PROFESSIONAL SUMMARY

Years of Experience Level of Skill*

Nuclear Project Management and 5+ Years Senior

Controls

Planning, Development and Change 15+ Years Senior

Control

Project Management/Management Role 15+ Years Senior

Tracking, Reporting, Budget and Scheduling 20+ Years Senior

Director of Procurement 25+ Years Senior

TECHNICAL SUMMARY

Primavera P3 (10 years) Proficient on P5.0 and P6.0 and P7.0, ISO Procedures, Word, PowerPoint, Access, Excel,

Oracle, Visio, Project Net, Sure Track, and Webster, AS400 Purchasing Program, and SAP. Super User for P6 and P7

training of others.

PROFESSIONAL EXPERIENCE

Seminole Electric/Ranstad Engineering

November 2012-April 2013 (consultant

Planner-Procurement-Inventory-Receiving-Logistics

• Working in the warehouse doing inventory, receiving, stock code changes, catalog additions, and quantity changes.

• Purchasing, requisitions

• Review, analyze, plan and schedule work orders to be performed by Maintenance, Operations, and Contractors,

including availability of spare parts. Develops routine preventive maintenance job plans. Develops, plans, schedules,

and monitors annual outage maintenance tasks. Maintains records for issuing, tracking and history of preventive

maintenance. Ensures periodic maintenance intervals are correct and accurate test dates are entered within the

Synergy maintenance program. Oracle, Synergen, Microsoft

• Working with Fed-EX, UPS and major trucking firms to ship and receive

White Construction

August 2012-October 2012 (Consultant)

Lead Master Scheduler Procurement-Inventory-Receiving-Logistics

• Working at a Biomass Cycle Plant in Tampa, Florida this is a complete reconstruction of an old Plant

• Once running and reconstructed.

• Duties included:

• Maintaining and updating 10,000 activities for the civil, mechanical, construction and supervision of this large Biomass

Cycle Plant.

• Weekly and monthly meetings and updates to keep everyone up to speed on the progress and work that was being

performed on time and the activities that were waiting on materials or inspections.

• Walk downs of this large cycle plant and keeping the supervisors and the managers.

Accounting, Cost Coding and Resource Loading.

• Supervising and Leading 6 schedulers.

• Primavera, Microsoft, Oracle

Page 1

• Division and Outage Working with Fed-EX, UPS

Working with Fed-EX, UPS and

Management. and major trucking firms to ship

major trucking firms to ship and

and receive

receive Modifications,in-processing,

and outage scheduling

MNES, Fort Mill, South Carolina

• Keeping job cost, resource Dominion Power

loading, and schedule in a August 2010 - March 2011

timely manner. (Consultant)

• Using P7 for two different job Project Control Engineer

Procurement-Inventory-Receiving-

locations primavera software

issues, updates, EVM, Logistics

baselines, WBS, Resource

loading, cost accounting, and

• Master Scheduler working for

critical Paths.

MNES in collaboration with

• In charge of planning and URS, AEA and Dominion

scheduling for the in- Power on the construction of a

TIC Construction processing for the PEM group new Power Plant.

and the Fleet Division.

February 2012 - March 2012

• Nuclear Modifications and

(Consultant) • DOE and DOD Security Outages

Field Engineer II/Primavera Scheduler Clearance Active for Robinson,

• Working in P6 Project

Procurement-Inventory-Receiving- Sharron-Harris and Brunswick.

Logistics Management.

• Accounting, Cost Coding and

• Accounting, Cost Coding and

Resource Loading.

• Resource Loading.

Working on a combined cycle

• Supervising others.

plant in Goldsboro, North

Carolina. This was a new built Primavera, SAP, Oracle,

cycle plant for Progress Duke Energy, Charlotte, North

Microsoft

Energy. Carolina

• Working with Fed-EX, UPS and

• August 2009 – Feb 2010 (Consultant)

Duties included: major trucking firms to ship and

Master Scheduler/Cost Accounting

• receive

Maintaining and updating

Procurement-Inventory-Receiving-

10,000 activities for the civil,

Logistics

mechanical, construction and

supervision of this large Babcock & Wilcox

Combined Cycle Plant. Master Scheduler for the

• Nuclear Division and Outage

March 2011 - September 2011

Weekly and monthly meetings

Management.

(Consultant)

and updates to keep everyone

Project Control Engineer

up to speed on the progress Nuclear Modifications and

and work that was being done Outages

Master Scheduler for the

on time and the activities that

Nuclear Division and Outage Keeping job cost, resource

were waiting on materials or Management. loading, and schedule in a

inspections.

• timely manner.

Nuclear Modifications and

• Walk downs of this large cycle

Outages Using P6 for two different job

plant and keeping in touch with

• locations.

Keeping job cost, resource

the supervisors and the

loading, and schedule in a

manager Super user for all of Duke in

timely manner.

• primavera software issues,

Primavera, Microsoft, SAP,

• updates, EVM, baselines, WBS,

Using P7 for two different job

Oracle

Resource loading, cost

locations primavera software

• Working with Fed-EX, UPS accounting, and critical Paths.

issues, updates, EVM,

and major trucking firms to ship

baselines, WBS, Resource Working on all the Duke Sites

and receive

• My security clearances and • Accounting, Cost Coding and

work pertained to Sharon-

BHI Energy/Progress Energy Resource Loading.

Harris.

September 2011 – February 2012

• Supervising others.

(Consultant) Accounting Cost Coding and

• IT Implementation, conforming,

Ace Long Term Planner Procurement- Resource Loading.

building and supervising others

Inventory-Receiving-Logistics

• Supervising others

• Primavera, SAP, Oracle,

• Primavera, SAP, Oracle,

• Microsoft

Long Term Planner/Scheduler

Microsoft

Manager for the Nuclear

Page

• Primavera software issues,

Trans-Nuclear, Columbia, Maryland General Electric, Schenectady, NY

updates, EVM, baselines,

August 2008 – Feb 2009 (Consultant) 2002 - 2005 (Consultant)

WBA, Resource loading, cost

Master Scheduler/Project Planner/Scheduler Procurement-

accounting, and critical Paths.

Management Procurement-Inventory- Inventory-Receiving-Logistics

• Accounting, Cost Coding and

Receiving-Logistics

Resource Loading.

• •

In charge of 7 schedulers on 7 Purchasing of all outage

different sites, Master

• materials, payroll, time sheets,

Master Scheduler in P6 and P3 Scheduler. contracts, percentages

keeping track of all deliveries

• complete, schedule in both

Primavera, SAP, Oracle,

and builds for sites.

suretrak and baseline.

Microsoft

• Nuclear Modifications and

• Informed management of the

Working with Fed-EX, UPS and

Outages

percentage completed, all

major trucking firms to ship and

• Implementation of Schedule for purchasing and contracts.

receive

6 Project Managers.

• Master Scheduler in Primavera

• Deliveries of Fabrication and 3.

Assembly of units for Spent

• Responsible for Baseline

Waste on all Projects.

Software.

• Working with 6 Project

• Report to the Site Manager and

Mangers on Civil and

Project Manager all aspects of

Commercial Construction for

schedule vs. goal both

all Projects.

financially and accomplishment

• Primavera software issues, issues.

updates, EVM, baselines,

• Worked with commercial

WBA, Resource loading, cost

companies, documenting man

accounting, and critical Paths.

hours, and transmittals of bid

• Sevenson Environmental Services,

Accounting, Cost Coding and packages, and invoices for the

Niagara Falls, NY

Resource Loading. commercial builders.

2005 – 2006 (consultant)

• •

Supervising Others Managed all accounts, and

Master Scheduler/Project

responsible for the daily

• Control/Procurement-Inventory-

Primavera, SAP, Oracle,

performance of scheduled

Receiving-Logistics

Microsoft

meetings.

• Working with Fed-EX, UPS and

• Maintained and coordinated all

major trucking firms to ship and

• Material Management Reports

Procurement and materials

receive

Tracking and Material

management, change orders

Reporting Forms Tracking.

and submittals.

Florida Power and Light, Juno Beach,

• Primavera software issues,

Florida Working with RFQ's and RFI's.

updates, EVM, baselines,

2006 – 2008 (Consultant)

• Working with Insurance and WBA, Resource loading, cost

Master Scheduler

Bonds for Insurance Liabilities. accounting, and critical Paths.

• •

Master Scheduler in P3 and

• Working with Fed-EX, UPS and

Master Scheduler in P3, P5

P5. major trucking firms to ship and

and P6 keeping track of all

• receive

outages for Saint Lucie, Turkey Working with a 500 million

Point, and Seabrook. dollar project in Fort Edward, Nuclear Modifications and

New York. Outages

• Working on multimillion power

outages on nuclear. Management of Civil

Construction with DA Collins.

• Resource loading, level of

General Electric

effort, and implementation. Primavera software issues,

Planner/Scheduler Norcross,

updates, EVM, baselines,

• Lead for 6 project managers, GA

WBA, Resource loading, cost

Civil, Mechanical, and

accounting, and critical Paths.

Electrical. 2000 – 2002 (Consultant)

• Primavera, SAP, Oracle, Procurement-Inventory-Receiving-

• Nuclear Modifications and

Microsoft Logistics

Outages

Working with Fed-EX, UPS

• and major trucking firms to ship

A badge employee for Absolute

• Worked in Primavera P3

and receive

Consulting.

program doing data entry and

scheduling for the E- for Civil and Large Commercial Queensbury High School

Engineering group, Project Construction. Regents Diploma

Scheduling

• Adirondack Community College Two

Interviewed prospective

• years Liberal Arts (no degree)

Program, Visio, Sure Track, suppliers determining such

Liberty Tax Service Tax

Webster, Excel, and Access. factors as lead-time, present

Class for individual Tax and Corporate

market conditions, price,

• Drafting and working designs Tax

discounts offered and

as a master scheduler in the availability.

engineering department.

• Assisted in compiling quote

• Primavera software issues,

requests for Large Commercial

updates, EVM, baselines,

and Civil Construction.

WBA, Resource loading, cost

• Generated project purchase

accounting, and critical Paths.

orders.

• Nuclear Modifications and

• Worked with contractors and

Outages

suppliers to make sure all

machinery and equipment

Encore Paper Company, South Glens

were on time according to my

Falls, NY

schedules for the Civil and

1998 – 2000

Commercial Construction for

Director of Purchasing Procurement-

the Projects in which they were

Inventory-Receiving-Logistics

on.

• Working with ISO 9000 and

ISO 9001 completing forms

and criteria needed.

• Processed contracts and

• Working with Fed-EX, UPS and

internal contracts for all types

major trucking firms to ship and

of procurement within the mill

receive

including shrink wrap, pallets,

Perini motors, etc.

• Responsible for the daily

buying on the Suggested Buy

Do-Awl Construction

Report.

1986-1998

• Worked with local and non-

Residential Construction

local vendors and suppliers

Owner/Operator-Direcor of

processing both manual and

Procurment

computerized Purchase Orders

for all departments and offices

within the mill.

• Planner /

Worked with the shipping

Scheduler/Procurement

department to make sure

Procurement-Inventory-

shipments of raw materials,

Receiving-Logistics

parts, products and equipment

were on time according to my

schedules.

• Estimates

Working with Vendors on

negotiating their contracts and Purchase Electrical, Plumbing,

orders on the best price quotes Masonry, Construction

• Building Residential Homes

and Renovations from the

ground up

Kamtech, Inc., Glens Falls, NY

• Supervising 4 Crews

• Working with Fed-EX, UPS

1993 - 1998

Director of Procurement-Inventory- and major trucking firms to

Receiving-Logistics ship and receive

• Procurement of equipment and EDUCATION

services supporting all projects

within established guidelines

Page



Contact this candidate