P rofessional Resume

ALAN T. SAYLER

Senior Pipeline P rofessional

International and Domestic Pipelines and Facilit ies

**** ***** *** **** ****

D eer Park, Texas

77536

United States of America

***********@*****.***

281-***-****

P rofessional Resume

Education-Employment-P rofessional and Personal Work Skills &

E xperiences-P rofessional Affiliations

M r. Alan Sayler has over 32 years of extensive experience in domestic and international projects with

general management and VP operations in senior roles for construction management of major pipeline

p rojects and refinery, gas and power plants, mining infrastructure and pipeline construction frontend

support roles in routing, logistics, planning, engineering and estimating including hands on experience

w ith the ports, terminal, pump and compression facilities.

Early experience includes a very solid background in operations and maintenance supporting everyday

routine maintenance and operations roles in pipelines, terminals and refinery operations supporting

complex issues and daily routine engineering support.

A lan is an accomplished and versatile professional with a proven ability to guide world class Greenfield

p rojects through their entire life cycle including the support for major project teams during the efforts

for the conceptual and feasibility project phases through detailed engineering, estimating,

construction, scheduling, inspection, operations including maintenance with diverse national and

i nternational environments and cultures.

T hrough the 32 years of Alan’s career he was able to accomplish a goal of working for several different

companies achieving experience in multiple positions and tasks while gaining valued experience and

k nowledge that enables his expertise to be accepted in the industry without a 4 year degree in

engineering to carry out the types of projects and roles Alan likes to participate in.

Alan Sayler

P rofessional Resume

Alan is a skilled contributor with abilities well suited to a broad range of opportunities within the

oil/gas and mining industries with combined years of experience in the following;

32 Years working with Industry standards such as FERC, CPUC, API, ASME,

N ACE, AWS, DOT 192, DOT 195 and other codes and standards;

17 Years’ experience in major domestic and international capital project construction

i n the power plant, refinery, pipeline, refinery and petroleum industry on and

offshore, primarily in the pipeline area for NDT, Inspection, Supervision, Field

E ngineering and Consulting Owners Engineer;

10 Years of direct construction site management experience and managing others in

supervision roles;

10 Years Expert in Pipeline Route Selections, Pipeline Cost Estimates for Long

D istance and Large Diameter Pipelines International and Domestic;

7 Years of pipeline operations and maintenance support roles, including refinery and

terminals, onshore, and offshore USA Operations;

Subject Mat ter Expert in Pipelines and Construction, Expert Witness in Pipeline

C laims – Cases

Projects include; Capital Cost up to 6 Billion Dollar Investments 3 billion single

p ipelines.

E D UCAT IO N/CERT I F ICAT IONS

1961 - Farming and Ranching –Art Sayler School of Hard Work and Ethics Gar rison

North Dakota

1979 - High School Graduate Class of 1979 –Garr ison High School, Garr ison North

Dakota

1980 - Welding - Theory - Fabrication – Blue Print Layout Pipeline Welding and

Technology, University of North Dakota, Williston; Soren Sorensen Professional

Journeyman Tradesman

A lan Sayler

P rofessional Resume

1981 - Pipeline Welding and Fabrication Multi Qualified Pipeline Welder, AAA

Welding Amoco Pipeline, Tulsa Oklahoma; C.R. Frederick Professional Pipeline

Construction Manager

1982 - Welding Inspection, NDT, and Coating Applications Training Amoco Pipeline

1989 - NDT Interpretation Level I I API 1104, Frank Her ring NDT, Houston Texas

1993 - AWS CWI Welding Inspection Certification, American Welding Society,

Houston Texas

1988 - Coating Inspection NACE Level I, NACE In ternational, Miami Florida

1996 - NACE I I

1995 - AWS CWI

1993- API 653

32 years of hands on t raining provided by all employers for HES, Project

M anagement, Inspection, QAQC, Engineering, Management, other.

Hard Knox of oil and gas pipelines including t raining engineers.

E M P LOY ME N T H IS TORY

F luor – Sugar Land Texas

Senior Construction Manager 2013

PEMEX – Mexico City; GDF Suez & ICA Flour Proposal 726 km Gas Pipeline

Spectra Energy – Florida Power and Light Proposal Manager of Construction

Enbridge Pipeline, Canada-Line 10 and Line 11 Replacement

TANAP Pipeline –Proposal - Turkey

GASCO Pipeline Proposal – UAE

Enbridge – Alliance Projects –USA

Alan Sayler

P rofessional Resume

Alan’s direct support for the Fluor Upstream Pipeline Group should be considered as the

( Manager of Pipeline Construction) for Fluor with responsibilit ies to carry out the overall

execution of the pipeline construction for the reasons that Alan has several years

supporting the following;

Overseeing upstream pipeline projects from the very early stages from conceptual

t hrough construction over the last 32 years on several large key projects.

Supports and Understands Field Services and Construction Management of 3rd

Party Resources, Managing Inspection Staff and Vendor Quality Staff.

Experience in managing key prime pipeline construction contractors, and

subcontractors.

Owners Engineer/CM support roles for technical advice and contract scope of work.

Working with all Tasks of ROW, Land and Environmental Personnel during key

p hases during FEED, Detailed Engineering and Construction.

Working with Union and Non Union Labor environments

Energy Inspection Services “EIS” – Parker, Colorado

V ice President of Operations (2012)

Vice President of Operations for Energy Inspection Services providing direct management for

E IS while providing services to assist owners & operators remain compliant, safe and aligned

to continually changing regulations and market drivers in the Oil & Gas, Power Generation,

M ining & Municipal sectors.

By proactively seeking high-quality field services provided by competent, current,

and well managed professionals, those delivering heavy industry projects can reduce

r isk, improve safety, and increase their returns on investment by delivering a high-

quality, industry-standardized and compliant product.

Providing experience into the daily planning and operations of a (new startup

company EIS).

Alan Sayler

P rofessional Resume

Golder Associates Inc. – Walnut Creek, California

Senior Pipeline Construction Manager (2011)

Senior Pipeline Construction Manager and Senior Pipeline Field Engineer responsible for

domestic and international pipeline projects.

Extensive support in long distance and remote pipeline construction, project planning, route

surveys, pipeline estimating, tendering contractors, project management and QAQC inspection

management; projects included;

Bar rick Donlin Creek 350 M ile Gas Pipeline Route Validation –Anchorage Alaska,

Review pipeline route in remote areas.

PGE – Ukiah, Arcata and Eureka, California Pipeline Reroute Studies

Newmont – DOT 192 Gas Pipeline Inspection, Paradise Valley, Nevada

Doyon U tili ties Steam and Condensate Pipeline Inspection and Validation for

I nstallation Issues –Fairbanks and Anchorage Alaska

Supporting roles for 700 kilometer Desalinated Water Pipeline Project Mauri tania,

A frica.

Supporting roles for Pacific Gas and Electric Pipeline Projects in Northern

California.

Confidential pipeline study for a 600 mile pipeline for the Bakken Field t ransporting

c rude oil to the eastern refineries.

Chevron M ining Questa Mine Site – Pipeline Route and Paste Plant Study- Cost

Estimation and Construction Planning

Shell Oil Company Canada contribution for pipeline route selection and

constructability workshop for FEL1 phase for the planning of a conceptual large

d iameter gas pipeline in B.C Canada (Trans Canada).

Ausenco Pipeline Systems Inc. – Concord, California

Senior Pipeline Construction Manager (2005 to 2011)

Ausenco Pipeline Systems Inc. – Concord, California - Mining and Slurry Pipelines Experience

Alan Sayler

P rofessional Resume

Senior Pipeline Construction Manager (2005 to 2011)

Global, high-end provider of engineering and project management / solutions services for companies

within energy and resource sectors with specialties in environment and sustainability, minerals and

metals, and process infrastructure.

• Senior Pipeline Construction Manager Responsibilities included: field engineering, project

management, construction management and managing field engineering offices for world class large

scale pipeline projects up to $600M value on projects up to 6 billion USD.

• Guide and participated in project reviews related to design, construction, maintenance and

rehabilitation projects; such as:

• World Class high profile pipeline route surveys, evaluation of route options, estimation, and

construction planning, tender for projects, contractor negotiations, and construction management

disciplines.

• Projects included high pressure long distance slurry, water desalination, and tailings pipeline

projects ranging from 4" to 48" diameter pipelines, and station construction in USA, Canada, China,

South America, Africa, Pakistan, India, Madagascar and Papua New Guinea.

• Estimating for long distance gas and slurry pipelines up to 4 billion USD estimates for

construction costs.

• Execution Plans for very difficult high level remote projects for pipeline construction planning and

overall estimating of the project for mobilization of construction fronts and materials, pipeline camps

and pipe yards.

• Onshore Country Engineering Manager Madagascar for Basic and Detailed Engineering

Charged with directing field engineering office in designing and completing large international pipeline and

infrastructure projects valued up to $600M. Guide and participate in project reviews related to design and

construction issues and evaluate / estimate project specifications, challenges, and costs.

Selected Project Accomplishments

• SENIOR CONSTRUCTION ENGINEER, MCC / CPMM, Pilbara Region, Australia – Providing

detailed engineering design support for world class mining project, Iron Concentrate Pipeline largest

project of its kind in Australia. Pipelines consist of 30 kilometers each, 32-inch concentrate pipeline,

30-inch return water line, 48-inch desalination water pipeline, 40-inch tailings, and 30-inch diameter

tailings water return. All high pressure carbon steel pipelines, pump stations, terminals, and

thickeners for operating 27.5+ million ton iron ore operation annually.

• ESTIMATOR, Capex, Santiago, Chile – Accountable for estimating and revisions for Quebrada

Blanca High Pressure 36” Sea Water Pipeline and 6” concentrate pipelines located in central Chile

from 0 masl to Andes Mountains 4000 masl including choke stations and 6 pump stations. EL Pachon

High Pressure 6” Concentrate Pipeline located in central Chile from coastal elevation 0 masl to 4000

masl Andes Mountains including choke stations and 6 pump stations.

• INVESTIGATOR / ESTIMATOR, Tethyan Copper Company, Islamabad, Pakistan – Investigated

and optimized proposed 820 kilometer pipeline route to construct copper concentrate high pressure

A lan Sayler

P rofessional Resume

slurry pipeline. Examined and GPSed route for coordinates, elevations, and profile. Provided details

to surveyors and process engineers including terrain type details to estimate the construction costs

for bankable feasibility study phase. Meet with local Pakistani pipeline contractors to discuss

contractor labor and equipment details for Pakistani construction costs. Completed project in very

volatile / hostile environment.

• ESTIMATOR, JSPL Iron Ore Concentrate Pipeline, Barbil to Angul, India – Estimating project that

included review of desktop information for proposed 255 km pipeline route for client. Provided

construction feasibility analysis and recommendations for optimization of pipeline route.

• ESTIMATOR, Xiongcun Copper Tailings and Water Reclaim Pipeline, Tibet China – Charged with

project estimating, reviewing desktop information to provide constructability and cost estimating

recommendations for tailings and reclaim water pipeline.

• ESTIMATOR / PLANNER, Jindal Power and Steel Ltd. Blue Dust Iron Ore Slurry Concentrate

Pipeline Project, Barbil, India – Evaluated proposed 181 kilometer pipeline route and provided

recommendations for cost estimates, operational and maintenance costs, basic design, and

engineering criteria. Consulted on options for return water pipeline following same route and provided

field trip report with recommendations. Prepared information for cost estimating at basic engineering

phase.

• CONSTRUCTION MANAGER, Panzhihua Iron and Steel Group XIN Bai Ma Project, China -

• Oversaw contract Survey Company to perform preliminary centerline survey work for feasibility

and basic engineering studies. Investigated and provided centerline for 3 options to build iron ore

slurry pipeline including revised coordinates, trip report, construction plans, and cost estimate to

complete project.

• ENGINEER / ESTIMATOR / PLANNER, TATA Steel Limited Iron Ore Slurry Concentrate Pipeline

Project, Jamshedpur, India - Reviewed proposed survey details and longitudinal profile as well as

construction planning and operations. Provided recommendations for proposed pipeline and

construction details for construction estimating and planning.

• ENGINEERING MANAGER ONSHORE, Ambatovy Nickel Pipeline Project, Madagascar –

Directed detailed engineering for 220 kilometer 24-inch diameter slurry pipeline in Antananarivo,

Madagascar which included pump station and terminal receiving station based on hydraulic gradient.

Coordinated pipeline route engineering, pipe unloading facilities, river crossings, selection of station

sites, all field investigations, social activities for row acquisitions, and interfaces at pipeline inlet and

outlet for 195 kilometer 24-inch ore slurry pipeline. Oversaw pipeline route selection and

investigations for river installation of submersible pumps and pump station and terminal at mine site

for 25 kilometer water pipeline.

• CONSTRUCTION MANAGER, Baotou Steel, China – Provided training presentation to

approximately 120 Chinese national contractors for pipeline construction operations for Bao Tou iron

ore concentrate project, giving cost estimates and construction plans for construction of a 160

kilometer 36-inch water line and 18-inch iron ore slurry concentrate high pressure pipelines.

• ASSISTANT PROJECT MANAGER, Da Hong Shan Iron Ore Concentrate Slurry Pipeline, China

Guided construction of 170 kilometer 9-inch diameter heavy wall pipeline installation including

oversight of 4 contractors and 4 spreads and review of NDT specifications and welding procedures..

Evaluated river crossings, tunnel crossings, slope, and communications with client management.

Prepared audit reports for client for construction oversight of project.

Senior Pipeline Construction Manager Responsibilities included: field engineering,

p roject management, construction management and managing field engineering

A lan Sayler

P rofessional Resume

offices for world class large scale pipeline projects up to $600M value on projects up

to 6 billion USD.

Guide and participated in project reviews related to design, construction,

maintenance and rehabilitation projects; such as:

World Class high profile pipeline route surveys, evaluation of route options,

estimation, and construction planning, tender for projects, contractor negotiations,

and construction management disciplines.

Projects included high pressure long distance slur ry, water desalination, and tailings

p ipeline projects ranging from 4" to 48" diameter pipelines, and station construction

i n USA, Canada, China, South America, Africa, Pakistan, India, Madagascar and

Papua New Guinea.

Estimating for long distance gas and slur ry pipelines up to 4 billion USD estimates

for construction costs.

Execution Plans for very difficult high level remote projects for pipeline construction

p lanning and overall estimating of the project for mobilization of construction fronts

and materials, pipeline camps and pipe yards.

Onshore Country Engineering Manager Madagascar for Basic and Detailed

E ngineering

Principal Technical Services Chevron Refinery – Richmond, California

API 653/650 Tank Program Manager (2005 to 2005)

API 653 and 650 Tank Program Manager for Chevron Richmond Refinery with

responsibilities including: manage and support Chevrons Cryogenic Tank Program

for the Richmond Refinery;

Including planning, scheduling, project management and tendering for tank

rehabilitation projects;

Supervision of tank contractors for tank rehabilitation projects; and managed all

p re- and post-construction tasks for multiple projects.

A lan Sayler

P rofessional Resume

Working directly with Operations and Maintenance Units for Scheduling,

decommissioning and re-commissioning planning.

All HES and Operational Meetings and Hands on internal inspections and

coordination’s for tank inspections.

Cypress Creek Pipeline Maintenance Incorporated

(Currently Energy Maintenance Services) – Pearland, Texas

Superintendent of Construction/ Senior Field Engineer (2003 to 2005)

Superintendent of Construction and Rehabilitation Projects and Senior Field

E ngineer for planning, organizing and construction for Marathon Pipeline; US

Department Of Transportation regulated interstate pipelines inspection;

Responsible for DOT 195/192 hydrostatic testing and rehabili tation programs for

c rude oil, liquids and refined products pipelines.

Specialty work tasks included managing 50 man crew, intelligent pigging, planning,

design of temporary facilities, purchasing, nit rogen decommissioning, hydrostatic

testing, pipeline replacement, installation of mechanical weld on and bolt on sleeves,

clock springs, and corrosion analyses. Alan also facili tated daily reporting for D.O.T.

and managed personnel on a daily basis.

Projects were carried out in the Kentucky, Indiana, Ohio, Texas and Wyoming areas

for Marathon, and Exxon Pipeline Companies.

Marathon Ashland Petroleum –Pipelines and Refinery

Houston Texas; Wyoming; Indiana; St. Paul Park M innesota; Louisiana, Ohio; Africa

Senior Construction Manager (1997 to 2003) Workforce reduction

Senior Construction Coordinator and Construction Manager, for Onshore

Continental USA pipeline projects and Offshore West Africa Pipeline Projects.

A lan Sayler

P rofessional Resume

Responsibilities included executing pipeline construction projects for reroutes in city

l imits, pipeline replacements, product terminal and t rucking upgrades and

rehabilitation to include planning, project management, construction management,

i nspection and coordination of contractors and inspection teams.

Alan also managed API D.O.T. 195 documents and project files, tendering and

management of contractors working in the Rocky Mountain, M idwest and Eastern

Seaboard Regions, Catlettsburg Kentucky Refinery, Robinson Indiana Refinery and

other locations.

Senior Supervisor Marathon Ashland Refinery Blending and Terminal Maintenance

Supervisor to manage the API 653 Tank rehabili tation project and daily routine

maintenance of the blending unit operations and t rucking facility.

A moco Pipeline/Amoco World Wide Engineering

(Currently Bri tish Petroleum) – North Dakota, Colorado, Wyoming, Indiana, Montana,

Texas

P ipeline Operations and Maintenance Welder/Supervisor/ Chief Inspector/ Construction

M anager (1980 to 1997) Workforce reduction

Alan held many positions over his 17 year career with Amoco Pipeline -Amoco World

W ide Engineering and Construction starting out in maintenance and operations as a

p ipeline fabricator and welder, operator, and relief pipeline manager.

He was also responsible for pipeline inspection and engineering support services

managing pipeline construction projects through the continental USA and offshore.

A lan worked on several key pipeline project for Amoco Pipeline:

F rontier Pipeline 300 miles- 16"crude oil pipeline, Anschutz Dual 12" pipelines, Big

Horn Pipeline Expansion and Powder River Pipeline, and K N Energy and Bear

Tooth Pipeline all in Wyoming.

Other projects included Rehabilitation and Rerouting projects; such as, the rerouting

of Amoco pipeline assets and Wyco Pipeline for the new construction of the Denver

A lan Sayler

P rofessional Resume

International Ai rport and Highway modification projects in the Denver and Colorado

Springs area.

Chief Inspector and Construction Coordinator of the Rocky Mountains and a leader

of the Amoco Pipeline Construction and Inspection Team based out of Mer rillville

I ndiana. While upgrading all their major pipeline assets, Alan was responsible for:

i ntelligent pigging, hydrostatic testing, line replacement, installation of weld on

sleeves and clock springs.

West Shore Pipeline Products Systems in Green Bay Wisconsin and Chicago

Operating Areas, tank farm rehabili tation and products pipeline rehabilitations.

Many other projects within Amoco’s pipeline system in Texas, New Mexico, Colonial

P ipeline East Seaboard Products Terminals and Pipelines Systems.

T RA I N I NG

D.O.T Compliance Training

CFR Part 195 Subpart G "Qualification of Pipeline Personnel”, 2003

D.O.T Compliance Training

CFR Part 192 Subpart N "Qualification of Pipeline Personnel", 2003

OSHA and Employer Supported, 1980, 1985, 1990, 2005, 2011, and 2012

Australia Code of Conduct

Australia White Card for Site Specific Training, 2010

SafeLand Training 2012

Accountable Tasks

Vice President

Operations and Field Manager

Maintenance Supervisor –Union and Non Union Labor

Alan Sayler

P rofessional Resume

Welder and Fabricator – Operator - Mechanic

Project and Construction Management

Senior Construction Manager

Planner and Scheduler

Long Distance Pipeline Estimator – Construction Operations/Progress Rates -

Methodology

Field Engineer -Investigations, Planning, Estimating, and Management of Pipeline

P rojects

Professional Pipeline Routing Engineer

Geotechnical Engineer - Site Inspections Pipeline Routes

ROW and Land Owner Support Special Projects

Chief Inspector

NACE I I Inspector

NACE Coatings Inspector

Tank Inspector for API 653 and API 650 Tank Construction

Welding Inspection

AWS - API Certified Welding Inspector

Refinery Superintendent –Blending, Products, Asphalt, Propane, Butane

Waste Water Treatment Supervisor Maintenance

Welding Inst ructor

P rofessional and Personal Work Skills / Experiences

Mid-Stream and Oil Field Gathering Systems

Gathering, Flow, Distribution Line and Tank Batteries

Alan Sayler

P rofessional Resume

Pump and LACT Units

Treaters, Vessels, Compressors, Pump Stations and Piping

Fabrication

Drill Pad Site Construction

Welding Procedure Qualifications

Welder Qualifications

Welder Training

Project Weld Assessment Issues

Certified AWS Welding Inspector

API 1104/1107 Certified Welder and Inst ructor

ROW Inspection and Maintenance

ROW Surveillance and Reporting

ROW Maintenance Monitoring

ROW Rehabilitation and Restoration

Oversight of Subcontractors Maintenance and Repairs

3rd Party Encroachment and Crossings Inspections

Non Destructive Testing

Level I I Radiography In terpretation

X-Ray, Gamma Ray- Automatic Ul t rasonic Testing

Magnetic Particle Inspection

Alan Sayler

P rofessional Resume

Most NDT Procedures

Oversee of NDT Qualifications and Technicians

Construction Planning and Estimating

Field T rip Reports

Trade off Study and Recommendations

Estimate Pipelines ( Estimating Standard) Provided

Estimate Facilities

Provide Construction Execution Plans Supporting Cost

Provide Constructability Support

Construction Planning

Contractor Understanding – Selection-Pre-Qualifications and Tender Support

Pipelines Long Distance

Natural Gas, NGL, LPG, Oil, CO2, Water, Slur ry, Tailings

API- ASME - DOT - 195 - 192 - Domestic & In ternational Codes and Standards

Pump Stations

Compressor Stations

Diameter’s -2" through 48"

Welded - Carbon Steel X42 - X80

HDPE

Mul tiple Pipelines

In ternal Lined Pipelines

Alan Sayler

P rofessional Resume

In ternal Coated Pipelines

Insulated Pipelines

Automatic and Manual Welding

3 Layer P.E., FBE, Concrete, Coatings

Field Joint Coatings -Liquid Urethane, Sleeves, FBE

Pipeline Rehabilitation Projects

In ternal Smart Pigging Inspection Support

Line Locates & Marking

Location and Excavation Rehabili tation Digs

Site Evaluation of Pipeline Defects and Corrosion

Documentation

Clock Springs

Weld On Repair Sleeves

Mechanical and Pipe Replacements

River Crossing Assessments and Replacements

Ni t rogen and Decommissioning Pigging

Hydro Static Testing

Crude / Products Downstream Infrastructure

Loading Rack Upgrades, Hydrostatic Testing, Fabrication

Port/Loading Offshore Docks Rehabilitation

Products Terminals

Alan Sayler

P rofessional Resume

Trucking Terminals

Tank Farms

Power Plant, Refinery Support and Turnarounds

Mechanical Piping

Concrete –Rebar

Pumps, Vessels, Tanks, Refractory, Foundations, Structural Steel

Sphere and Bullet Restoration

Blending Unit Upgrades Piping and Tanks

Other Upgrades and New Modification

Tank and Vessels Rehabilitation and Cleaning

General Blending Unit Maintenance

Waste Water Treatment Plant Maintenance

Off-Shore Inspection

Lay Vessel Qualification

Side Scan Bottom Survey and Route Selection

Qualification of Welders and Procedures

Inspection of Pipe Installation

Weld Repair Procedures (Outside of Tensioner)

Diver and ROV Monitoring

Underwater Hot Tap and Connection Monitoring

Sand Blasting and Coating of Pilings and Equipment

Alan Sayler

P rofessional Resume

Operations and Maintenance Support

Field Engineering

Risk Assessments on Facilities

Pipeline, Facilities and Tank Inspections

Contractor Scopes and Monitoring

General Pipeline Maintenance- Pigging- Pump and Mechanical Support

In ternal Intelligent Pigging - Excavation and Repairs

Desktop Study Assessments - Pipeline Route Investigations

Corridor Selection

Major Point Crossings

Topographical Characteristics

Hydraulic Profile Routing Assessment

Constructabili ty Assessment

Centerline Selection

Facility and Utili ty Requirements

Access Roads Investigations

Marshaling and Laydown Yards

Pipe Yard Locations Selection

Camp Locations Selection

Survey - Corridor and Centerline

Geotechnical -Hydrological Locations

Alan Sayler

P rofessional Resume

Environmental Field Support

Land Acquisitions

Land Ownership Research

Land Owner Negotiations

ROW Permitting

Environmental Investigations and EIA Development

Project Site Implementation

Travel Logistics

Project and Field Office Set up

Vehicles and Equipment

Local Staffing and Training

Long Term / Short Term Accommodations

Onshore Management of Project

Subcontractor Management

SKILLS

Very knowledgeable of pipelines, refineries, pumping and process equipment, f luid

p rocess operational requirements and characteristics, installation practices and

other supporting roles.

Experienced estimator for construction pricing, scheduling and execution process.

Knowledgeable of engineering scheduling and execution process.

Accomplished with communications and interface with suppliers and subcontractors,

i ncluding multi-cultural knowledge and sensitivity, worked several major projects

w ith nationals and others from different foreign cultures.

Alan Sayler

P rofessional Resume

Experienced problem solving and analytical thinking abilities; expert at

t roubleshooting

Effective interpersonal and communications skills, particularly the ability to

communicate technical expertise and lead multi-discipline teams.

Senior Level Management and Supervision Operations and Maintenance, Refinery,

Power Plant, Terminals and Pumping Stations.

Experienced Construction Manager with many positions for clients as Owners

E ngineer, or construction manager overseeing and subcontract management of the

subcontract for main centerline equipment; from preparation works through full

i nstallation including erection tests and through pre-commissioning stage and

activities.

Experienced in providing oversight and coordination for operations and

maintenance and tu rn around teams, for cost and schedule driven projects

Execute and guide overall construction plans and installation after participating in

t he logistics and planning commit tees to support the overall process for major

equipment and installations for multiple projects.

Experience in logistics and procurement support for liaison and oversight

contributions to the overall team and project while overseeing the procurement and

documentation process by others, including subcontractors and internal resources.

Experienced in inspection and test plans including the process for development,

review, analyze and approve construction methodology procedures for major

construction installation projects.

Conduct QAQC audits; manage inspectors and QAQC management teams carrying

out the test plans and acceptance rejection process for a final as-built and project

documentation process.

Works well with foreign nationals, expats, and others in several different regions of

Asia Pacific, M iddle East, Africa, other.

Have experience with t ranslators and project support personnel.

Alan Sayler

P rofessional Resume

PROFESSIONAL AFF I L IAT IONS

API - AWS – NACE - NRA

Engineering Experience on multi levels for supporting Professional Engineers

KEY PROJECTS AND EXPER I E NCE

P I PE L I N ES, FAC I L I T I ES AND H EAVY I N D USTRY

P rofessional I nspection D isciplines I nclude;

API 650 & 653 Inspections and Certifications

API 1104 & 1107 Welding and Certifications

NACE Coating Certifications

ASME Welding and Inspection

AWS Welding CWI Certifications

OSHA Competent and Operator Qualified Personnel

Fabrication and Piping including P& ID

Experience in Pipeline Operations, Maintenance and Construction Supervision and

I nspection; Construction Management

Combined Experience and Expert Personnel in Oil, Gas, Products, Slur ry, Water,

Refining, Waste Water and M ining Projects;

Offshore, Onshore, Domestic and In ternational Experience and Methodologies in

E ngineering, Construction Inspection Field Services;

EPC/M experienced;

Estimating, Construction Planning and Logistical Executions; Pipelines,

Contractors, Man Camps and Layouts;

Refinery and Power Plant Inspections and Turnaround support API-650-653-510-

570, and general operations and maintenance support;

Alan Sayler

P rofessional Resume

Code and shop inspections; vessels, equipment, materials;

Pipe Mill Audits and Pipe Manufacturing Inspections.

D omestic Crude Oil and Refined P roducts Pipeline P rojects

M arathon Ashland Pipeline

Project Engineering Support and Construction Manager, Coordinator/Chief

I nspector for several pipeline construction and rehabili tation projects onshore and

offshore;

Key Projects Included;

North Dakota Pipeline Gathering Systems, Newtown, Killdeer, Tioga, Portal,

M andan, Grassy But te, Four Eyes, L i t t le Knife, Dunn Center, Tioga, Fort Berthold

and Dunn Center oil and gas gathering construction, inspection and maintenance

operations. Including 150 miles of 12 and 16” mainline t runk line crude oil pipeline

and pump stations maintenance and operations winter and summer;

Big Horn Basin and Red But te Pipelines Rehabili tation Projects;

Gulf Coast Mainline Products Pipeline Rehabili tations;

West Texas (Iran Texas) Pipeline Gathering Upgrades and Internal Lining Projects;

Ft. Laramie Wyoming to Wood River I l linois Mainline Crude Pipeline Rehabilitation;

Express Pipeline Maintenance Upgrades and Station Facilities;

Ohio, Kentucky sections of Crude Oil and Products Pipeline Rehabilitation and Tank

Terminal;

Upgrades for the Cardinal Pipeline System, requiring construction coordination and

i nspection of several pipeline crews and inspectors to oversee the construction of new

facilities and rehabilitation of pipeline terminals, tanks, pumps, piping, concrete and

hydrostatic testing of long mainline sections;

Ni t rogen Purging/ decommissioning of long distance pipelines for Marathon, Wyco,

West Shore, Amoco, Red But te, and Big Horn Pipelines requiring long hours to

safely nit rogen purge, hydrostatic test, cut out and repair sections, and re-

Alan Sayler

P rofessional Resume

commission pipelines. Difficult situations and long hours managing pipeline

contractors, nit rogen vendors, pigging and t racking devices and leak detection

equipment and vendors;

C rude, P roducts, Gas, Terminals, Refineries and Operations

A moco Worldwide Engineering and Construction

Project Engineering Support and Construction Manager, Coordinator/Chief

I nspector for several pipeline construction and rehabili tation projects onshore and

offshore.

Continental USA: Texas, Montana, North Dakota, Louisiana, Colorado, West

V irginia, M ississippi, Nebraska, Oklahoma, I ll inois, Wisconsin, Other, USA

Key Projects Included;

P ipelines, Terminals, Refineries - Chief Inspector, Construction Coordinator, Welding Inspector for

major pipeline construction projects and rehabilitation for oil, gas, liquid refined products including:

Tioga –Mandan - 12” Mainline Replacement M issouri River – North Dakota

Frontier Pipeline - 300 miles 16" – Wyoming-Utah

Anschutz Dual - 25 mile 12" Pipelines – Wyoming

West Branch LNG - 40 mile 4" Pipeline –Michigan

Dagger Draw Pipeline -15 M iles 8” Pipeline- New Mexico

Big Horn Pipeline Expansion Project – Wyoming

Bear Tooth Pipeline - 100 miles 12" Pipeline

KN Energy Pipeline 80 miles -16” Pipeline

West Shore Products Pipelines Rehabili tation - Green bay, Wisconsin and Chicago,

I l linois

Crude Oil Pipelines Rehabilitation and Reroutes –Wyoming-Texas- Colorado –

Nebraska – Kansas – Louisiana –North and South Dakota, Oklahoma

A lan Sayler

P rofessional Resume

Wyco Products Pipeline Reroutes and Rehabilitation projects Colorado, Wyoming,

South Dakota

Terminal Rehabili tation West Virginia, Indiana, Texas and Florida

N atural Gas Pipelines

P acific Gas and Elect ric (PG &E)

Key Projects Included;

Reroute of pipelines in landslide areas in Northern California Ukiah and Arcata,

i ncluded field engineering, cost estimating, construction coordination and planning.

Rehabili tation and Reroute of gas pipelines, estimating, and construction planning

for Union City California area near Fremont 6 and 8” pipelines.

Arcata California Tsunami coast line pre-feasibility study for PG&E gas pipeline

reroute away from Tsunami areas. Provide route options, cost estimates and

construction planning.

Redwood Valley Community College Redwood Valley California –Reroute of natural

gas pipelines near or under college campus study. Provide route options, cost

estimates and construction planning.

N ewmont M ining

Key Projects Included;

D.O.T. 192 Inspection of 4” natural gas pipeline for the Nevada State Public U tilit ies

Commission, included hydro-vacuum excavations, NDT inspections for existing

p ipeline and hot taps to the Bull Head Ranch distribution line.

Bar rick and Nova Gold; Donlin Gold Natural Gas Pipeline Project – 300 mile gas

p ipeline project Anchorage Alaska, provide pipeline route assistance for permit t ing

p rogram, included permafrost, geo-hazard regions and geotechnical textbook

features.

A lan Sayler

P rofessional Resume

Bar rick Gold –Nevada –Gas Pipeline detailed estimating for natural gas pipeline

expansion into Bar rick Gold facilities in Nevada.

C ryogenic Tanks Construction and Rehabilitation AP I 650 and 653 Tank P rojects

I llinois, Wyoming, Missouri, Colorado, California USA

Key Projects Included;

Amoco Whiting South Products Terminal; Planning, field engineering, civil and

mechanical inspection and construction oversight for new refined products terminal.

Construction Manager for the construction of civil and mechanical scope for 5 new

d rain dry API 650 80,000 barrel storage tanks and interface tanks including all the

associated tank and terminal piping and metering facilities.

Wyco Pipeline Dupont Colorado – Two- new products storage tanks, 100,000 barrel

and 40,000 barrel tanks

Amoco Pipeline Thermopolis Wyoming – One-20,000 barrel crude oil storage tank

construction management and inspection.

Chevron Refinery Richmond California; API 653 Tank Annual Program

management for Tank Rehabilitation

Projects and associated vessel and piping upgrades 75 tanks scheduled for cleaning,

i nspection and rehabilitation.

Amoco Pipeline LaPlata to M ilan M issouri Products Pipeline and Tank Farm ; 4-

80,000 barrel products pipeline tanks, including civil construction of tank farm

layout, and civil concrete installation of tank foundations and installation of facilities

for the pipelines to the tanks and manifolds from incoming pipeline station piping.

La Plata to M ilan Products Pipeline -Inspection and Supervision for a new 50 mile,

12 inch petroleum products pipeline from LaPlata to M ilan, M issouri. The project

i ncluded route selection, logistical planning, contractor coordination, inspection

d uring pipeline construction.

A lan Sayler

P rofessional Resume

I N T ER NAT IO NAL P I P E L I N ES & FAC I L I T I ES

Major Long Distance High Pressure Pipeline Projects –

Mining Industry; including route surveys, route selection, field engineering, construction

p lanning cost estimating and construction management.

Key Projects Included;

Madagascar, China, Pakistan, India, Canada, Papua New Guinea, Chile, Australia, Africa, Mongolia

Sherri t International, Ambatovy Pipeline Project- 225 km - 24" Nickel Laterite

P ipeline – Madagascar; Engineering and Construction, Construction Management

and Inspection Supervision

Da Hong Shan Pipeline Project - 170 km – 9” I ron Ore Pipeline - Yunnan Province

China, Engineering, Route Selection and Construction Management and Inspection

Supervision

Reko Diq Pipeline Project - 850 km – 8” Copper/Gold Pipeline Pakistan and

Baluchistan. Route Selection Site Optimization –Engineering and Cost Estimation

and Construction Planning

ESSAR Steel - 150 km – 12” - I ron Ore Pipeline – India - Route Selection and Field

Site Optimization, Field Engineering, Cost Estimation and Construction Planning

China Steel - 2,000 km – 36”- 48” - Coal Pipeline Study - Mongolia to South China –

Desktop level study and routing selections

CP M I N ING - 30 km - 48"- 30" and 32" pipelines - Western Australia – Route

Selection, Field Engineering, Construction and Owners Engineer Representative

OK TEDI M ining Company - 130 km 10” - Pyrite Tailings H igh Sulphur Pipeline -

Papua New Guinea, Owners Engineer and Construction Manager for replacement of

130 km pipeline

Selwyn Resources - 125 km Zinc Pipeline -Yukon Terri tory Canada, Route Selection

and Field Site Optimization, Field Engineering, Cost Estimation and Construction

P lanning

A lan Sayler

P rofessional Resume

Jindal Steel - 600 km – Pipeline study Zimbabwe and Mozambique Desktop study for

route selection and cost estimation

BG Group- 1,500 km - 48” Confidential Natural Gas Pipeline Study – B.C. Canada-

Route Selection and Field Site Optimization, Field Engineering, Cost Estimation

and Construction Planning

Pebble Partnership - 80 miles – 6” to 12” Pebble Project Alaska -Four Pipelines

Natural Gas, Water, Slur ry - Route Selection and Field Site Optimization, Field

E ngineering, Cost Estimation and Construction Planning

O FFS HORE P I P E L I N ES

H igh Island Pipeline System (H I PS)

Gulf of Mexico, USA

Underwater hot tap connection installations in the Gulf of Mexico.

Supervisor for engineering and construction for installation of several hot taps in

shallow water 300-800 feet, managed ROV crews and divers to ensure safety and

quality of underwater installations resourced with diving bell, hydro jetting,

mechanical hot tapping sleeves, NDT oversight of sleeve installation and valve

i nstallations and hydrostatic testing of the installed hot tap equipment and valves.

Tchamba South Pipeline P roject - Gabon, West Africa

Offshore pipeline installation on pipeline lay - barge operated by McDermott In ternational. Provided

t he Engineering Oversight, Construction Management and Inspection for the overall supervision and

i nstallation of the pipeline subsea installation package, to oversee the construction contractors for the

i nspection, project management and documentation of the project, as the owner’s representative.

25 mile offshore pipeline off the east coast of Gabon for Marathon Oil Company

Included the inspection and audit of the pipeline lay vessel for safety and

acceptability to carry out the performance of the project to lay 25 miles of heavy wall

12” mainline pipe coated with Fusion Bond Epoxy Coating.

Single sourced tensioner lay vessel with automatic welding and semi-automatic

welding by Serima Dasa

A lan Sayler

P rofessional Resume

Welding inspections and repair outside of tensioner procedures

Fusion Bond Epoxy Field Joint Coating and joint insulation

Dive Inspections (Divers and ROV’s)

Installation of new pilings onside of the production platform for the installation of

t he pipeline r iser.

Side Scan As-built Survey and Hydrostatic Testing after installation.

R EF I N E R I ES

A moco Texas City Refine ry

Upgrade of incoming pipeline to accommodate the installation of new tank farm and

refinery facilities, Chief Inspector for the upgrade and installation of above ground

p iping into the refinery property.

M a rathon Ashland Refinery Saint Paul Park M i nnesota

Blending Unit Supervisor and Manager for the blending unit and Cottage Grove

Tank Farm, and Refinery

Products and Asphalt Terminal, Waste Water Treatment and Missouri River Port

Loading Facilities.

API 653 Tank Rehabili tation

API 650 Tank Construction

Heat Exchanger Inspections and replacements

Turn Around Supervisor

All Union Crafts

M a rathon Ashland Catlettsburg Kentucky Refinery

Pipeline Hydrostatic Testing of incoming Marathon Pipeline mainline products

p ipeline. Pipeline Construction Manager.