above are true and
correct with the best of my knowledge and I bear the responsibility of
the above-mentioned particulars.
Date:
Yours Sincerely,
Jinoy Antony