GEORGE W. SLOAN / 408-***-**** / ***************@*****.*** /Colorado Springs,CO
Objective PROJECT MANAGER
Qualifications Over 9 Years experience in HVAC Piping / Plumbing Project Management /
Project Engineer / Estimation / Finished projects on time and under budget
Computer Skill ProjectWise, Bluebeam, Autodesk Navisworks, QuickPen & EST-MECH (TSI)
HVAC Piping / Plumbing Estimating Software, Word, Excel, Microsoft Project,
and Microsoft Outlook
Education California Polytechnic University, San Luis Obispo, CA
Energy Efficiency in Building Systems, Foothill College, Los Altos, CA
Degree: BS in Engineering Technology / Concentration: HVAC Design
Experience Pan Pacific Mechanical, (Union) Contractor, Menlo Park, CA
2012 Plumbing Project Engineer
Project: Plumbing for “The New Stanford Hospital” (Project Value $73,000,000)
(Reason for Leaving – Pre-Construction Only, Construction Contract Not Signed)
Re-Design of the pipe routing for the entire Medical Gas Piping System, created a
spreadsheet using this information which included over 1,000 rows of data, based
on a complete review of every Plumbing Plan View and Riser Diagram drawing, and
resulted in over 300 entries of identified problems into the Proje ct Clarification Log
Created an Equipment Schedule with over 700 rows of data, based on all of the
plumbing equipment schedules, the fuel oil major equipment schedule, and the
equipment information from sheet notes on every plumbing drawing, resulting in
another 100 entries of identified problems into the Project Clarification Log, this
Equipment Schedule included, dollar values, delivery dates, weights, quantities,
housekeeping pad information, tank manhole cover / hatch information, addendum
equipment and pricing changes, and reference information to locate items
Requested pricing from vendors and reviewed bids for correct pricing and inclusion
of specified equipment options, created plumbing equipment & fixture submittals,
and a hard copy of the Project Clarification Log and backup documents
The “New Stanford Hospital” project is LEED certified
2008 - 2010 Murray Company Mechanical, (Union) Contractor, Rancho Dominguez, CA
HVAC Piping / Plumbing Project Engineer / Estimation Team Leader
(Project Values $1,000,000 - $50,000,000)
(Reason for Leaving – Economy / Multiple Projects Canceled)
Reviewed project drawings for repeatable floors, assigned systems to estimators for
take-off, coordinated plumbing piping to Site Utility point of connections, wrote R FI’s
to clarify inconsistencies, created a bid letter clarification list for bid assumptions,
and created equipment pricing spreadsheets with vendor scopes of work
Supervised up to ten estimators using QuickPen estimating software, setup
QuickPen databases using project specifications and equipment / plumbing fixture
schedules, created QuickPen assemblies, reviewed individual take-off’s, combined
estimator take-off’s for bid summary, reviewed material & vendor pricing, created
bid summaries using take-off data, vendor pricing, and general conditions
Many of the project were LEED certified
University Marelich Mechanical, (Union) Contractor, Anaheim, CA
2007 - 2008
HVAC Piping / Plumbing Estimator (Project Values $1,000,000 - $ 5,000,000)
(Reason for Leaving – Economy / Loss of Indian Casino Market)
Lead implementation of the EST-Mech (TSI) estimating software, created material
services and equipment / fixture installation assemblies in the database, and linked
Harrison pricing service updates to the database
Performed material take-off’s of equipment, fixtures, and piping
Reviewed project drawings and specifications for inconsistencies and wrote RFI’s to
clarify, created a bid letter clarification list for bid assumptions, contacted
subcontractors and equipment vendors to secure bid pricing, and reviewed bids
2004 - 2007 J.W. McClenahan Company, (Union) Contractor, San Mateo, CA
HVAC Piping / Plumbing Project Manager / Estimator (Project Values Below)
(Reason for Leaving – Economy / Loss of San Francisco Condo Market)
Created commissioning documents and reviewed As-Built drawings
Attended monthly project review meeting and established project cost to complete
values after 50% completion
Developed project pay requests and submitted to owner / GC, and approved
subcontractor / vendor pay requests
Attended weekly MEP design meetings and MEP jobsite meetings, addressed any
installation problems or conflicts, and reviewed installation progress
Weekly review with foreman of project schedule and manpower requirements
Weekly monitoring of project material and labor cost reports
Created a change order log to monitor change order proposals
Estimated scope of work changes using QuickPen estimating software, wrote
change order proposals, and negotiated change orders with the GC or owner
Wrote RFI’s and monitored responses in an RFI log
Created billing schedule of values and labor code project cost breakdowns
Ordered equipment and plumbing fixtures based on approved submittals
Assembled project submittals from specifications and drawing information
Worked on LEED certified projects
2001 - 2002 THERMAL MECHANICAL, (Union) Contractor, Santa Clara, CA
HVAC Piping / Plumbing Project Manager / Estimator (Project Values Below)
(Reason for Leaving – Economy / General Slowdown in Market)
Attended monthly project review meeting, monitored project cost and site progress
on a weekly basis, estimated cost of change orders and negotiated change orders
with the GC, attended MEP meetings, wrote RFI’s, obtained subcontractor quotes,
ordered equipment, and assembled project submittals
SAMPLE ESTIMATION PROJECTS: (HVAC / Plumbing)
PROJECT TYPE VALUE DESCRIPTION
LAX Airport CUP Upgrade $50,000,000 Managed 10 Estimator Team / Design Assist / Hard Bid
LAX West Gate & Core Term. Exp. $30,000,000 Managed 4 Estimator Team / Plan & Spec. / Hard Bid
Torrance Memorial Hospital $40,000,000 Managed 6 Estimator Team / Design Build / GMP
Kaiser Anaheim Hospital $30,000,000 Managed 6 Estimator Team / Design Build / GMP
Riverside Community Hospital $32,000,000 Managed 4 Estimator Team / Design Assist / GMP
SAMPLE PM PROJECTS: (Up To 4 Projects Managed Concurrently / Value = $7,000,000)
NAME VALUE DESCRIPTION
675 Townsend St. $3,600,000 (131) Apartments and (17) Townhouses in five wood
San Francisco, CA frame buildings on a P/T podium deck, (16) commercial
Design/Build 195,000 Sqft. spaces with restrooms on the ground floor, two levels
Direct for Owner of underground parking, and a Condenser Water loop
De Anza Properties to the commercial space water source heat pumps.
E Bay Building 17 $1,300,000 Office Building (Design Assist) with a Cafeteria, Fitness
San Jose, CA Center, and Data Center on the ground floor, a LEED
Plan/Spec 245,000 Sqft. Project.
GC – Webcor Builders
On Broadway $1,100,000 Century Theater Project (Design Build), core and shell of
Redwood City, CA a two story building with theaters on the top floor and
Design/Build 125,000 Sqft. (17) commercial spaces on the ground floor w/ two levels
GC – Wentz Group of underground parking garage, POC services to spaces.
CUP Upgrade – Removed (3) chillers and pumps,
Stanford Linear Accelerator $ 600,000
Menlo Park, CA installed (3) chillers and pumps, and 500 ft. of piping.
Plan/Spec 20,000 Sqft. * Chillers purchased by owner