VARINDER KUMAR
** ******* *****, *****************@*****.***
Brampton, ON L7A 3M3 Phone: 905-***-****
Resume
Civil and Structural
BE [Civil Engineering]
Extensive Experience Managing & Coordinating Construction Projects
. Experienced in construction management with multinational
organizations, Industrial and Commercial projects
. Ability to review and interpret working drawings to determine if
information is adequate for successful completion of construction
. Proficient in MS Word, MS Excel, MS Project, Outlook.
. Supervision of material testing e.g. soil testing, concrete testing,
base inspections, rebar inspections and other quality function.
. Proven analytical and problem solving skills, able to foresee/prevent
construction problems
. Quick to learn, cooperative and able to meet challenging deadlines in
a positive manner
. Writing of effective RFIs for missing details, discrepancies and
constructability issues
. The timely application of engineering theory in resolving
constructability issues
. All aspects of document control, cost control, strategic and work
force planning
. Document control, planning and scheduling
. Supervision, quality assurance and the coordination multidiscipline
activities
. Performance of quantity takeoffs, field inspections and quantity
reporting
. Provision of timely and effective engineering solutions for
construction deficiencies, NCRs
BACKGROUND
Graduated from "Thapar Institute of Engineering of Technology" India,
with Bachelor of Engineering degree in Civil Engineering I have a good
working knowledge of several other disciplines such as mechanical,
electrical, piping, firefighting and air conditioning etc. I am very
skilled at coordinating multiple disciplines and am adept to providing
solutions for conflicts. I am skilled in investigating and maintaining
documentations. I enjoy the challenge of learning, setting up new
methods and work well with people at all levels.
CAREER HISTORY
Apple Express Inc.
Mississauga, ON
Senior Logistics Coordinator
2011 - Till Date
. Served Client inquiries including delivery information, complaints,
client's requirements, monitored Logistics Board and processed order
via emails, phone calls and Fax.
. Consistently met or exceeded customer and corporate expectations by
time management, prioritizing tasks and meeting deadlines.
. Responsible for processing and coordination of shipments including
commercial invoices, communications with clients, pick up, delivery of
goods and documentation.
. Worked in time-critical environment and deal with customer support
challenges including inbounding all products daily into S-Plus,
delivery information, ensuring the daily completion of the order
process.
Line Steel Limited
Barrie, ON
Project Engineer
2007- 2010
. Assisted project Manager in a day to day activities and prepared
reports, shop Drawings, change orders and request for quotes.
. Monitored project progress against major milestone and recommended
corrective measures to ensure completion of activities as per
specifications.
. Maintained close communication with site supervisor and fabrication
department to ensure timely completion of project.
. Performed Quality control tests and prepared technical reports.
. Maintained records,schedule and documents and prepared reports.
K J Realtors Limited Delhi,
India
Project Coordinator
2002- 2006
Project: A US$ 10 Million Eight storied complex with two basements to house
200 car parking lots
. Monitored overall progress of the project and established a critical
path schedule on the estimated milestone progress dates and due
timelines in order to meet the contract completion dates.
. Liaised, communicated and consulted with engineers, architect, owner
and contractor and prepared economic feasibility studies on changes
and adjustments to cost estimates.
. Completed a final bid submission review and oversaw the final tender
document submission to the client in conjunction with Chief Estimator.
. Coordinated between civil and electromechanical agencies for smooth
completion of the project.
. Ensured quality standards were achieved for the work executed at the
site.
. Performed rate analysis of the extra items raised by the contractor,
not covered in the tender documents.
Unitech LTD.
Delhi, India
Project Engineer
1996- 2001
Project: An overall US$ 22 Million, buildings and infra-structural
development project. Project was a joint venture of Unitech Ltd. And
Singapore Consortium
. Supervised project development from feasibility stage to completion.
. Reviewed shop drawings, ensured adherence to QA/QC plan and company's
health and safety policies and procedures
. Checked the work done as per the project drawings and specification.
. Field inspection of sub grade for type of soil compaction, inspected
reinforcement and formwork prior to concrete pour.
. Reviewed and interpreted working drawings to determine if information
is adequate for successful completion of construction.
. Performed inspections of different materials received at site as per
standard specifications.
. Proposed construction joint locations in structural slabs to maintain
construction schedule
. Reviewed contract documents and participated in the development and
implementation of the project quality plan.
National Marbles Doha, Qatar
Site Engineer
1993- 1995
Project: High class interior work in multi storey shopping complex
. Procured marble and granite for the project at hand.
. Handled marble division independently including cutting and design
department.
. Supervised project site as per required standards in the tender
document
Education
BE Civil Engineering. Thapar Institute of Engineering Technology, India
1990
Affiliations: OACETT [Associate Member of Ontario Association of Certified
Engineering Technician and Technologist]
References available upon request