ART F. LOGRECO
San Diego, CA 92127 503-***-****
E-mail: acbkqp@r.postjobfree.com
EDUCATION:
Bachelor of Science in Business Management and Communications, Concordia
University.
WORK EXPERIENCE:
Jinx Inc., Poway, CA May 2013-Dec 2013
Position Held: Director of Supply Chain
Manage supply chain and production team. Optimized inventory through turns
and dynamic inventory modeling. Reduced total cost of purchased item and
services while growing business by 160% in 6 months. Refined the import
purchase process and established compliance testing for CPSA.
Cascade Microtech, Portland, OR May 2012 –May 2013
Position Held: Sr. Supply chain buyer
Manage supply chain by creating supplier performance modeling, Inventory turn
optimization, and reducing total cost. Established Best Known Methodology
process to help achieve lowest total cost of ownership and improved supplier
quality and performance. Developing requirements and processes to lead supply
chain into ISO certification.
Blount Intl., Portland, OR Oct 2008 – May 2012
Position Held: Supplier Development Engineer.
Manage supply chain by leading low cost country sourcing while improving
supply chain performance in support of manufacturing and retail channel. I have
extensive use of SAP to achieve lowest total cost of ownership through reducing
cost of poor quality and supply chain configuration. Established quality control,
planning, and manufacturing systems at supply base to reach quality and cost
targets with strong understanding of cost elements and drivers to lower total cost
of ownership. I managed quality and commercial aspects for all Oregon® and
Carlton® vended brands.
MERIX, Forest Grove, OR July 2006 – Oct 2008
Position Held: Quality Engineering Manager Nov 2007 to Oct 2008
Responsibilities: Own customer yields at Oregon Factories. Increased plant yield
by 3% by creating team to develop production plans to optimize customer design
requirements. Managed global supply chain of raw material and reduced
incoming defects by 84% in pursuit of 500 dpm goal through use of SPC, FMEA,
DOE and other tools and concepts. Managed global UL compliance requirements
and centralized our UL management to a single file to improve time to market
and reduce compliance cost.
Position Held: Supplier Quality Engineer July 2006 – Nov 2007
Responsibilities: Managed supply chain through product qualifications and
sourcing strategies. Help meet and maintain ISO requirements. Develop
relationships with supply base to meet continuous improvement targets and
maximize our ROI. Ensure supply chain can meet worldwide requirements.
Manage capacity utilization; resolve scheduling conflicts, and balance
supplier/customer demand/delivery expectations for product life cycle.
INTEL, Hillsboro, OR September 1997-July 2006
Position Held: Supplier quality engineer – Jul 04 - Jul 06 – Manage Intel retail
supply chain to improve quality, cost and time to market. Extensive use of CIP’s
and CAP’s to align supplier performance with Intel goals. Help launched Hong
Kong (2005) and automated Amsterdam (2006) facilities with local and global
supplied sources.
Position Held: New Product Introduction (NPI) planner– Mar 01- Jul 04 – Planned
new product realization and introduction for server/workstations chips.
Position Held: Reverse Osmosis Deionization (RODI) Tech –Sep 97- Mar 01
US FILTER, Hillsboro, OR. October 1995-September 1997
Position Held: Plant Lead
Responsibilities: Built and maintained a Reverse Osmosis Deionization (RODI)
and Acid Waste Neutralization (AWN) plant to support semiconductor fab
INTEL, Aloha, OR. June 1995-October1995
Position Held: Fab Technician
Responsibilities: integrated circuit semiconductor fabrication