AAMIR SHEHZAD
Lala Rukh Wahcantt
RAWALPINDI, Pakistan
CELL: +92-333-*******
Email: *****.*****@*****.***
OBJECTIVE
To work at a challenging and dynamic position in a progressive organization
where I can develop and utilize my skill sets in order to make a difference
in organization and myself.
FIELD OF INTEREST
New technologies related to Electrical/Electronics
SCHOLASTICS
Qualificati
on Year Institute Division/GPA
Technical 2001 Rawalpindi Institute Of Technology 2nd Division
Pakistan
Matriculati 1998 FG high School No.6 Wahcantt 1st Division
on Pakistan
CAREER HISTORY
Industrial Projects
I am responsible for project proposals, planning of a project, making
comparative study of different quotations of vendors/equipments for a
project, estimating budget requirements and bill of quantity (BOQ) for a
project, material procurement/order placement of equipments, execution of
the project and tie-in of a project on completion with the concerned
departments.crator, warmer, cooling towers, HP & LP compressors, water &
air cool chillers, water pumps, fillers, SMI.
Installation and commissioning of:
Blow mould. UNI-10(EPL) SBO-8 Universal-2(NBL) GHOZHU (NBL)
Labeler Krones S-15 Krones T-97
Injection mould. Hypet (EPL) Dryer (EPL) Dehumidifier
(EPL)
Flow Mixer. Ektam.1 (NBL) Ektam.2 (NBL)
Rinser. Didam (NBL) Nargis (NBL)
Caper Zalkin (NBL)
PEPSI NBL & HAIDRI BEV
Electronic Engineer
Feb 2008 - July 2013
Major Duties/ Responsibilities
Maintenance Activities;
I am responsible for streamlining the maintenance systems of E&I. NBL have
Blowing
machines with capacity 16000 bottles/hr. In this regard I plan weekly
maintenance for Blowing, Labeling and beverage machines from E&I's
perspective.
I am also responsible for the upkeep of the machines PLC systems and their
HMIs
and pneumatic systems to name a few. I have also planned regular
inspections of
the motors which gives us a snap-shot of the condition of all the motors on
a
weekly basis.
Troubleshooting & Inventory maintain
Preparation of data sheets. Spare parts updating, record keeping and
identifying by using of inventory maintain software and troubleshoot E&I
issues in minimum time. Understand E&I drawings and troubleshoot issues
through them. Repairing of electronic cards & machine parts. Update machine
drawings & manuals. Arrange Quotations & manage stock of imported parts for
our imported machines.
ECOPACK LTD HATTAR
Supervisor E&I
Nov 2004 - Jan 2008
Major Responsibilities:
Installation of field instruments, Maintenance of injection mold & blowing
machines. Arrange Quotations & manage stock of imported parts for our
imported machines. Troubleshoot machine issues in min time & work at
pending jobs related to E&I. Document particular troubleshooting methods
for record and history purpose. Preparation and implementation of
preventive maintenance schedule jobs.
> Relay logic system designing and troubleshooting
> Pressure, Temp and Level sensors.
> PLC System Siemens S7 (400,300,200)
> (MITSIBUSHI,OMRON,ALLEN BRADLY)
> Tempo sonic position sensors.
> Hydraulic system having 170bar pressure.
> Hydraulic servo valves (MOOG)
> Complete maintenance and knowledge of Pneumatic system and hydraulic
system.
SNGPL Pakistan
Plant Operator
March2001 - Feb2003
Major Responsibilities
> Took pressure reading of every hour by flow charts.
> Report head office in case of any abnormality at plant.
Personal Detail:
Date Of Birth: 15th SEP 1981
Place of Birth: Wah Cantt Islamabad
Fathers Name: Fakhar Ud Din
Martial Status: Married
Passport Number: HZ5146372
Dependents: 04
SKILLS AND INTERESTS
Music / Cricket/ Socializing and Networking
Reference:
Available upon Request