CURRICULUM VITAE
Bhagwan Singh Bisht
E-mail: *************@*****.***
Mob: +966*********
Eager for a challenging job in a reputed organization where I can gainfully
utilize my experience in the Detail Design Engineering of Electrical
systems and grow with the team.
I have Skill in Electrical Design and 7.5 years of Experience in the field
of electrical Design & Detail Engg, Gulf Onshore Plant for Oil & Gas,
Power & Petrochemical Process Industry work. To work in a challenging
environment of a firm where I could prove myself and persistently
contribute to the growth of the organization.
SOFTWARE SKILLS
Electrical Calculations Software CG-Lux, Di-Lux, EDSA, ETAP
11.1.1
Plant Design & Review Software Intergraph's Smart Plant
Electrical & Smart Plant Review
CAD Software Auto CAD 2004/2006 &
Microstation V7.1/V8.0.
2 ENGINEERING SKILLS
. Performing various Power System analysis including Load Flow Study,
Short Circuit Study, Motor Starting Acceleration Study, Relay
Coordination Study, Arc Flash Study, Ground Grid & GPR Calculation,
Transient Stability, Harmonic Analysis.
. Selection & Sizing of Various LT & HT Electrical Equipments including
Transformer, DG, Circuit Breaker, PF Capacitor Banks, Battery & Battery
Charger Sizing
Preparation of Equipment Layout, Power Layout, Grounding Layout, Lighting
Layout & MTO.
Technical Bid Evaluation & Vendor Offer Review of MV/LV Switchgear, Power
Transformer
Preparation of Data Sheet for MV/LV Switchgear, Power Panel, Power &
Distribution Transformer, UPS, MV/LV
Motor
Familiar with IEC, IEEE, NEC, Saudi Aramco Standard
Undergone the ETAP Training organized by OTI at Al-Khobar (Saudi Arabia)
SIGNIFICANT STRENGTHS
ABILITY TO COORDINATE WITH GROUP OF PEOPLE WHILE EXECUTING MAJOR PROJECTS.
Good Communication (verbal and written) and Presentation skills.
WORK HISTORY
MUSTANG-HDP
SINCE NOV 2011 TO PRESENT
Project 1
Hail Bulk Plant
Project Description The Major Objective is Electrical System Design for Hail
Bulk Plant
Roles & Power System Studies (Load Flow, Short Circuit Study, Motor
Responsibilities Starting Acceleration Study, Protection Coordination Study
and Arc Flash Study, GPR and Ground Grid Calculation)
Electrical Engineering Calculation (MV & LV Cable Sizing,
Lighting Calculation,
125V DC Battery & Battery Charger Sizing)
Preparations of Layouts & Drawings (Cable Routing, Grounding,
Lighting,
Substation Equipment Layout).
Preparation of Data Sheets for MV & LV Switchgear, Power &
Distribution
Transformer, HV & LV Motor, UPS, Battery and Battery Charger
Tools Used ETAP 11.1.1, Di-LUX, MS Excel, MS Word
Project 2
Shoiba Bulk Plant
Project Description The Major Objective is Electrical System Design for Shoiba
Bulk Plant
Roles & Power System Studies (Load Flow, Short Circuit Study, Motor
Responsibilities Starting Acceleration Study, Arc Flash Study, GPR and Ground
Grid Calculation)
Electrical Engineering Calculation (MV & LV Cable Sizing,
Cable & Conduit
Schedule,125V DC Battery & Battery Charger Sizing,
Transformer Sizing
Calculation)
Preparation of Data Sheets for MV & LV Switchgear, Power &
Distribution Transformer, HV & LV Motor, UPS, Battery and
Battery Charger
Tools Used ETAP 11.1.1, MS Excel, MS Word
Project 3
Upgrade Trap Compressor Facilities at Safaniya
Project Description The Major Objective is Electrical System Design for Trap
Compressor Facilities
Roles & Power System Studies (Load Flow, Short Circuit Study, Motor
Responsibilities Starting Acceleration Study and Arc Flash Study)
Electrical Engineering Calculation ( MV & LV Cable Sizing,
Cable & Conduit
Schedule, MCC Sizing)
Preparation of Data Sheets for MCC, Power Panel, HV & LV
Motor
Preparation of Lighting Calculation & Panel Schedule
Vendor Document Review of MV Motors and LV Motors, Lighting
Transformer, MV and LV Switchgear and MCC's
Tools Used ETAP 11.1.1, Di-LUX, MS Excel, MS Word
Project 4
Expand LPG Production Facilities at Yanbu Refinery
Project Description The Major Objective is Electrical System Design for LPG
Production Facilities
Roles & Power System Studies (Load Flow, Short Circuit Study, Motor
Responsibilities Starting Acceleration Study, Protection Coordination Study
and Arc Flash Study)
Electrical Engineering Calculation (MV & LV Cable Sizing,
Cable & Conduit Schedule, Lighting Calculation & Panel
Schedule)
Preparations of Layouts & Drawings (Cable Routing, Grounding,
Lighting,
Substation Equipment Layout).
Preparation of Data Sheets for LV Switchgear, Lighting
Transformer, LV
Motor, UPS
Preparation of MTO
Tools Used ETAP 11.1.1, Di-LUX, MS Excel, MS Word
Project 5
Increase Riyadh-Qassim (RQ-1) Product Pipeline Capacity
Project Description The Major Objective is Electrical System Design for Hail
Bulk Plant
Roles & Power System Studies (Load Flow, Short Circuit Study, Motor
Responsibilities Starting Acceleration Study, Protection Coordination Study
and Arc Flash Study)
Electrical Engineering Calculation (MV & LV Cable Sizing,
Cable & Conduit Schedule, Lighting Calculation & Panel
Schedule)
Preparations of Layouts & Drawings ( Grounding, Lighting,
Substation
Equipment Layout).
Preparation of Data Sheets for MV & LV Switchgear, Power &
Distribution
Transformer, HV & LV Motor, UPS
Preparation of MTO
Tools Used ETAP 11.1.1, Di-LUX, MS Excel, MS Word
L&T-chiyoda, vadodara
Since june 2010 TO oct 2011
Project 1
Mangalore Refinery Petrochemical Limited
Project Description The Major Objective is Detail Design of Mangalore Refinery
Power System Studies (Load Flow, Short Circuit Study, Motor
Roles & Starting Acceleration Study, Protection Coordination Study
Responsibilities and Arc Flash Study)
Detail Engineering Calculation (HV & LV Cable Sizing,
Lightning Calculation,
110V DC Battery Load Cycle Calculations, Grounding
Calculation)
Preparations of Layouts & Drawings (Cable Routing, Grounding,
Lighting, Substation Equipment Layout).
Vendor Document Review of MV & LV Switchgear, Power &
Distribution Transformer, HV and MV Motor
Preparation of Data Sheets for MV & LV Switchgear, Power &
Distribution Transformer, HV & LV Motor, UPS, Battery and
Battery Charger
Tools Used ETAP 7.0.0, Luxicon, MS Excel, MS Word
Project 2
Indian Synthetic & Rubber Limited
Project Description The Major Objective is Detail Design of Indian Synthetic &
Rubber
Roles & Power System Studies (Load Flow, Short Circuit Study, Motor
Responsibilities Starting Acceleration Study, Protection Coordination Study)
Vendor Document Review of MV & LV Switchgear, Power &
Distribution Transformer
Preparation of Data Sheets for MV & LV Switchgear, Power &
Distribution Transformer, HV & LV Motor, UPS, Battery and
Battery Charger
Preparation of Material Requisition of MV & LV Switchgear,
Power Transformer
Preparation of Panel Schedule
Tools Used ETAP 7.0.0, MS Excel, MS Word
Rolta India Limited, Mumbai Since
Dec 2006 TO TILL DATE
Project 1
Tata Chemical Ltd. Mithapur (30 MW Power Plant)
Client's Tata Chemical Ltd. Mithapur
Name
Project The main objective is Detailed Engineering for 30 MW Power
Description Plant.
Roles & 1. Power System Studies (Load Flow, Short Circuit Study,
Responsibilities Motor Starting Acceleration
Study, Ground Grid & GPR Calculation)
2 Preparation of Single Line Diagram.
3. Preparation of Electrical Short Circuit Calculations.
4. Preparation of Cable Sizing Calculation
5 Preparation of Cable & Conduit Schedule
6 Lighting & Grounding Calculations & Layouts
7. Preparation of Data Sheet for MV & LV Switchgear, Power
Transformer, HV & LV
Motors.
8. Preparation of MTO
Tools Used ETAP 7.0.0, MS - Excel, SPEL, CG-LUX.
Project 2
NPCC Engineering Ltd.
Client's Name NPCC Engineering Ltd.
Project The main objective is Detailed Engineering for NC Revamping
Description Project.
Roles & 1. Preparation of Load List.
Responsibilities 2 Preparation of Cable Sizing Calculation.
3. Performing Calculations for Lighting Design using Lighting
Software CG-LUX.
4. Performing Short Circuit Calculations.
5. Preparation & Checking of Lighting, Grounding & Power
Layouts.
6. Preparation of JB Schedule & Cable Schedule.
Tools Used CG-LUX, MS-Excel, MS-Word
Project 3 Detailed Engineering of Phosphoric Acid Plant.
Client's Litwin, Italy.
Name
Project The main objective is Detailed Engineering for Phosphoric
Description Acid Plant at Saudi
Arabia.
Roles & 1 Power System Studies (Load Flow, Short Circuit Study,
Responsibilities Motor Starting Acceleration
Study, Ground Grid & GPR Calculation)
2 Preparation of Single Line Diagrams.
3. Preparation of Layout Drawings.
4. Preparation of Technical Specification of Electrical
items.
5. Preparation of Power, Lighting, Cable routing, Equipment
and Earthing Layouts. 6. Preparation of Data Sheet for
MV & LV Switchgear, Power Transformer, HV & LV
Motors.
7. Preparation of MTO
Tools Used ETAP 7.0.0, MS-Excel, MS-Word
Worked as Trainee Engineer
Roles & Responsibilities
. Work involved site Support Activity of Electrical Installation.
. Preparation of SLD & Wiring Diagrams.
. Preparing project schedules / plans.
. Follow up the Procurement of material.
EDUCATIONAL DETAILS
Examination Discipline/ School/college Board/ Percentage
Specializati University
on
B.E. Electrical Oriental Institute Of Rajiv Gandhi 72.00%
(2006) and Science and Prodhyokiki
Electronics Technology, Bhopal Vishwavidhyalaya,
Bhopal
H.S.C Mathematics- Red Rose Higher M.P. Board 76.00%
Secondary, Bhopal
Science
S. S. C S.S.C Red Rose Higher M.P. Board 70.00%
Secondary, Bhopal
2 PERSONAL DETAILS
Bhagwan Singh Bisht
Name Bhagwan Singh Bisht
Date of Birth 17th Dec 1983
Marital Status Unmarried
Passport F8762178
Details
AMITY INSTRUMECH, BHOPAL
JUNE 2006 TO NOV 2006
AMITY INSTRUMECH, BHOPAL
Sept.06 - Aug.07