Post Job Free
Sign in

Engineer Maintenance

Location:
Baltimore, MD
Posted:
December 17, 2013

Contact this candidate

Resume:

Professional Experience:

Forest City

Maintenance Mechanic

June 2013 - November 2013

Baltimore, MD

. Responsible for boiler/chiller maintenance and building maintenance

. Troubleshot and repaired vertical multiple port stream boilers; 1725

pressure and MWHP of 125

. ARCO KC series low steam boilers and benchmark gas fire water boilers

. Operated, troubleshot, and repaired 10 boilers

. Troubleshot and repaired 3 chillers; 750 tons refrigeration load

. Responsible for chemical water readings

. Worked with MDS computer systems

. Responsible for building maintenance; air compressors, HVAC, air

handlers, elevator repairs, etc.

3CP LLC

May 2012- March 2013

Facility Stationary Engineer

Columbia, Maryland

. Plan, schedule and work orders

. Troubleshoot frequency drives, PLCs, Pneumatics, Hydraulics

. Coordinated and worked on related HVAC equipment

. Coordinated and maintained heating, ventilation, air conditioning, and

refrigeration shutdowns

. Monitored and repaired VAV boxes, heating, AC units, exhaust fans, and

testing equipment

. Operated self-contained cooling units, maintained computerized fire

systems

. Performed electrical, plumbing, drywall maintenance and repair work on

various units

. Worked on different low and high voltages; 480, 240, 120

. Performed fabrication, Arc welding job duties

. Log-out and Tag out

. Generators, switch gears, transfer switches

. Air compressors

United Medical Center

January2008- April 2011

Hvac Technician

Washington, D.C.

. Troubleshot S.C.U Lighting systems, garage exhaust systems and

replaced belts

. Actively participated in the implementation and ongoing evaluation of

preventative maintenance systems

. Maintained and operated boilers, chillers, HVAC Units

. Responded to all emergency situations, on call

. Welding experience

. Maintained medium to high voltage issues, electrical troubleshooting

. Repaired pumps, motors

. Worked closely with the Plant Operations Manager, electrical and

mechanical leads to oversee the proper functioning of all maintenance

equipment and life safety equipment

Potomac Property Management

June 2003- February 2006

Property Technician

Fairfax, Virginia

. Performed electrical, plumbing, drywall maintenance, and repair work

on various units

. Prepared and verified whether turn over units were ready for leasing

. Coordinated repair work assigned to contractors

. Ensured fire codes were up to date and yearly inspections completed

Smithfield Packing Company

February 1996- June 2000

Stationary Engineer

Landover, Maryland

. Operated Ammonia refrigeration systems

. Monitored water PH and cooling tower

. Worked on motors, pumps, and pneumatic hydraulic valves

. Maintained and operated auxiliary systems

. Boilers, Chillers

. Maintenance on packaging equipment, facility machinery

. Electrical troubleshooting

. Arc Welding, fabrication, Mig Welding

Certifications

1st Class Engineer License

Turbine Operation Class A

Turbine Maintenance Class A

Power Plant Technology B

Power Electrical Circuit A & B



Contact this candidate