Stephan Boutenko,
Aerospace Systems Engineer and Project Manager
**** ***** *****, *******, ** 97520
Email: *********@*********.*** • Phone: 206-***-****
OBJECTIVE
Experienced professional individual seeking a position in the aerospace industry
EXPERTISE
• Aeronautical Experience: 17 Years
• Boeing 787 Common Core Systems/A653
• Boeing 787 full flight simulator engineering/A610
• Highly familiarized with Boeing 747-400/8, and 787-8 flight decks
• Interface Control Document (ICD) Development and Process Management
• Requirements Development & Management
• Project Management, Development & Integration
• Aerospace systems nuisance alert and incident analysis
• Database Design, Processing, & Management
• Aeronautical Standards: ARINC 424, DO-178B, DO-200A, DO-272/276
• Test Development & Execution
• Extensive Avionics Knowledge: FMS, Flight Displays, TCAS, TAWS, T2CAS, ARINC 429, 664, and 653
• Wide variety of configuration management tools experience, including ClearQuest, ClearCase,
DOORS, StarTeam, Interbase, SLATE/FI and others
• Experimental aircraft ground and flight testing (Lancair IVP)
• Russian-English Bi-Lingual
EDUCATION
Bachelor of Science
Professional Aeronautics Major, Aviation Safety Minor
Embry-Riddle Aeronautical University (Seattle Campus)
CERTIFICATIONS
Professional Pilot and Certified Flight Instructor (1300 hours total flying time, Commercial, CFII, AMEL, ASEL)
RECENT EXPERIENCE
January 2013 – Present, Alternair, Inc.
Consulting Aerospace Systems Engineer (Alternair-Collinear Group consulting agreement):
• Presently working in the Flight Training Simulator Support Group on the 737MAX simulator data
package development.
February 2006, Systems Engineer, Tectura Corporation
Consulting Aerospace Systems Engineer to Boeing:
• Working in 787 simulation engineering group supporting ARINC 610B integration efforts.
• Crew Operations engineering – 747-8 Engineering Cabinet Simulator development.
• Interface Control Document (ICD) database development project lead.
• Projects include 747-8, 777 Freighter, and 767 Tanker programs.
• Requires coordination and project planning between design engineering and downstream users, which
include test integration, simulation and vendor groups.
• Critical paths are identified and tracked through MS Project, Milestone Professional, Excel, and Power
Point presentations and metric representations.
1315 Romeo Drive, Ashland, OR 97520 • 206-***-**** • Email: *********@*********.***
Acting as a lead on the ICD database re-hosting project from an old tool to a new, more common tool for all
•
aircraft platforms.
Working onsite at Boeing as a systems engineer responsible for requirements management on the 777 Freighter
•
Main Deck Cargo Door development and integration.
July 2004 – February 2006, Systems Engineer, ACSS
Worked with T2CAS system development and integration.
•
Served as engineering lead for Russian retrofit and forward-fit T2CAS systems on An-124, Tu-154, Tu-214 and Il-
•
76 type aircraft.
• Acted as a lead for TAWS database processing, development and distribution to the customers.
• Responsible for establishment and maintenance of DO-200A compliance for magnetic variation and performance
databases.
• Responsible for nuisance alert and incident analysis on the T2CAS systems
December 1999 – June 2004, Systems Engineer, Universal Avionics Corporation
Served as systems lead for FMS SCN 802.2 point release project, and the Universal Flight Planning (UFP) program
•
development project.
• Developed requirements for FMS software, implemented new changes and wrote tests to make sure the changes
have been implemented correctly.
• Responsible for processing raw ARINC 424 data from Jeppesen to the FMS compatible format using Universal
Navigation Data Processing software. Wrote requirements and test procedures for all Nav Database changes due
to ARINC 424 changes or FMS engineering.
• Helped establish the navigation database processing flow and requirements using DO-200A standards, as well as
represent the process during the qualification and audit.
• Developed requirements for Universal Flight Planning software (UFP) and participated in leading the program
development.
November 1998 – November 1999, Quality Control Coordinator, Jeppesen DataPlan, Inc.
• Responsible for ad hoc and regression test aviation flight planning software at Jeppesen Dataplan.
• Tested and documented software to comply with Y2K.
September 1996 – November 1998, Nav Data Analyst, Jeppesen Sanderson, Inc.
Researched aeronautical publications from around the world, collected and analyzed global data and compiled it
•
into a unified Master Database using ARINC 424 NavData convention.
Compiled Enroute and Terminal procedure charts using Intergraph Microstation.
•
OTHER RELEVANT EXPERIENCE
September 2005 – Present, Own Business, Classic Aviators, LLC.
• Part-time business teaching tailwheel endorsements and instrument flight instruction in a 1948 Cessna 140.
July 2001 – November 2003, Certified Flight Instructor, Snohomish Flying Service
Part-time primary flight instructor. Taught private and commercial certificate students (flight and ground
•
instruction).
March 1995 – April 1997, Certified Flight Instructor, Hulley Aero Training
Private and commercial student flight training.
•
Instrument ground instruction.
•
REFERENCES
Doug Emmerton – current colleague at Boeing, 787 Simulator Support. Telephone – 206-***-**** (work)
Andy Johnson – systems engineer at Collinear Group. Telephone – 206-***-**** (cell)
1315 Romeo Drive, Ashland, OR 97520 • 206-***-**** • Email: *********@*********.***