Post Job Free
Sign in

Management Engineering

Location:
Elkins Park, PA
Posted:
December 19, 2013

Contact this candidate

Resume:

MICHAEL S. HENTRICH

** ********* **** 609-***-****

Voorhees NJ, 08043 ****************@*****.***

Career Profile

ENGINEERING & PROGRAM PLANNING/MANAGEMENT/SOFTWARE KNOWLEDGE:

Program Planning and Risk Management

Open Plan, Cobra, Welcome Home, ROADS (Risk and Opportunity Database for Success), EWAD, (Electronic Work

Authorization Document)

Milestones Professional, Microsoft Word, Power Point, Project Professional, Excel/Excel Analysis tool packs

Engineering/Design

WindChill, Interlink, IDOCs, My Parts (Electronic Database of Mechanical and Electrical Drawings/Parts/Assemblies)

Wildfire 2.0, 3.0 Mentor Graphics (Circuit Board Design Program), AutoCAD, RasterCAD, MatLab, Mathematica,

MathCAD

MANAGEMENT, PM/PLANNING/ ENGINEERING RELATED TRAINING AND CERTIFICATIONS:

Certified Manager-Institute of Certified Professional Managers: College of Business-James Madison University (Feb 2011)

Engineering Management – College of Engineering Drexel University (April 2008)

Program/Project Management

MS2 Integrated Process Overview (Program Leads), MS2 Human Resources for the PM, Introduction to Risk

Management

Fundamentals of Program Management, Fundamentals of Capture Management, MS2 EAC Process – PMs

Systems Engineering, Advanced PPM (Program Performance Management) for Program Managers

Program/Project Planning and Risk Management

Commercial Lean Six Sigma Certification (Green Belt) – November 12’

Earned Value Management System (EVMS) Certification (CAM/Control Account Manager) – October 09’/11’/Current

Program Planning – Program/Project Management Training, MS2 EAC Process for CAMs Certification – April 10’

MS2 Risk Opportunity Assessment Database for Success (ROADS), User Training/Administrator Training, Risk +

SDRL IMS Green Belt/Black Belt Training (Customer Document Delivery, Subcontract Data Requirements List)

Program Performance Management System (PPMS), Program Performance Management Process (PPMP)

The Fundamental of Successful Project Management and Earned Value Basic Skill Path Training Class

Attends MS2 Monthly PPMS User Group Forum, MS2 EAC Process – Finance & Master Planning

F&BO Fundamentals of Variance Analysis, Planning/Scheduling 101, Planning/Scheduling 201

Engineering/Design

Pro-ENGINEER & Wildfire Training, ASME Y14 Geometric Dimensioning – Tolerance Class Certification – Sept 05’

Lockheed Martin Top Gun Engineering (Systems Engineering Certification) – June 10’

Lockheed Martin Top Gun Engineering - Principals of Modern Radar Engineering (2nd Systems Engineering

Certification) – September 11’

Certification, Peer Review & Test Record Training (PRTR)

1

MICHAEL S. HENTRICH

EMPLOYMENT EXPERIENCE

MST - Lockheed Martin Corporation, Moorestown, NJ

Lead Production/System Integration and Test Program Planner September 12’ - Present

Responsible for CAM efforts with-in Program Planning for BMD CLIN work

Write all schedules for BMD CLINs by organizing Program Management, Engineering, Program Planning, and Finance

Work directly with Program Management, Engineering, Sub-Contracts and Finance for all changes in IMS

Work TI (Technical Instruction) Extensions for all assigned CLINs

Attend IBR’s; (Integrated Baseline Review) sessions to determine efficiency and effectiveness of production schedule

Attend CAM Review Sessions to determine efficiency and effectiveness of production/test schedule

Work End of Month effort with entire team / Processes Metrics after End of Month is completed

Ensure correctness throughout project with entire team and customer as to ensure cost effectiveness and overall ability of

project

Risk/Opportunity Manager - System Integration and Test Program Planner November 11’ – September 12’

(Positions worked simultaneously)

Provided external communication of program risk/opportunities

Developed and maintained Risk/Opportunity Management Plan (ROMP)

Implemented and maintained Risk/Opportunity Management Data Base

Developed, maintained, and provided Risk/opportunity management training

Facilitated risk assessments, mitigation plans, and opportunity evaluation at team and program levels

Tracked mitigation efforts to reduce risk to acceptable levels

Ensured timely and complete tracking of all risk/opportunity issues

Ensured team level and program level risk/opportunity reviews were accomplished

Tracked opportunity capture efforts to support potential utilization

Prepared risk/opportunity briefings, reports, and documents required for Program Reviews

Worked with Program Manager to prioritize risks/opportunities

Responsible for CAM efforts with-in Program Planning for BMD CLIN work

Wrote all schedules for BMD CLINs by organizing Program Management, Engineering, Program Planning, and Finance

Worked directly with Program Management, Engineering, Sub-Contracts and Finance for all changes in the IMS

Worked all responsibilities outlined in Production/Development Program Planning roles below

Production/Development Program Planner-Program Management Office Operations May 10’ – November 11’

(Positions worked simultaneously)

Worked in Technical Business Manufacturing environment coordinating Program Management, Cost Account Managers,

and Technical Leads to ensure contracts are being carried out as written and planned

Worked with Project Engineers and Management with-in Manufacturing to ensure material is being delivered per

schedule

Worked with Project Engineers and Management with-in Manufacturing to ensure builds of Enclosures, Chassis,

Cabinets, and Lower Level Assemblies are being completed as scheduled

Worked with Lockheed Martin Clearwater and Lockheed Martin Akron to ensure Enclosures, Chassis, Cabinets, and

Lower Level Assemblies are completing as scheduled

Worked with Project Engineers with-in Manufacturing to ensure testing of equipment was completed according to

schedule

Worked Production Proposals by interacting with Program Management, Engineering, Finance, Sub-Contract

Management, and Business Development to create accurate BOE’s, schedule, and overall package for proposal

submission

Created involved BEI (Baseline Execution Index) charts to represent the following

o CUM BEI Start/Projected Start BEI/CUM BEI Finish/Projected Finish BEI

o Baseline Execution Finish/Program Incomplete Tasks

Adhered to monthly business rhythm working in WelcomHome, Open Plan, while Coordinating Live Status

2

MICHAEL S. HENTRICH

Development Program Planner-Surface System Planning March 09’ – April 11’

Worked in Technical Business Development environment coordinating Program Management, Cost Account Managers,

and Technical Leads to ensure contracts are being carried out as written and planned

Worked Earned Value Techniques and Performance Indicators as to integrate IMS with EV

Worked with multiple Sub-Contractors on a daily basis to ensure work efforts are being maintained

o Worked with Baltimore/Orlando/Sperry to ensure Software Deliveries are on schedule

o Analyzed and determined issues with Software Development processes

o Worked with Subcontractor for “Return to Green” plans when Software Development deviates from project

schedule

Prepared and coordinated the plans/schedules for new and existing programs

Adhered to the bi-monthly business rhythm, by creating turnaround documents and maintaining an efficient schedule

Wrote bi-monthly status documents for Financial Department as to monitor fluctuating periods of performance and

Earned Value data associated with all schedules for Program Management analysis

Maintained schedules outside of server environment in conjunction with LOE efforts to better keep the customer informed

of project milestone completions

Coordinated with Program/Financial Management to ensure milestones/program objectives are completed on time

Incorporated multiple revisions of budget release into schedule when prompted or when necessary (BCRs)

Maintained Tracking Book to show high level accomplishments in the IMP

Attended IBRs to fully support the program’s progress. Attended and participates in Grey/White/Black Hat Interviews

Attended Stakeholder Meetings to isolate key program problems and determine efficient solutions

Engineer-Hardware/Mechanical, Drafter-Designer-Mechanical/Electrical September 05’- March 09’

Accurately adhered to a budget while purchasing, scheduling, and tracking part procurement as to status a build schedule

Created and scheduled Testing Procedures, perform and carry out testing, analyzing schedule once complete as to perform

more efficiently for coming event(s)

Planned, schedule; create, write, follow, and implement MRs or Material Request for procedures and items outside of

PIOS (Parts Inventory Optimization System)

Planned, schedule; create, write, follow, and implement ENs or Engineering Notifications as to schedule different builds

and manufacturing procedures for SMB or System Monitoring Boards

Reported to Lead Engineer for IMS status of project to show completion of events, tasks, and procurement of material

Was Responsible for Commercial Cabinet build, design, wiring, strategic placement of chassis and PDU’s

Scheduled moves, builds, and correct installations of lab equipment in wiring shops

Supported the development of Cabinet and Radar layout and design, worked directly with Engineering

Created Mechanical and Electrical layouts in accordance with build schedule

Placed part orders and tracks part movement through cycles so build can adhere to overall schedule

Planned sub-assembly stack-ups, installing multiple tolerances sets for an accurate fit

Correctly planned the installation of resistors, capacitors, inductors, and other components as to fit board installations

Overall planned the correct release of drawings and parts for build and vendor purchase, using cost to determine budget

friendly material

EDUCATION

Drexel University, Philadelphia, PA

MS Mechanical Engineering, June 2009

MS Engineering Management, June 2009

Widener University, Chester, PA

BS Mechanical Engineering, December 2004

3



Contact this candidate