Objective
Seeking a Challenging position that allows me to perfect my skills in the
automation field. I want to work with a progressive organization where I
can utilize my knowledge and skills for the mutual benefit of the
organization and myself.
[pic]
Summary of Skills
> Working in Process Automation and Instrumentation arena as an
Application Engineer - Design Engineering & Site Commissioning activity
for 5+ years in DCS & SIS for Oil and Gas/ Petrochemical Industry.
> Involved in Installation, Application Development, Engineering and
commissioning of Invensys Foxboro DCS System and ABB 800xA System
> Worked in Onshore & Offshore Platform.
> Worked in Green Field & Brown Field project.
> Worked in Tie in & Tie-Out activity - i.e., Made Online Modification in
Existing Oil & Gas Plant (QG Gas Plant, Qatar @ Invensys).
> Done a Site Survey for an Expansion Project. (QG Gas Plant, Qatar @
Invensys).
> Involved in Front End engineering design FEED
> Technical discussions with client and consultant regarding requirement,
Analysis, design, development, testing and implementation.
> Conceptualize project execution plans in line with client's requirement.
> Establishment of time frame & schedules of project as per client Specs.
> Involved in Cabinet Designing - System Cabinet, Marshalling Cabinets,
Interposing Relay Panel Cabinet, Fiber Optic Cabinet, Patch Panel
Cabinet and Power Distribution Cabinet.
> Involved in Hardware Installation, Panel Visual Inspection and Panel
Erection.
> Involved in System Administration Activity - Domain Controller
Installation, Upgradation, access Rights & Privileges (Sadara Project @
ABB)
> Done System Planner, Committal Configuration, System Set-up and Power Up
the System.
> Developed DCS and SIS Logic generation/Application Development as per IO
List/PCSD and Complex Loops development as per Control Narrative, Plant
and the customer needs.
> Worked in Invensys/ABB Software - Infusion Engineering Enterprise (IEE),
I/A Intelligent Automation control configuration (IACC) & Integrated
Control Configuration (ICC) - FoxCAE and ABB Software 800xA System -
Control Builder M and Engineering Workplace/Engineering Studio.
> Done Programming/Script writing for Logical Block configuration - HLBL
Sequence Programming, Calca Programming, Structure Texts, SFC, and FBD
Programming & Visual Basic Scripting Language in DCS systems according
to the P&IDs, Control Narrative as well as Plant requirement and
customer needs.
> Worked in Serial Communication (Third Party System Integration) in DCS
for the following devices - ABB (VFDs, Motors, & FGS), GE (Machine
Monitoring System), Schneider (MV Motors & Elics Pkg), Rotark Pakscan
MOV, Emerson Wireless HART, Daniel System Floboss Metering System,
Siemens DG/GTG Transformer, Triconex, HIPPS, BMS System, L&T RTU, AB,
Kalki Protocol Converter and so on.
> Expertise in commissioning of HART Devices, Profibus & Foundation Field
bus devices. Handled Various Foundation Fieldbus Devices like Emerson,
Foxboro, ABB, E&H, P&F, Samson, Magnetrol, MTL FF diagnostic modules &
Fisher Devices. and so on
> Done Switch Configuration, GPS Time Synchronisation, Router
Configuration and Network Address Translation Configuration.
> Graphics building as per P&ID, PFD's, C&E, F&G & Package diagrams, and
Building Symbols / Overlay and Static/Dynamic linking configuration
through FoxDraw & Graphics Builder.
> Worked in Historian Configuration through Aim*AT, 800xA History &
Information Manager.
> Partially involved in Alarm Management, Asset Optimization
interface
(Pactware - HART Devices), Engineering Site-Support &
Maintenance Activities.
> Involved in Backbone Router Configuration.
> Have Knowledge in Hardware and Software of Triconex Module -
Safety System.
> Worked in Documentation - Preparation of Functional Design Specification
FDS, Project Application Specification PAS, Instrument Loop Diagram,
Power Consumption & Heat Dissipation, Controller Loading, Wiring and IO
Assignment List, Cabinet Layout Drawing, System interconnection, Network
Architecture, FAT & SAT Procedure and its Reports & handed over all
Records in Time.
> Involved in FEED, Kick off Meeting & Minutes of Meeting with the
customers and the EPC's
> Involved in Factory Acceptance Test, Site Commissioning, Pre-
Commissioning, Plant Start-up
and Shutdown Activity.
> Involved in the IFAT, Pre-FAT, FAT (Factory Acceptance Test),
SIT (Site Inspection Test)
& SAT (Site Acceptance Test).
Professional Experience Summary
> ABB Global Industries & service Limited, Bangalore FEB
2012 - Till Date ( 1 Years )
> Invensys Process System, Chennai. AUG 2008
- JAN 2012 (3 Years )
Projects Involved In
ABB GISL:-
> SADARA RTIP - Petrochemical
Aug 2012 - Till Date
> Stublach Project July
2012
> Kauther Depletion Comp Project, (SIT/SAT @ Oman)
May 2012 - Jun 2012
Invensys:-
> QATAR GAS Project, (FAT @ Singapore, SIT/SAT @ Qatar)
Jan 2011 - Jan 2012
> SHELL GTL Project, (SIT/SAT @ Qatar)
Mar 2011 - Dec 2011
> AGIP Kazakhstan Project, (FAT @ India)
Jan 2011 - Mar 2011
> KGD6 Project, (SIT/SAT @ India)
Dec 2008 - Jan 2011
Project # 7:-
Sadara RTIP - Petrochemical Project, Saudi - Aug 2012 to Till Date
END USER/EPC Saudi/DOW
LOCATION FAT @ Norway, US & Site Commissioning (SIT, SAT) @ Saudi in
progress
Roles Design & Site Engineer
Responsibility DCS/SIS Application Development, System Administration,
System Installation, TPPS - Modbus/OPC, FF, HART, MOM, MOC,
Reports, Historian, Asset Optimization, Internal Testing,
AIR, FAT, Site Commissioning (SIT & SAT).
Nature of Work:-
Application Development:-
> Involved in Application Development for BPCS,SIS and Serial IO's
> Done Application Development for the following packages in MFC
utilities in Sadara - Boiler Feed Water Unit, UTIL, Eye washer and
Safety Showers, Fuel Gas System, Sump Pad Water Slop Oil, ELECT-1/2
and So on.
> Worked in FE Tool (Forward Engineering) & ACVT Tool (Automatic Code
Validation Testing)
> Worked with the following Library - PC Device Library for BPCS, Reuse
Library for SIS, Device library Wizard for FF, Modbus Library for
Serial tags & SEED Package.
> Worked in Control Modules, Function blocks, CMD Editor, Structure text
& Sequential Flow chart in Application Development.
> Involved in Grouping File Preparation & SDS Preparation. Also Involved
in Quality check for the PCSD's.
> Involved in Foundation Fieldbus Configuration
> Involved in Modbus Testing,
> Involved in OPC -Soft IO Configuration.
> Involved in Backbone Router Configuration.
FAT/Application Internal Review/ Internal Testing:-
> Done Internal testing and Application Internal Review for Quench
Package in MFC
> Done internal testing and Application Internal review for Utility
package - D0820, D0821, Steam package and So On.
> Involved in Internal FAT & FAT
System Administration:-
> Prepared Sadara System Software Build Document.
> Done Installation & upgrades(Feature packs & library) of 800xA 5.1
System for various IPCS Packages (IPCS01/16/05/06/)
> Doing System Administration Activity - E cloud Computing.
> Installation/ Upgradation of 800xA System 5.1 (Feature packs/Rev),
Soft Controller & SCM Manager, PCDL, Reuse Library, and SEED Package.
> Periodic Maintenance activity like Maintenance backup NAS, Reports,
and Batch files Upgradation & Antivirus McAfee Upgradation.
> Setting up Group policy management, Creation of New user and Assigning
User rights/ Administrative privilege rights.
> Perform E144 System Health check-up activity.
Special Applications:-
> Involved in Modbus Configuration and TOP Server Configuration
> Involved in OPC -Soft IO Configuration by Generic OPC Control Network.
> Involved in Foundation Fieldbus Configuration
> Involved in Asset optimization Configuration - FF & HART
> Involved in CLAM for Loop Tuning and Performance Monitoring.
> Involved in Historian Configuration by 800xA History. Involved in Pin
Data gateway Collector & Pin Data Gateway Server Configuration.
> Involved in Generating Reports
> Involved in MOM & MOC activities.
Project # 6:-
Stublach Project - July 2012
END USER/EPC UK
LOCATION Site Commissioning (SIT, SAT) @ UK
Roles Site Engineer - Historian Configuration (Information manager)
Responsibility Special Application - Information Manager Installation &
Configuration
Nature of Work:-
> System Analysis of Information Manager - Historian Product,
verification and calculation of Log Creation.
> Installation & Configuration of History Database.
> Log template creation and configuration of History tags.
> Creation of Numeric Logs, Message Logs and Configuration of Scheduled
Archiving.
> Trend, Alarm and Event List Configuration
Project # 5:-
Kauther Depletion Compressor Project, Oman (Oil & Gas) (2 Months (May 2012
to Jun 2012)
END USER/EPC KDC Oman/Petrofac
LOCATION Site Commissioning (SIT, SAT) @ Oman
Roles Design & Site Engineer
Responsibility Detailed Engineering, Project Implementation and Site
Commissioning (SIT & SAT).
Nature of Work:-
> Involved in Detailed Engineering and commissioning activities of DCS
control system
> Established Modbus Communication with ABB 800xA System and Siemens
LV/HV Switchgears/DG.
> Done Serial Communication Database Logic for Diesel Generator package
in FBD/ST.
> Involved in Integration of different stations through (Router
Configuration) Network Address Translator and Redundant Network
Routing Protocol (RNRP) for merging plants - Kauther Depletion
Compressor Project, Siah and Yibal station.
> Done Creation and Modification of Graphics.
> Done Operator Workplace Configuration.
> Involved in Loop checks and Plant Start-up support
activities.
> Involved in Site Commissioning Activity.
Project # 4:-
QATAR GAS PROJECT, Qatar (Oil & Gas) (1Year 2Months (Jan 2011 to Jan 2012)
END USER/EPC QATAR GAS/TCJV France
LOCATION FAT @ Singapore/Site Commissioning (SIT, SAT) @ Qatar
Roles DCS Application Engineer
Responsibility Detailed Engineering, Project Implementation, IFAT & FAT,
Installation and Site
Commissioning (SIT & SAT).
Nature of Work:-
> Involved in Installation, Application Development, Detailed Engineering
and commissioning activities of DCS control system
> Worked in Green Field(ITR11) and Brown Field
Activity(ITR01,02,03,04,05,06,07,08,09,10).
> Worked in Tie-In/Tie-Out activity - Made Online Modification
in the Existing Oil & Gas Plant.
> Done a Site Survey for an Expansion Project
(ITR01,02,03,04,05,06,07,08,09,10).
> Developed Green Field typical as per Control Narrative and
Customer and EPC needs.
> Done a System Setup, Committal Configuration, Switch
Configuration, and GPS Time Synchronization.
> Involved in Hardware Installation, Panel Visual Inspection and Panel
Erection.
> Worked in Installation of Cabinets - System Cabinet, Marshalling
Cabinets, Interposing Relay Panel Cabinet, Fiber Optic Cabinet and Power
Distribution Cabinet.
> Template, Tag list Creation & Database Configuration in I/A
Intelligent Automation & Control
Configuration (IACC) & Infusion Engineering Enterprise (IEE).
> Logic Implemented as per control narrative, P&IDs, Plant
Requirement and Customer Needs. Worked
With HLBL/Sequence/Calca programming & VB scripts.
> Graphics Building - Building Symbol, Overlay & HMI Design
Configuration as per P&ID, Plant
Requirement & Customer needs.
> Worked in Third Party System Integration/Field Device System
Integration
- Serial Communication for Various PLS's.
. Third Party system like ABB FGS System, Yogokowa IPS System
& Triconex PSS System
. Done Internal FAT Engineering at Vendor Office's - ABB @
UK, Malaysia & Schneider @ Indonesia.
ABB - UK Qatar Gas Project - ITR-01/02/03 FGS System
Schneider - Indonesia Qatar Gas Project - ITR-11 MV Motors
ABB - Malaysia Qatar Gas Project - ITR-11 LV Motors
> Worked in Commissioning of HART Transmitter.
> Worked in Historian, Annunciator, Alarm Configuration &
Engineering Site
Support Activities.
> Involved in Loop checks, Functional Checks, Logic Checks and
Plant Start-up support activities.
> Worked in Documentation - Preparation of Project Application
Specification
PAS, Instrument Loop Diagram, Power Consumption & Heat
Dissipation, Controller Loading,
Wiring and IO Assignment List, Cabinet Layout Drawing, System
interconnection, Network Architecture,
FAT & SAT Procedure and its Reports & handed over all Records
in Time.
> Involved in Loop checks, Functional Checks, Logic Checks and
Plant Start up support activities.
> Resolving technical issues raised by the EPC and end user.
> Successfully Commissioned the Tie-in Scope activities @ Qatar
Gas Project, Qatar.
> Successfully completed the Site Inspection Testing SIT and
Site Acceptance Testing SAT.
Project # 3:-
SHELL GTL PROJECT, Qatar (Oil & Gas) (10 Months (Mar 2010 to Dec 2010)
END USER/EPC SHELL GTL/CB&I
LOCATION FAT @ Singapore/Site Commissioning (SIT, SAT) @ Qatar
Roles DCS Application Engineer
Responsibility Installation, Project Implementation, Start-up and Site
Commissioning (SIT &
SAT).
Nature of Work:-
> Involved in Installation, Application Development, Detailed Engineering
and commissioning activities of DCS control system
> Worked in New plant and Existing Oil & Gas Plant.
> Worked in Tie-In/Tie-Out activity - Made Online Modification
in the Existing Oil & Gas Plant.
> Involved in Hardware Installation, Panel Visual Inspection and
Panel Erection.
> Worked in Installation of Cabinets - System Cabinet,
Marshalling Cabinets, Interposing Relay Panel Cabinet, Fiber
Optic Cabinet and Power Distribution Cabinet.
> Template, Taglist Creation & Database Configuration in I/A
Intelligent Automation & Control
Configuration (IACC).
> Logic Implemented as per control narrative, P&IDs, Plant
Requirement and Customer Needs. Worked
With HLBL/Sequence programming, VB scripting and Calca
Programming.
> Graphics Building - Building Symbol, Overlay & HMI Design
Configuration as per P&ID, Plant
Requirement & Customer needs.
> Worked in Third Party System Integration/Field Device System
Integration - Serial Communication
For Various PLS's.
. Third Party system like Honeywell Enraf Transmitters, GE
Bently Nevada
(MMS System) & Triconex.
> Worked in Commissioning of HART Transmitter.
> Worked in Historian, Annunciator, Alarm Configuration, Asset
Management & Engineering
Site Support Activities.
> Involved in Loop checks, Functional Checks, Logic Checks and
Plant Start-up support activities.
> Resolving technical issues raised by the EPC and end user.
> Worked in Documentation - Preparation of Project Application
Specification PAS, Instrument Loop
Diagram, Power Consumption & Heat Dissipation, Controller
Loading, Wiring and IO Assignment List,
Cabinet Layout Drawing, System interconnection, Network
Architecture, FAT & SAT Procedure and its
Reports & handed over all Records in Time.
> Successfully Commissioned the Harbor Area, Shell GTL Site @
Qatar.
> Successfully completed the Site Inspection Testing SIT and
Site Acceptance Testing SAT.
Achievement:-
> Received Outstanding Performer for the year 2010 - Successful Site
Commissioning of Shell GTL Project in Qatar.
Project # 2:-
AGIP PROJECT, Kazakhstan (Oil & Gas) (3 Months (Jan 2010 to Mar 2010)
END USER/EPC AGIP Kazakhstan
LOCATION FAT @ Chennai
Roles DCS Application Engineer
Responsibility Detailed Engineering, Project Implementation, IFAT & FAT
Nature of Work:-
> Involved in Installation, Application Development, Detailed Engineering
and factory acceptance test activities of DCS control system
> Installation, Application Development, Engineering and FAT activities.
> Worked in Installation of Cabinets - System Cabinet, Marshalling
Cabinets, and Fiber Optic Cabinet.
> Template, Taglist Creation & Database Configuration in
Integrated Control Configurator (ICC) &
Foxcae tool.
> Logic Implemented as per control narrative, P&IDs, Plant
Requirement and Customer Needs. Worked
With HLBL/Sequence programming, VB scripting and Calca
Programming.
> Graphics Building - Building Symbol, Overlay & HMI Design
Configuration as per P&ID, Plant
Requirement & Customer needs.
> Worked in Third Party System Integration/Field Device System
Integration - Serial Communication
For Triconex System.
> Worked in Historian, Annunciator, Alarm Configuration &
Engineering Site Support Activities.
> Involved in Loop checks, Functional Checks and Logic Checks.
> Resolving technical issues raised by the EPC and end user.
> Worked in Documentation - Preparation of Project Application
Specification PAS, Instrument Loop
Diagram, Power Consumption & Heat Dissipation, Controller
Loading, Wiring and IO Assignment List,
Cabinet Layout Drawing, System interconnection, Network
Architecture, FAT & SAT Procedure and its
Reports & handed over all Records in Time.
> Successfully completed the Factory Acceptance Test FAT.
Project # 1:-
KGD6 PROJECT, INDIA (Oil & Gas) (1Year 2Months (Dec 2008 to Jan 2010)
END USER/EPC Reliance Industries Limited
LOCATION Site Commissioning (SIT, SAT) @ India
Roles DCS Application Engineer
Responsibility Detailed Engineering, Project Implementation, IFAT & FAT,
Installation and Site
Commissioning (SIT & SAT).
Nature of Work:-
> Worked in Onshore & Offshore Platform
> Involved in Installation, Application Development, Detailed Engineering
and commissioning activities of DCS control system
> Template, Tag list Creation & Database Configuration in I/A Intelligent
Automation & Control Configuration (IACC).
> Graphics Building - Building Symbol, Overlay & HMI Design Configuration
as per P&ID, Plant requirement & Customer needs.
> Logic Implemented as per control narrative, P&IDs, Plant
Requirement and Customer Needs.
> Worked with HLBL/Sequence programming, VB Scripting and Calca
Programming.
> Worked in Serial Communication (Third Party System Integration/ Foreign
Device System Integration FDSI) in DCS for the following devices - ABB
(VFDs, Motors, & FGS), GE (Machine Monitoring System), Schneider (MV
Motors & Elics Pkg), Rotark Pakscan MOV, Emerson Wireless HART, Daniel
System Floboss Metering System, Siemens GTG Transformer, Triconex, HIPPS,
BMS System, L&T RTU, AB, Kalki Protocol Converter and so on.
> Expertise in commissioning of HART Devices & Foundation Field bus
devices. Handled Foundation Fieldbus Devices like Emerson, Foxboro, ABB,
E&H, P&F, Samson, Magnetrol, MTL FF diagnostic modules & Fisher Devices.
and so on
> Worked in Historian, Annunciator, Alarm Configuration, Asset management &
Engineering Site Support Activities.
> Involved in Loop checks, Functional Checks and Logic Checks.
> Resolving technical issues raised by the EPC and end user.
> Worked in Documentation - Preparation of Project Application
Specification PAS, Instrument Loop Diagram, Power Consumption & Heat
Dissipation, Controller Loading, Wiring and IO Assignment List, Cabinet
Layout Drawing, System interconnection, Network Architecture, FAT & SAT
Procedure and its Reports & handed over all Records in Time.
> Completed the Site Inspection Test SIT & Site Acceptance Test SAT.
> Successfully Commissioned the KGD6 Site @ India.
Achievement:-
> Received Outstanding Performer for the year 2009 - Successful Site
Commissioning of KGD6 Project in Kakinada, Andhra Pradesh, India.
Technical Skills:-
Technical SKILL Sets
Type\Company Invensys ABB
DCS Foxboro DCS ABB DCS
PLC Triconex ABB SIS
Platform Onshore & Offshore Onshore
Project Type Brown & Green Field Activity Green Field Activity
Site Survey Site Survey for Expansion -
Project
Online Tie-in & Tie-Out Activity -
modification
Industrial FCP40/60/70 & FBM Modules, AC800M Controllers and IO
Hardware
Modules
Industrial Infusion Engineering 800xA Control Builder M,
Software Environment IEE, Engineering Studio &
I/A Series Control Engineering Workplace.
Configuration IACC &
Integrated Control Configurator
ICC -
Foxcae
HMI FoxDraw Graphics Builder
Third Party Modbus (Serial - RS232, 422, Modbus (Serial - RS232,
Package 485, 422,
TCPIP), TSAA, OPC 485, TCPIP), OPC-Soft IO,
TOP
Server, Generic OPC
Control
Network
Industrial Foundation Fieldbus, Profibus & HART, Wireless HART
Protocol
System Design System Installation, System Setup, System Planner &
Committal
Configuration
Logic Engineering DCS Application Engineering, DCS/SIS Application
Complex Engineering, Complex
Control Loop Configuration Control
Loop Configuration
Administration - System Administration
E144 System Health - E144 System health check
Check
Historian AIM AT historian 800xA History, Information
Manager (Pin Data Gateway
Collector & Pin Data
Gateway
Server Configuration)
Asset Optimization - AMS for FF & HART, CLAM
Loop tuning and
Performance
Monitoring.
Backbone Router - Backbone Router
Configuration Configuration
Networking Switch Configuration, Mesh Switch Configuration,
Networking Router
Configuration, Network
Address
Translator
Meetings FEED, Kick-off Meeting, Minutes of Meeting
FAT & Site Internal FAT, Factory Acceptance Test FAT, Site
Commissioning Commissioning Activity SIT,
SAT, Start-up Support & Shutdown Activity
Operating System Windows 2000,2003,2007,2008,XP,Vista
Reporting Tools MS Word, MS Excel, PowerPoint, Access & Visio
Professional Qualification
Degree : M.B.A in Technology Management
University/Batch : Anna University/ 2012-2014(Till Date)
Class & Percentage : Final Year is in progress.
Degree : B.E. in Electronics & Communication
Engineering
University/Batch : Anna University/2004-2008
Class & Percentage : First class with Distinction (84.34%)
Degree : HSC
University/Batch : Govt Boys Hr. Sec School/2002-2004
Class & Percentage : First class with Distinction (82.0%)
Degree : SSLC
University : Grace Matric Hr. Sec School/2001-2002
Class & Percentage : First class with Distinction (80.0%)
Awards & Certificates:-
> Received Outstanding Performer Award for the Successful Site
Commissioning of following project
> KGD6 Project (2009) &
> Shell GTL Project (2010).
> Successfully completed ABB Certificates for the below
> E144 800xA System Health Check
> T305 800xA Administration and Maintenance
> T315 - 800xA System Engineering with Control Builder &
HMI Graphics Builder
> T306 Information Manager
> T317 Foundation Fieldbus & Asset Optimization
> T318 800xA History Configuration & Maintenance
Personal Information:
Date of Birth : 20th Jan 1987
Nationality & Country : Indian & India
Gender : Male
Marital Status : Single
Passport Number : H7374944
Hobbies : Reading Books, Playing Games & Listening Music
Language Known : English, Tamil and Hindi
International Travel : Yes
Notice Period : 2-3 Months
US Visa : Business Visa Expiry on 25 March 2023
Linkedin Profile : in.linkedin.com/pub/bharath-arun-b/21/754/235
Place: Chennai, India
Date: (B. Bharath Arun)