Post Job Free

Resume

Sign in

Electrical Engineer

Location:
New Delhi, DL, India
Posted:
December 13, 2013

Contact this candidate

Resume:

R.SUBRAMANIAN

Mobile: +91-917******* ~E-mail: acbnv1@r.postjobfree.com

Seeking senior level assignments in Project Planning & Execution (Electrical projects), Site Management, and Maintenance with a growth oriented organization

EDUCATION

DIPLOMA IN ELECTRICAL AND ELECTRONICS ENGINEERING with 13 years experience in construction field.

CAREER CONTOUR

Hirco Development Private Limited, Chennai Nov 2011- Till Date

As Sr. Engineer – Electrical

Project Management:

Co-ordination with detail engineering contractor, vendor, construction contractor in defining scope, finalizing the delivery list & schedule.

Ensuring interdepartmental co-ordination and establishing scope clarity in various mechanical/process packages.

Verification and sending the shop drawings submitted by the electrical contractors for consultant approval.

Inspection of all inward materials to the projects site.

Execution of the electrical works through Electrical contractors as per IMS standard.

TNEB liaison to get reliable construction power and permanent power for housings.

Monitoring stage wise work progress and reviewing on regular intervals.

Major Electrical Equipments Handled:

Transformer (Up to 15 MVA)

Generator (Up to 2MVA)

Switchboard(up to 33KV)

Standards:

Exposure to major International Standards like IEC, IEEE, BS, IS etc.

BUREAU VERITAS, Doha, Qatar. Oct 2010 – Sep 2011

As TPI E&I Inspector

Projects: - New Doha International Airport, Doha, Qatar.

Reporting to Project Manger/ Project General Manger

Third party inspection of Electrical installation.

Physical verification of Electrical installations in accordance with SLDs.

Verify the existence of identification tags.

Verify calibration of Level, Temperature, and Pressure Transmitters.

Witness insulation testing of junction boxes to instrumentation system.

Checking the condition of Electrical cables.

Documentation of Testing to client requirements.

J. Ray McDermott Eastern Hemisphere Ltd., Dubai, UAE. April 2010 – Sep 2010

As QA/QC E&I Inspector

Projects: - Shell GTL Pearl - 2

Reporting to Quality Manager

Reviewing all drawings and Specifications and ensure that properly related to the project.

Inspection of instruments support, instruments installation as per instrument layout drawing.

Witness of cables continuity and IR test before and after laying.

Inspection of cable tray and conduit installation.

Periodic inspection of instrument like a support installation, instrument installation, cable gland and termination, impulse tubing installation, impulse tubing testing and final loop testing.

Inspection of earth cable installation for building switch gear and instrument control room.

Inspection of lighting fixtures and power receptacle installation, cable termination and testing.

Witness of lighting loop circuit testing, illumination test and earth loop test.

Coordinate with site personnel and client representative regarding the implementation of Test Package procedures and closing out of all punch list items.

Closing of NCR’s & NCO’s based on consultant and Client Comments.

Documentation of all WIR, NCOs & NCR’s for the purpose of records & Details.

CASPIAN SHIPYARD COMPANY LTD, Baku, Azerbaijan. Sep 2008 – March 2010

As QA/QC Inspector

Reporting to QA/QC Head

Check material submittals conform to approved standards and specifications.

Check the materials against approved material submittals. Implement and complete weekly inspection activities.

Prepare necessary documentation (Request for Inspection, Inspection attachments, etc.)

To raise and document site non- conformances and investigate the corrective action.

Check the work performed by the construction group conforms to the approved construction drawings, specifications and standards.

Check and review construction/installation sketches and shop drawings, ensure that the sketches/drawings conform to the project specifications and standards.

Check and log requests for design change. Initial and forward to the Site superintendent.

Witness all tests to be performed on cables, equipments and electrical systems.

Prepare all original documents, i.e. 4-hour Motor runs, IR Test, continuity test, contactor resistance test, breaker insulation test, breaker full load current test, long time delay testing for breaker, short time delay testing for breaker & etc to support the Mechanical Completion Certificate (MCC).

STERLING AND WILSON (P) LTD, CHENNAI, INDIA. March’2002 to Aug’2008

As Sr. Engineer Projects

Projects: - 1. DLF IT Park, Chennai

2. Acsendas International IT Park (Phase II), Chennai

Duties and Responsibilities:

Inspection of open and concealed conduit as per drawing.

Inspection of Internal wiring for lighting and power receptacle.

Installation of JB, Cable Tray, Cable lying, Dressing and power of all the drive system of cabinet in operation room.

Inspection of step down oil and dry type transformers installation, cable termination and testing and commissioning.

Instrument installation and its cabling, termination, like all transmitters, pressure indicator, switches and thermocouples.

Involved in instrument testing and generation of test reports and to monitor subcontractor ongoing works.

Inspection of instrument loop check between fields to control room.

Ensure proper filing of documents.

Ice Ring Plant -20C (Chillers ) for Ice skating

Chillers Maintenance ( Air Cool system career )

FCU,AHU & TFA with Heart Wheel System carried out preventive maintenance

BMS Control ( Building Maintenance System )

Major Scope of Work:

Supply, Installation, Testing & commissioning of 33/11KV-5MVA Dry type Transformers.

Supply, Installation, Testing & Commissioning of 33KV & 11KV Switch Gears.

Supply, Installation, Testing & Commissioning of 11KV/433V-1.6MVA Transformer.

Supply, Installation, Testing & commissioning of 2 MW Generator.

Supply, Installation, Testing & Commissioning of Switch Boards & Panel Boards.

Supply, Installation, Testing & commissioning of Switch rack, Panel Boards, Marshalling Panels, Junction Boxes and Lighting Fixtures.

Supply, installation, modification, testing and commissioning of existing MCC.

PREMIER MILLS PVT LTD, Tirupur, Tamilnadu. Feb 2000 to Feb 2002

As Maintenance Engineer (Electrical)

Reporting to Plant Manager

Operation and Maintenance of LT/HT Panels

Attending the trouble shootings

IT SKILL SET

Operating Systems : Windows ‘98 and 2000

Package : MS Office 2000

PERSONAL DETAILS

Date of Birth : 09th July 1978.

Nationality : Indian

Passport No : G4912312

Father Name : R Rajagounder

Sex : Male

Marital Status : Married



Contact this candidate