Post Job Free
Sign in

Plant operations

Location:
United States
Posted:
December 11, 2013

Contact this candidate

Resume:

Brian Wilson

**** *. ********** **

Germanton, NC 27019

336-***-****

***************@***.***

Objective: Seeking a position with a well established organization utilizing my comprehensive

experience in a continuous improvement environment using Lean Manufacturing concepts.

Leadership:

I’m a hands on type of manager that works well with people and developing a team oriented

staff in a team environment. Utilizing the DISC profiling method to determine each individuals

needs and ensuring that the proper technique for motivation and team development can be

achieved.

Work Experience:

3/13 – 11/2013 Merchants Metals, Statesville, NC- Plant Manager

• Plan and direct all daily functions of Plant Operations.

• Maintained a safe environment, implemented Safety Committee.

• Forecasting Budgets and maintaining P&L.

• Developed and implemented standards to increase efficiencies by 15%.

• Developed team members to work effectively in a team environment.

8/11- 3/2013 Diebold Inc. Lexington, NC- Production Manager

• Plan and direct daily activities for Operations.

• Lead Value Stream mapping, Kaizan events, and Lean continuous

improvement projects within a continuous processing environment.

• Forecasting Budgets and maintaining P&L within a 3% margin.

• Insure assembly process and associates are working safely.

• Schedule production to meet internal and external customer demands.

• Manage associate reviews and resource needs to maintain personnel

headcount.

• Insure daily inventories are reviewed for production needs and plan

accordingly.

6/07 – 9/2010 O’Neal Steel, Greensboro, NC - Production Manager

• Plan and direct supervisors to maintain Safety, Quality, and Reliability.

• Maintain budgets, P&L statements, and customer relations.

• IS9000 certified, maintain records, work instructions documentation, and

assist in Quarterly reviews process.

• Perform 8D corrective actions resolutions, root cause analysis, and the 5 why

process.

• Lead Value Stream mapping, Kaizan events, and Lean continuous

improvement projects within a continuous processing environment.

• Ensure processes are maintained with efficient production flow that meets

cycle and takt times.

• Team Building.

• Improvements made:

Safety – Led team to achieve 3 years without a lost time injury, and 1 year

without a recordable injury.

Reduced a 2% error rate to .36%.

Increased on time delivery from 44% to 95%.

11/05 - 6/07 O’Neal Steel, Shelbyville, IN - Production Supervisor

• Planned and directed the daily work force along with schedules.

• Ensured that safety and process controls were maintained.

• Implemented the 5S program and Lean Manufacturing concepts.

• Using Plasma/ Oxy Fuel to cut metal for the assembling process for

customers. Requirements from in to 8 in.

6/02 - 11/05 Visteon LLC, Connersville, IN - Distribution Analyst/ Machining Production

Supervisor

• Directed use of CMMS for shipping to service customers, Ford Motor Co, and

GMC.

• Planned and directed the daily work force, maintain schedules, inventories,

(Raw and WIP) in a continuous processing environment. Daily requirements

of production consisted of 4500 scroll components per shift

• Insured that safety and process controls were being followed.

• Abided by the collective bargaining agreement while maintaining production.

• Use of value stream mapping, 8D's, Kaizen, Jit, Lean-manufacturing process.

• Successfully implemented and maintained the 5Sprogram in scroll machining.

1/00 - 12/00 Casting Technology. Franklin, IN - Production Supervisor

• Maintained QS 9000.

• Supervised operation of 36 employees in a continuous processing

environment of 12 high pressure casting machines.

• Managed distribution of customers orders to ship on a daily basis to meet

General Motors and Delphi’s request.

• Managed safety, quality and training of hourly associates.

• Maintained schedules of daily orders and daily productions requirements of

4,500 steering knuckles per shift.

6/98 - 1/00 C.S. Integrated, Shelbyville, IN - Supervisor

• Managed the critical ripening process for top selling produce

• Maintained inventory and quality control

• Communicated with buyers on a daily basis.

6/96 - 6/98 Indiana Precision Technology. Greenfield, IN - 3rd Shift Manger

• Supervised Injector machining Dept, and Assembly Dept consisting of over

60 machining continuous processing including plastic injection processes.

• Maintained & managed daily time records, budgets, and attendance.

• Supervised 140 associates and 6 team leaders.

• Daily production requirements 13,600 injectors per shift.

2/88 - 6/96

4/01 – 6/02 Kroger Co. Indianapolis, IN – Production/Distribution Manager

• Maintained profit and loss statements along with budgets.

• Supervised 158 associates and 5 line supervisors, in a 24/7 365-day

operation.

• Maintaining continuous lean improvements in a high paced manufacturing

processing environment.

• Planned daily production requirements from raw materials to finished baked

goods. Processes: Mixing, panning, proofing, baking, wrapping to code, and

shipping to customers.

12/83 - 11/87 United States Army - 82nd Airborne Division

Education:

Indiana Wesleyan University, MBM

Indiana Wesleyan University, BA, Business Management

Certifications:

Green Belt Certified, Six Sigma

ITT - Leadership Development Program

American Institute of Baking – Certificate – Science of Baking



Contact this candidate