Post Job Free
Sign in

Injection Molding Manager

Location:
Riverside, CA
Posted:
December 15, 2013

Contact this candidate

Resume:

Martin Solano

***** ******** **, ****** ******, CA 92557

951-***-****(H) 909-***-****(C)

*********@***.***

Objective

I am looking to obtain a position of production manager, in a company where I can utilize

my knowledge and assist in the development of the company through my vast experience

and willingness to learn. I have strong management and critical thinking skills which

allow me to maintain productivity. I can efficiently work in a demanding environment.

Skills Profile

•Experienced with Urethane foam, Poly Iso with 15 plus years of foam pouring

background in flexible and rigid foam industry.

•Strong hands in process skills, new mold start-ups, sampling, troubleshooting,

optimizing cycles.

•Mold set ups and closed loop on high and low density rigid foam molding production.

•Hydraulic pressures, pneumatic press stations, processing ovens, heaters and cooling

systems.

• Self Starter, experience in supervision of groups of 20 plus employees.

•Focus on safety and employee training.

•Excellent communication and computer skills. Familiar with ISO 9001:2000.

Employment History

Foam Molding Manager

TMI Molded Foam Technologies, Corona CA 02/2012-06/2012

•Supervised manual and robotic molding operations for pillows and the office seating

industry.

•Supervised the set-up & operations of high pressure reaction injection molding

machines.

•Execution of Quality Control Methods for line inspection & batch testing, liquid

changeover compliance and line startups.

•Consulting on new process, product and tooling modifications.

•Monitor and keep all daily, monthly, and annual production records.

Plant Operator

Ergon Asphalt & Emulsions, Fontana CA 06/14/2011 -01/27/2012

•Worked with various raw materials in the manufacturing of Asphalts.

•Responsible for following specific instructions and quantities to be used and productions

times required.

•Operate various equipment in the manufacture the products, such as mixers, scales,

kettler, and pumps.

Production Manager

Eagle Technologies, Rialto, CA 2008-02/04/2011

•Supervised robotics operation in fabrication of lightweight Shake for the roofing

industry and molded from real cedar samples to create a realistic wood appearance, from

advanced thermo set polymer

•Supervised the set-up & operations of high pressure reaction injection molding machines

(Krauss Mafeei, High Tech)

•Execution of Quality Control Methods for line inspection & batch testing, liquid

changeover compliance and line startups.

•Performed basic chemical testing, to insure product integrity (viscosity, specific gravity,

solids, and colors).

•Consulted on new process, product and tooling modifications.

•Monitored and kept all daily, monthly, and annual production records and ordered and

controlled material inventory.

Plant Manager

3D Carbon, Newport Beach, CA 2005-2008

•Supervised activities of employees engaged in fabrication and assembly of polyurethane

reaction injection molding (RIM), Elastomers. (Spoilers, Fender, Facials & Complete

auto body kits, made with O.E. urethane material)

•Supervised the set-up & operations of high pressure reaction injection molding machine

(KM)

•Scheduled and coordinated production for short and long runs, inspected finished

products to ensure quality standards, and the activities of employees supervised

•Ordered and controlled material inventory

Production Supervisor

Foam Molders and Specialties, Cerritos, CA 1993-2005

•Supervised activities of employees engaged in fabrication, assembly of molded

polyurethane reaction injection molding (RIM), rigid foam & elastomers (Spoilers,

Fenders, Facials and complete auto body kits)

•Supervised the set-up and operations of high and low pressure reaction injection

molding machines (Admiral, Hi-Tech, Cannon)

•Scheduled and coordinated production on short or long runs, inspect finished product

to ensure quality standards, in the activities of workers supervised

•Ordered and control material inventory

•Familiar QS 900/ISO 9000

Production Line Operator

Mitsubishi Consumer Electronics, Santa Ana, CA 1990-1993

• Electronics assembly of big screen televisions

Production Supervisor

Waxing Corporation of America, Orange, CA 1983-1990

•Armature of core assembly/armature insulation/winder machines

Education

•Microsoft Office course

Computer Education Institute, 2000

•60-hour course for Windows 95/Office 97

Selaco Pic Inc, 1999

•72-hour course for supervision and management

Selaco Pic Inc, 1998

•Supervision and management training

University of California, Los Angeles, 1998

•8-hour course/operation level-hazwoper

California State University, Dominguez Hills, February 1996

•High School Diploma

Mexico, 1975

References

Paul Mallorey

V.P. Manufacturing at Eagle Tech

909-***-**** (C)

909-***-**** (W)

Michael F. Palmosina

Senior Technical Service Specialist, RIM and Composite Specialty Systems Group at Bayer

Material Science

412-***-**** (W)

412-***-**** (C)

Roger Ervast

909-***-**** (C)

909-***-**** (H)



Contact this candidate