Post Job Free
Sign in

Project Manager Engineer

Location:
Mumbai, MH, India
Salary:
20 lac
Posted:
December 14, 2013

Contact this candidate

Resume:

* ********** *****

N.Sreedhar

Roads & Highways

********.******@*****.***

Cell No: +919********* (INDIA)

+918********* (INDIA)

Skype id: sree.nisha7

SUMMARY

Work Experience

Over 17 Years of construction experience in Road & Highways.

PROFESSIONAL PROFILE

2012 April - Till Design. Engineering, Finance, Procurement,

date construction operation and maintenance of FOUR LANING

OF KNT/KL Kerala section from Km 17.200 To Km 143.823

of NH -17 in the state of Kerala under NHDP PHASE III

of DBFOT Pattern. As a Project manger

2010 Aug- 2012 April With Agrigold Infra division as a Project Manager for

VC road NH5 from Vijayawada to Chilakaluripet.

2005 Feb - 2010Aug With HALCROW INTERNATIONAL PARTNERSHIP (HIP) as a

Assistant Resident engineer of Roads & Highways.

2004 June - 2005 Feb SMEC Consultant as a Highway engineer (Roads &

Highways).

2001 June - 2004 June With Contractor BSCPL as a Project

Manager/Construction Manger (Roads & Highways).

1996 July - 2001 June With Contractor BSC-RBM-PATI (JV) as a Site Engineer

for Road & Highways.

EDUCATION

B.E Civil Engineering from Vinayaka Missions University.

D.C.E Diploma in Civil Engineering Technical board of

education

MEMBERSHIP OF INDIAN ROAD CONGRESS (IRC)

PERSONAL REFERENCE

Driving License U.A.E/INDIA

Passport No K 4739008

Languages Known English, Hindi & Telugu

Date of Birth 04-08-1978

Place of Birth Kadapa (Dist) Andhra pradesh state (INDIA)

PROJECTS INFORMATIONS

Project 1 Design. Engineering, Finance, Procurement,

construction operation and maintenance of FOUR LANING

OF KNT/KL Kerala section from Km 17.200 To Km 143.823

of NH -17 in the state of Kerala under NHDP PHASE III

of DBFOT Pattern.

Employer NHAI

Position Project Manager

Contractor M/S Transstroy India Ltd.

Duration 2012 April -Till date

Project cost 1157 Cr

Project 2 Construction of Six Lane NHAI Road from Vijayawada To

Chilakaluri pet form CH 100 to 142 km in Andhra

Pradesh.

Employer IJM Infra.

Position Project Manager

Contractor Agri Gold infra division

Duration 2010 Aug - 2012 April

Project cost 700 Cr

Responsibilities of above projects 1 &2:-

Construction of different stages like Embankment, Sub grade, Granular Sub

base (GSB), Wet Mix Macadam (WMM), Dense Bitumen Macadam (DBM), and

Bituminous Concrete (BC).

Construction supervision of all major minor bridges.

Preparation of Original Ground Level by Clearing, Grubbing & Compaction using

imported machinery.

Concrete works like Kerb, Cross Drainage works.

Practical working experience with Electronic Sensor pavers like TITAN, VOGLE,

DEMAC and APPOLLO.

Knowledge of working with MITSUBUSHI, KOMATSU and L&T Graders and DYNAPAC,

BOMAG Rollers.

Executing all pavement layers as per British standards.

Knowing different types of tests like Field Density test using Sand

replacement method and Nuclear Density Gauge (Troxler 3440) & Core cutting

tests.

Maintaining day to day daily records of all events relevant to works,

including reasons for Shortfall if any and mitigating measures. Examine and

maintain the monthly progress Reports

Fixing the Center Line Alignment by using Electronic Total Station LEICA

(305, 607), SOKKIA (Set5, Set7) (TOPCON GTS-212) in N-E-Z Co-ordinate system

of instrument.

Setting out of Simple circular curves, Transition curves, Compound curves and

Vertical curves.

Setting out of Cross Junctions and Tee Junctions with right angle and skew

angles as per IRC specification.

Monitoring of all Departments related Technical & Administration.

Reporting day to day activities on site to DVP/VP.

Reporting day to day activities on site to consultant and Department peoples.

Resolving all issues' related Technical and Administration.

Attending meetings with client.

In charge of all correspondence letters to the project related.

Resolving all local issues related to the work.

Project 3 Al jais mountain road ch 0 to 36 km in Ras Al khaimah

construction, Supervision of road pavements layers

minor & major bridges

Employer Halcrow International Partnership.

Position Assistant Resident engineer as a consultant.

Contractor JMC contracting company.

Duration 2005 Feb - 2010 Aug

Client Ras-Al-Khaimah Government, UAE.

Project cost US $ 150 million.

Responsibilities of above project 3:-

Construction of different stages like Embankment, Sub grade, Granular Sub

base (GSB), Wet Mix Macadam (WMM), Dense Bitumen Macadam (DBM), and

Bituminous Concrete (BC).

Heavy hill rock blasting operatations and protection works for rocking

falling.

Construction supervision of all major minor bridges.

Preparation of Original Ground Level by Clearing, Grubbing & Compaction using

imported machinery.

Concrete works like Kerb, Cross Drainage works.

Practical working experience with Electronic Sensor pavers like TITAN, VOGLE,

DEMAC and APPOLLO.

Knowledge of working with MITSUBUSHI, KOMATSU and L&T Graders and DYNAPAC,

BOMAG Rollers.

Executing all pavement layers as per British standards.

Knowing different types of tests like Field Density test using Sand

replacement method and Nuclear Density Gauge (Troxler 3440) & Core cutting

tests.

Maintaining day to day daily records of all events relevant to works,

including reasons for Shortfall if any and mitigating measures. Examine and

maintain the monthly progress Reports

Fixing the Center Line Alignment by using Electronic Total Station LEICA

(305, 607), SOKKIA (Set5, Set7) (TOPCON GTS-212) in N-E-Z Co-ordinate system

of instrument.

Setting out of Simple circular curves, Transition curves, Compound curves and

Vertical curves.

Setting out of Cross Junctions and Tee Junctions with right angle and skew

angles as per IRC specification.

Drawing & Designing of Alignment & Junctions with the help of computer in

Auto-CAD Microsoft Excel.

Taking Original Ground Levels and shifting Temporary Bench Marks (TBM) by

using AUTOLEVELS (SOKKIA, TOPCON) having micro meter attachments.

Preparing cross section and longitudinal sections for new road as well as for

old road.

Designing Profile-corrective course for old two-lane two-way camber road

considering the proper longitudinal gradient with economical view point by

the use of computer in Microsoft Excel.

Project 4 Hiruyur - Bellary State Highway (SH) Rehabilitation

&to 2 -lane C/Way KSHIP Projects

Employer SMEC (Snowy Mountains Engineering Corporation Ltd.)

Position Highway engineer.

Contractor Gayathree Construction Ltd.

Duration 2004 June - 2005 Feb.

Client National Highways Authority of India

Consultant Snowy Mountains engineering corporation Ltd. (SMEC)

Australia in association with Span and Stellar.

Project cost 340 Cr

Project 5 Kishnagarh - Udaipur Road Project (NH-79), Under NHAI.

Rehabilitation & Upgrading to 4/6 lane divided

carriageway for

Kishangarh-Nasirabad-Bhilwara-Chittorgarh-Udaipur

Section of NH 79 NH 76 & NH 8-Package KU-IV from

Bhilwara bypass & Bhilwara (Km.120/0 of NH 79) to

Chittorgarh (Km.183/0 of NH 79) in the State Of

Rajasthan.

Employer B. Seenaiah & Co (Projects) Ltd, Bhilawara.

Position Project Manger for Roads & Highways.

Duration 2002 June - 2004 June.

Client National Highways Authority of India.

Consultant SNC-LAVALIN INTERNATIONAL in Association with

SHELADIA ASSOCIATES & Consultants (India) Pvt. Ltd.

Project cost 400 Cr

Project 6 Widening to 4/6 -lanes and strengthening of existing

2-Lane carriage Way of NH-60 in the state of west

Bengal from Km53 To Km 119 LAXMANATH-KARAGPUR

Employer B.Seenaiah & Co (Projects) Ltd, Bhilawara

Role Construction Manager for Roads & Highways

Duration 2001 June - 2002 June.

Client National Highways Authority of India

Consultant LBII in joint venture with NICE

Project cost 500 Cr

Project 7 Strengthening and Widening to Four Lanes from Gurgaon

Km.36.63 to Kotputli Km.162.50 Delhi - Jaipur Section

of NH-8 of (ADB Funded)

Employer BSC-RBM-PATI (JV) Indo Malaysian National highway

group.

Role Site Engineer Roads & Highways

Duration 1996 Jul - 2001 June.

Client National Highways Authority of India

Consultant Snowy Mountains Engineering Corporation Limited

(SMEC), Australia in association with CES, STUP and

RITES

Project cost 450 Cr

Responsibilities of above projects 4,5,6 & 7:-

Construction of flexible and rigid pavements at different stages like

Embankment, Sub grade, Granular Sub base (GSB), Wet Mix Macadam (WMM), Dense

Bitumen Macadam (DBM), Bituminous Concrete (BC), Dry Lean Concrete (DLC), and

Cement Concrete pavements (CCP).

Preparation of Original Ground Level by Clearing, Grubbing & Compaction using

imported machinery

Concrete works like Kerb, Cross Drainage works

Practical working experience with Electronic Sensor pavers like TITAN, VOGLE,

DEMAC and APPOLLO (mechanical).

Knowledge of working with MITSUBUSHI, KOMATSU and L&T Graders and DYNAPAC,

BOMAG Rollers.

Executing all pavement layers as per MORT&H Specifications.

Knowing different types of tests like Field Density test using Sand

replacement method and Nuclear Density Gauge (Troxler 3440) & Core cutting

tests.

Maintaining day to day daily records of all events relevant to works,

including reasons for shortfall if any and mitigating measures. Examine and

maintain the monthly progress Reports.

Fixing the Center Line Alignment by using Electronic Total Station LEICA

(305, 607), SOKKIA (Set5, Set7) (TOPCON GTS-212) in N-E-Z Co-ordinate system

of instrument.

Setting out of Simple circular curves, Transition curves, Compound curves and

Vertical curves

Setting out of Cross Junctions and Tee Junctions with right angle and skew

angles as per IRC specification.

Drawing & Designing of Alignment & Junctions with the help of computer in

Auto-CAD Microsoft Excel.

Taking Original Ground Levels and shifting Temporary Bench Marks (TBM) by

using AUTOLEVELS (SOKKIA, TOPCON) having micro meter attachments.

Preparing cross section and longitudinal sections for new road as well as for

old road.

Designing Profile-corrective course for old two-lane two-way camber road

considering the proper longitudinal gradient with economical view point by

the use of computer in Microsoft Excel.

Layouts of CD work i.e. culverts and Major, Minor Bridges etc by Total

Station.

Reference line marking for casting of Kerb.

Designing and supervising of Road Marking including junctions etc. as per IRC

35-1997.

Checking the Quantity of Works.

Monitoring of all Departments related Technical & Administration.

Reporting day to day activities on site to DVP/VP.

Reporting day to day activities on site to consultant and Department

peoples.

Resolving all issues' related Technical and Administration

Place :

Date : SIGNATRUE



Contact this candidate