Post Job Free
Sign in

Project Manager Quality Assurance

Location:
Vancouver, BC, Canada
Posted:
December 12, 2013

Contact this candidate

Resume:

KULDIP SINGH P. Eng., PMP, LEED AP

Cell: 780-***-**** Phone: 587-***-****

Silver Berry Road NW Edmonton AB T6T2A7 E-mail: acbnim@r.postjobfree.com

R sum

PROJECT COORDINATOR

(CIVIL/STRUCTURAL)

(Industrial & Commercial Projects)

. 22 + years experience in construction management/ engineering with

prime organizations

on Oil and Gas, Power Substations, and Commercial projects.

. Self reliant/ self disciplined proactive, result focused, outgoing and

persuasive.

. Can handle multiple activities; decision maker; problem solver.

. Self motivated team player, able to achieve objective as part of a

group or individually.

. Ability to develop relationship with client, consultant,

subcontractors, suppliers as well as with co workers.

. Quick to learn, cooperative and able to meet challenging deadlines in

a positive manner.

. Research and recommend solutions to design document problems,

including conflicts, interferences and errors/omissions.

. Familiar with aspects of document control, cost control, strategic

and work face planning and turnover.

. Can handle multiple discipline coordination

. Ability to anticipate, understand and respond to the needs of

management, client and stakeholders to meet or exceed their

expectations.

. Excellent time management skills; attention to detail; and the

capacity to prioritize by assessing situations to determine urgency.

. Excellent verbal and written communication skills, Proficient in MS

Word, Excel, MS Project, Outlook, Contracts Manager (Primavera).

. Familiar with WCB, Alberta Occupational Health and Safety Codes and

industries safe work practices.

BACKGROUND

I graduated from "Thapar Institute of Engineering of Technology" India,

with Bachelor of Engineering degree in Civil/structural Engineering and

gained knowledge and experience from exposure to a vide variety of

construction projects with major international organizations including

Ledcor Industrial Inc AREVA T & D,ALSTOM, Quorex Construction, DS

Construction ltd. etc. My 22+ years of international experience in

construction include 6 years in North American, 8 year in the Middle East,

5 years in Libya and 3 years in India. I am registered with APEGA as a

professional member and I have gained experience through a series of

increasingly responsible positions from Junior Engineer Site Manager on

industrial and commercial projects. My expertise include leading

Engineering and coordination meetings, resolving engineering and

constructability issues, change management, document control, scope and

project controls and interaction with trades, consultants and clients.

Besides expertise in Civil and structural, I have experience working in a

multi-discipline project environment and I have a good working knowledge of

several other disciplines such as mechanical, electrical, piping and air

conditioning etc. I am very skilled at coordinating multiple disciplines

and am adept at providing solutions for conflicts. I have earned PMP

designation through my construction management experience and education. I

am a LEED Accredited Professional, have understanding of LEED certification

process and experience working on LEED project. I enjoy the challenge of

learning and setting up new methods and work well with people at all

levels.

CAREER HISTORY

May 2011-present

Ledcor Industrial Projects Ltd.

Responsibilities:

Lead Engineering Coordinator

Project: Kearl Oil Sand Project 1. Utilidor & HTT.

2. Kearl Tailings Distribution Expansion (KTDE) and 3. Kearl 2- Expansion

Project (KEP)

. Lead engineering meetings; participate in safety, contract and schedule

meetings, completion and material coordination meetings.

. Project administration including writing, discussing and tracking RFIs,

pricing for changes, review of shop drawings and coordination of

information provided and required by sub-trades and suppliers.

. Working closely with project manager, superintendents, project control

group, schedulers, turnover to communicate required information.

. Work closely with Quality Management Team to make sure adherence to

Project Quality Plan and meet client's quality standards. Review

NCRs/QSRs and propose NCR dispositions and preventive measures.

. Respond to subcontractors' and suppliers' technical and scope related

inquiries.

. Mentor, supervise and provide feedback in timely fashion to junior

coordinators of multiple disciplines and document control coordinator.

. Making sure material ordered and received as per specification and per

scope in a timely fashion.

. Reviewing and submitting plans and procedures, shop drawings, quality

documents for approvals.

Accomplishments: Acquired PMP certification, Registration with APEGA as

Professional Member (P.Eng.)

Mar. 2009-April 2011

Quorex Construction Ltd.

Responsibilities:

Project Coordinator.

Project: Place Riel Expansion and renovation (U of S Saskatoon)

. Reported to and worked closely with Project Manager to ensure that all

tasks associated with LEED certification are tracking well.

. Wrote queries to resolve construction issues, updated tracking list,

coordinated and addressed issues and concerns of sub trades, U of S,

FMD, USSU, architect and trade consultants.

. Attended meetings with client, consultants and major sub trades,

scheduled tasks, prepared deliverables, reported weekly progress,

validating LEED check list/approvals, priced for PCs &CDs, identified

and escalated issues to project Manager.

. Communicated with sub-trades, consultants, owner, suppliers and head

office.

. Prepared project quality plan, and I was solely responsible for the

project quality control and quality assurance.

Accomplishments: Acquired LEED AP certification. Completed the project

within budget and on schedule.

Nov. 2007 - Mar. 2009 Ledcor Industrial Projects Ltd.

Responsibilities: Civil/Structural Coordinator

Project: Suncor Firebag-Stage 3, Fort McMurray

. Determined scope of work from EWPs, prepared and issued Field

Installation Work packages (FIWP), wrote RFIs (used contracts manager

program), resolved engineering issues, quality control inspections,

verified work instructions were current, conducted field inspections,

assisted work face planning, provided reports on actual work completed

(used foreman work place program), cost control, recorded as-built and

coordination meetings.

Accomplishments:

. Successfully introduced and adopted FIWP (Field Installation work

Package) system to deliver engineering information, QAQC requirements,

materials, sequence of activities, equipment and tools required and

safety considerations to field personnel.

. Received performance bonus and outstanding employee award.

Aug. 2007 - Nov. 2007 Thurber Engineering Ltd., Edmonton, AB

Responsibilities: Field Technologist

Project: Shell Scotford Upgrader Expansion 1 -Fort Saskatchewan

. Monitored steel driven piles, quality assurance, prepared pile driven

logs.

Oct. 2001 - Apr. 2007 Areva T&D - Dubai, Abu Dhabi in UAE

Responsibilities: Civil Works Supervisor & Engineer

Projects: 400/132kV, 220/33/11kV, 400kV Substations at Abu Dhabi and Dubai.

. Supervised site activities, prepared weekly monthly progress reports,

design review, resolved constructability issue, multidiscipline

coordination meetings, scheduled monitoring, prepared invoices,

supervised quality control and quality assurance team and selected

subcontractors.

Accomplishments:

. Worked as civil works manager, 400kV/33kV/11kV substation commissioned

within 18 months from the date of contract awarded. Worked in two

shifts to achieve the milestone. AREVA secured other projects with the

client for their performance.

Jan. 1999 - Aug. 2001 RIGID Construction Group, Sarjah, UAE

Responsibilities: Project Engineer

Projects: Constructed Pre-Engineered steel structures factories,

warehouses, offices, Filling Station and shopping malls in Sharjah UAE.

May 1993 - July 1998 D.S. Construction Pvt Ltd., Libya

Responsibilities: Site Engineer / Site Manager

Projects: Al Fatah Tower (B+G+28+ revolving restaurant at top),

Construction of the G+ 4 residential complexes at Tripoli, Colour Coating &

Galvanizing Plant at LISCO Missurata and Jagboob to Egypt Road.

. Supervised formwork, finishes, joinery, marble cladding, concrete

pouring, and masonry of residential and commercial buildings, quality

control and quality assurance, road works and industrial plant

foundations.

Accomplishments:

. Enjoyed the opportunity to work at the building, tallest in Libya.

EDUCATION & PROFESSIONAL QUALIFICATIONS

BE Civil Engineering. Thapar Institute of Engineering Technology,

India, 1990.

Registration with APEGA as Professional Member (P.Eng.)

PMP- Project Management Professional- from Project Management

Institute (PMI).

LEED AP (LEED Canada- NC V 1.0- New Construction and Major

Renovations).

CERTIFICATIONS & TRAINING

. Health & Safety Training for Supervisors & Managers: CCOHS Canada.

. Construction Safety Training System' 'CSTS Ver. 3.2 includes WHMIS by

Alberta Construction Safety Association, and the 'UTILITIES' Module as

part of CSTS V2 program at IS2 staffing services.

. Leadership for Safety Excellence and Leading at Ledcor.

. Behaviour Based Observation (BBO) Training.

. Performance Management training.

. Standard First Aid-Level A CPR-St. John Ambulances.

Additional Information & References on Request



Contact this candidate