Post Job Free
Sign in

Management Engineering

Location:
Elkins Park, PA
Posted:
December 19, 2013

Contact this candidate

Resume:

MICHAEL S. HENTRICH

** ********* **** 609-***-****

Voorhees NJ, 08043 ****************@*****.***

Career Profile

ENGINEERING & PROGRAM PLANNING/MANAGEMENT/SOFTWARE KNOWLEDGE:

Program Planning and Risk Management

Open Plan, Cobra, Welcome Home, ROADS (Risk and Opportunity Database for Success), EWAD, (Electronic Work

•

Authorization Document)

Milestones Professional, Microsoft Word, Power Point, Project Professional, Excel/Excel Analysis tool packs

•

Engineering/Design

WindChill, Interlink, IDOCs, My Parts (Electronic Database of Mechanical and Electrical Drawings/Parts/Assemblies)

•

Wildfire 2.0, 3.0 Mentor Graphics (Circuit Board Design Program), AutoCAD, RasterCAD, MatLab, Mathematica,

•

MathCAD

MANAGEMENT, PM/PLANNING/ ENGINEERING RELATED TRAINING AND CERTIFICATIONS:

Certified Manager-Institute of Certified Professional Managers: College of Business-James Madison University (Feb 2011)

Engineering Management – College of Engineering Drexel University (April 2008)

Program/Project Management

MS2 Integrated Process Overview (Program Leads), MS2 Human Resources for the PM, Introduction to Risk

•

Management

Fundamentals of Program Management, Fundamentals of Capture Management, MS2 EAC Process – PMs

•

Systems Engineering, Advanced PPM (Program Performance Management) for Program Managers

•

Program/Project Planning and Risk Management

Commercial Lean Six Sigma Certification (Green Belt) – November 12’

Earned Value Management System (EVMS) Certification (CAM/Control Account Manager) – October 09’/11’/Current

Program Planning – Program/Project Management Training, MS2 EAC Process for CAMs Certification – April 10’

MS2 Risk Opportunity Assessment Database for Success (ROADS), User Training/Administrator Training, Risk +

•

SDRL IMS Green Belt/Black Belt Training (Customer Document Delivery, Subcontract Data Requirements List)

•

Program Performance Management System (PPMS), Program Performance Management Process (PPMP)

•

The Fundamental of Successful Project Management and Earned Value Basic Skill Path Training Class

•

Attends MS2 Monthly PPMS User Group Forum, MS2 EAC Process – Finance & Master Planning

•

F&BO Fundamentals of Variance Analysis, Planning/Scheduling 101, Planning/Scheduling 201

•

Engineering/Design

Pro-ENGINEER & Wildfire Training, ASME Y14 Geometric Dimensioning – Tolerance Class Certification – Sept 05’

Lockheed Martin Top Gun Engineering (Systems Engineering Certification) – June 10’

Lockheed Martin Top Gun Engineering - Principals of Modern Radar Engineering (2nd Systems Engineering

Certification) – September 11’

Certification, Peer Review & Test Record Training (PRTR)

•

1

MICHAEL S. HENTRICH

EMPLOYMENT EXPERIENCE

MST - Lockheed Martin Corporation, Moorestown, NJ

Lead Production/System Integration and Test Program Planner September 12’ - Present

Responsible for CAM efforts with-in Program Planning for BMD CLIN work

•

Write all schedules for BMD CLINs by organizing Program Management, Engineering, Program Planning, and Finance

•

Work directly with Program Management, Engineering, Sub-Contracts and Finance for all changes in IMS

•

Work TI (Technical Instruction) Extensions for all assigned CLINs

•

Attend IBR’s; (Integrated Baseline Review) sessions to determine efficiency and effectiveness of production schedule

•

Attend CAM Review Sessions to determine efficiency and effectiveness of production/test schedule

•

Work End of Month effort with entire team / Processes Metrics after End of Month is completed

•

Ensure correctness throughout project with entire team and customer as to ensure cost effectiveness and overall ability of

•

project

Risk/Opportunity Manager - System Integration and Test Program Planner November 11’ – September 12’

(Positions worked simultaneously)

Provided external communication of program risk/opportunities

•

Developed and maintained Risk/Opportunity Management Plan (ROMP)

•

Implemented and maintained Risk/Opportunity Management Data Base

•

Developed, maintained, and provided Risk/opportunity management training

•

Facilitated risk assessments, mitigation plans, and opportunity evaluation at team and program levels

•

Tracked mitigation efforts to reduce risk to acceptable levels

•

Ensured timely and complete tracking of all risk/opportunity issues

•

Ensured team level and program level risk/opportunity reviews were accomplished

•

Tracked opportunity capture efforts to support potential utilization

•

Prepared risk/opportunity briefings, reports, and documents required for Program Reviews

•

Worked with Program Manager to prioritize risks/opportunities

•

Responsible for CAM efforts with-in Program Planning for BMD CLIN work

•

Wrote all schedules for BMD CLINs by organizing Program Management, Engineering, Program Planning, and Finance

•

Worked directly with Program Management, Engineering, Sub-Contracts and Finance for all changes in the IMS

•

Worked all responsibilities outlined in Production/Development Program Planning roles below

•

Production/Development Program Planner-Program Management Office Operations May 10’ – November 11’

(Positions worked simultaneously)

Worked in Technical Business Manufacturing environment coordinating Program Management, Cost Account Managers,

•

and Technical Leads to ensure contracts are being carried out as written and planned

Worked with Project Engineers and Management with-in Manufacturing to ensure material is being delivered per

•

schedule

Worked with Project Engineers and Management with-in Manufacturing to ensure builds of Enclosures, Chassis,

•

Cabinets, and Lower Level Assemblies are being completed as scheduled

Worked with Lockheed Martin Clearwater and Lockheed Martin Akron to ensure Enclosures, Chassis, Cabinets, and

•

Lower Level Assemblies are completing as scheduled

Worked with Project Engineers with-in Manufacturing to ensure testing of equipment was completed according to

•

schedule

Worked Production Proposals by interacting with Program Management, Engineering, Finance, Sub-Contract

•

Management, and Business Development to create accurate BOE’s, schedule, and overall package for proposal

submission

Created involved BEI (Baseline Execution Index) charts to represent the following

•

o CUM BEI Start/Projected Start BEI/CUM BEI Finish/Projected Finish BEI

o Baseline Execution Finish/Program Incomplete Tasks

Adhered to monthly business rhythm working in WelcomHome, Open Plan, while Coordinating Live Status

•

2

MICHAEL S. HENTRICH

Development Program Planner-Surface System Planning March 09’ – April 11’

Worked in Technical Business Development environment coordinating Program Management, Cost Account Managers,

•

and Technical Leads to ensure contracts are being carried out as written and planned

Worked Earned Value Techniques and Performance Indicators as to integrate IMS with EV

•

Worked with multiple Sub-Contractors on a daily basis to ensure work efforts are being maintained

•

o Worked with Baltimore/Orlando/Sperry to ensure Software Deliveries are on schedule

o Analyzed and determined issues with Software Development processes

o Worked with Subcontractor for “Return to Green” plans when Software Development deviates from project

schedule

Prepared and coordinated the plans/schedules for new and existing programs

•

Adhered to the bi-monthly business rhythm, by creating turnaround documents and maintaining an efficient schedule

•

Wrote bi-monthly status documents for Financial Department as to monitor fluctuating periods of performance and

•

Earned Value data associated with all schedules for Program Management analysis

Maintained schedules outside of server environment in conjunction with LOE efforts to better keep the customer informed

•

of project milestone completions

Coordinated with Program/Financial Management to ensure milestones/program objectives are completed on time

•

Incorporated multiple revisions of budget release into schedule when prompted or when necessary (BCRs)

•

Maintained Tracking Book to show high level accomplishments in the IMP

•

Attended IBRs to fully support the program’s progress. Attended and participates in Grey/White/Black Hat Interviews

•

Attended Stakeholder Meetings to isolate key program problems and determine efficient solutions

•

Engineer-Hardware/Mechanical, Drafter-Designer-Mechanical/Electrical September 05’- March 09’

Accurately adhered to a budget while purchasing, scheduling, and tracking part procurement as to status a build schedule

•

Created and scheduled Testing Procedures, perform and carry out testing, analyzing schedule once complete as to perform

•

more efficiently for coming event(s)

Planned, schedule; create, write, follow, and implement MRs or Material Request for procedures and items outside of

•

PIOS (Parts Inventory Optimization System)

Planned, schedule; create, write, follow, and implement ENs or Engineering Notifications as to schedule different builds

•

and manufacturing procedures for SMB or System Monitoring Boards

Reported to Lead Engineer for IMS status of project to show completion of events, tasks, and procurement of material

•

Was Responsible for Commercial Cabinet build, design, wiring, strategic placement of chassis and PDU’s

•

Scheduled moves, builds, and correct installations of lab equipment in wiring shops

•

Supported the development of Cabinet and Radar layout and design, worked directly with Engineering

•

Created Mechanical and Electrical layouts in accordance with build schedule

•

Placed part orders and tracks part movement through cycles so build can adhere to overall schedule

•

Planned sub-assembly stack-ups, installing multiple tolerances sets for an accurate fit

•

Correctly planned the installation of resistors, capacitors, inductors, and other components as to fit board installations

•

Overall planned the correct release of drawings and parts for build and vendor purchase, using cost to determine budget

•

friendly material

EDUCATION

Drexel University, Philadelphia, PA

MS Mechanical Engineering, June 2009

MS Engineering Management, June 2009

Widener University, Chester, PA

BS Mechanical Engineering, December 2004

3



Contact this candidate