[pic]
KIRAN V.M.
Celebria apartment, flat No
Sholapur road, Hadpsar, Pune
Cell: +91-956*******; E-Mail: ***********@*****.***
[pic]
DESIGN ENGINEER (Hull-Outfitting & Structure)
Seeking challenging assignments for a career encompassing professional
advancement
. Astute professional with hands on experience approaching 8 years in new
shipbuilding & ship repair 3.3 years of overseas onsite working
experience (Singapore).
. Currently spearheading efforts as Technical Lead with M/S iGATE (P) Ltd.,
Pune.
. Technical proficiency in AVEVA MARINE & TRIBON M2/M3 (Planar Hull,
Structural Modeling, Nesting & Aveva P&ID) and AutoCAD 2000-2011
[pic]
PROFESSIONAL CHRONOLOGY:
M/S iGATE Computers Ltd, Pune (Engineering service division)
JAN 2012 - TILL DATE
Technical Lead - Design
M/S CONCEPTIA SOFTWARE TECHNOLOGIES (P) LTD., BANGALORE (Marine Division)
JUNE 2005 - DEC 2011
Sr. Design Engineer / Team Lead
Key Accountabilities:
. Providing specialized design engineering services to prestigious clients
across varied industrial segments. Additionally involved in repair jobs
for vessels.
. Reviewing existing systems & procedures and designed internal
controls/quality audit checks for various operational areas for achieving
higher operational efficiency, resource rationalization and cost
reduction.
. Ensuring all drawings produced to be correct in standard, right reference
and as per layout in compliance with the client's standards.
. Coordination with clients for project works.
Projects Profile:
Title Aveva Marine & Aveva P&ID testing & Dumb drawing Conversions/ Sea
Transport Support structure(RIG )/ (Ongoing Projects)
Client TECHNIP OFFSHORE FINLAND / AVEVA
Software AVEVA Marine & AVEVA P& ID,TRIBON & Auto Cad 2013 (Hull,
structure modeling& Nesting)
Pr cis Project involved Structural Modeling & generation of detailed
production drawing.
Responsibilit Assisting subordinates in interpretation of discrepancies found
ies in classification drawing.
Guiding subordinates for dumb drawing conversion(AUTOCAD TO P&ID
drawings (Intelligent drawing)
Involved in validation and certification activities for Aveva
Marine & Aveva P&ID Software applications developed at iGATE.
Title Offshore Support Vessel / 74.5 T Bulk carrier
Client ONGC Ltd, India & Golden Ocean
Duration Nov 2010 - Dec 2011
Location PIPAVAV SHIPYARD GUJARAT,INDIA
Responsibilit Preparing structural rectification plan / repair plan as per IACS
ies standards
Solving production quarries raised by production people.
Validating the Production drawings as per the basic design
drawings.
Raising the comments for the disturbance found in production
drawing as well as in basic design drawing.
Understands classification societies and statutory bodies like
IRS,DNV,ABS, SOLAS, IMO etc
Preparing foundation drawing for equipments.
Preparing of Statutory drawing like load line plan, Hull marking
plan and Visibility plan etc. as per class requirements.
Understands UKOOA requirements.
Title BO 623 Seismic Vessel
Client ST Marine, Singapore
Duration December 2009 - Sep 2010
Location Bangalore
Responsibilit Reviewing of production drawings & ensuring it for further
ies process of production.
Validation of model.
Nesting of plates for the reducing of scrap material up to 18%.
Title Sewage Barge
Client In House, Bangalore
Duration December 2009 - Sep 2010 (Worked simultaneously with ST
Marine project)
Location Bangalore
Responsibili Fire integrity plan as per IRS rule and Solas.
ties Referring the class rules.
Preparing Foundation drawings.
Door plan as per class requirement. Damage Control
Plan.
Ladder, platform and Handrail arrangement
Bollard arrangements & details
Prepare Furniture/sanitary schedule; write up for
accommodation.
Title Detail engineering of ship - BOREALIS-5000T-DP3
Client SEMBAWANG Shipyard (P) Ltd., Singapore
Duration 16 Months
Software TRIBON (Hull & structure modeling) & AutoCad-2007
Pr cis Outfitting installation (New built)
Responsibilit Checked structural drawing with existing ship.
ies Prepared outfitting drawings for production.
Title Detail engineering of Ship - SAPURA ACERGY-3000T
Client SEMBAWANG Shipyard (P) Ltd., Singapore
Duration 14 Months
Software TRIBON (Hull & structure modeling) & AutoCad-2007
Pr cis Outfitting installation (New built)
Responsibilit Checked structural drawings with existing ship.
ies Prepared outfitting drawings for production.
Carried out onboard checking.
Title Detail Engineering of LQ of ship D534
Client SEMBAWANG Shipyard (P) Ltd., Singapore
Duration 9 Months
Software TRIBON M3/Auto Cad - 2007
Pr cis Project involved Structure & Pipe Modeling of LQ.
Responsibilit Involved in Generating 3-D Model of the entire LQ using Tribon-M3
ies Planer Hull.
Checked the model developed referring to classification drawing.
Involved in preparation of Structural Fire Integrity Plan, Escape
Root Plan, Door Plan, Insulation Plan, Deck Covering and
Structural Modification Plan for Living Quarters.
Involved in preparing as built drawings.
Title Murphy Kikeh DTU Truss Spar Hull
Client Malaysia Marine & Heavy Engineer SDN. BHD
Duration 8 Months
Software TRIBON M2(Hull & Nesting)
Pr cis Project involved Structural Modeling & generation of detailed
production drawing.
Responsibilit Involved in Generating 3-D Model of Truss Spar Hull using
ies Tribon-M2 Planer Hull & Curved Hull which involved development of
Brackets, Pillars and Super structures.
Modeling of the shell plates, their seams and stiffeners.
Checking of model as per classification drawing.
Preparation of detailed Production drawing using TRIBON Drafting.
Assisting subordinates in interpretation of discrepancies found
in model & classification drawing.
Minor Projects:
Title P-15, P-17 ALFA
Client Mazgov Dock Ltd., Mumbai, India
Duration 2 Months ( Dec 05-Jan 06)
Software TRIBON M3/AutoCad 2005
Pr cis Project Involved Generating Model, Production drawings and
Preparing Layout drawings.
Responsibilit Involved in Generating 3-D Model from Tribon-M3 Planer Hull and
ies Curved Hull.
Preparation of Production drawing using AutoCAD 2005.
Involved in Checking of the production drawing
Nesting of plates
Title RO-Ro ships
Client L& T, Mumbai, INDIA
Duration 2 Months(Aug 09-Sep 09)
Software TRIBON M3/AutoCad 2005
Pr cis Project involved generating Model, Production drawings and
preparing Layout drawings.
Responsibilit Preparation of as-built drawings for structure and piping.
ies Taking MTO.
[pic]
ACADEMIA:
BACHELOR OF ENGINEERING (MECHANICAL)
B.V.B College of Engineering & Technology, Hubli, Karnataka;
[pic]
DATE OF BIRTH : 22nd March, 1980
LANGUAGES KNOWN : English, Hindi and Kannada
MARITAL STATUS : Married.
PASSPORT STATUS : expires March 2016
PERMANENT ADDRESS : #28, Lingarajnagar (North), Unkal Cross, Hubli,
Karnataka, India
REFERENCES : Available on Request.[pic]