**** * ***** ***** *****# 719-***-****
Worth IL. 60482
Experience:
ALANTIC PLANT SERVICES LLC, JOLIET IL.
Heat and Frost Insulators local #17
Temp Permit Helper 6-2013 thru 10-2013
Working at BP refinery 6 day aweek-10hrs days in field fabrication shop. Inventory
control of all material sizes needed to set up work for up to 200 men per day. Unload
trucks and verify counts of all material from manifest and order new material when
needed. Fill out safety sheets (PTSA) for work that would happen each day and list all
proactive safety precaution needed to make job safe. Cutting straps and metal to sizes
and making end caps as necessary to keep men working waiting for new material.
THE IRON SHOP, COLORADO SPRINGS, CO.
Estimator / Project Manager / Shop Foreman 4-2011 thru 2-2013
Executing material take-off, pricing and shop & field labor for steel stairs and handrail,
balcony rails and misc. structural. Verify all material needed to buy for each job. Make
shipping lists. Set up field crews. Verify all change order work and added cost.
ROCKY MOUNTAIN METALCRAFT, COLORADO SPRINGS, CO.
Senior Estimator / Project Manager 3-2007 thru 8-2009
Executing all material take-off, shop labor, field labor and equipment costs, price all
material needed for fabrication and erection, create proposal letters to general
contractors, prepared request for information letters to architects and engineers.
Prepared all structural and miscellaneous Iron bids with a complete breakdown of shop
hours, material, shop drawings, and all equipment and field labor cost. Review and
compare bid drawings to contract drawings. Executed extra work change orders to
owners. Provide cost breakdowns for billing and created a working relation with General
Contractors and owners.
PAUJAX STEEL ERCTORS, INC, CHICAGO, IL.
Owner of a Structural Steel & Misc. Fabrication/Erection Company 1-2004 thru 5-
2006
Supervised shop fabrication and field erection. Ordered material & equipment needed.
Shop drawing submittals and material load lists. Wrote request for information letters.
Helped with monthly pay application billings for work completed, attended weekly
scheduling meetings, set-up safety codes and practices and reviewed how to imply in
weekly toolbox meetings, estimated new work material, fabrication and erection.
Reviewed addendum drawings. Executed extra work change orders to owners and
created a working relation with general contractors.
WINDY CITY IRON WORKS, CHICAGO, IL.
Field Superintendent/Project Manager 4-2001 thru 11-2003
Supervision of Iron workers, crane equipment and material load lists, obtained weekly
iron worker job permits, attending weekly scheduling meetings, set-up new work and
reviewed addendum drawings, wrote change orders to owners and general Contractors
and submit invoices for work completed.
SPRINGFIELD SERVICE SUPPLY INC, CHICAGO, IL.
Project Manager 7-1998 thru 4-2001
Coordinate material take-off, shop labor and erection cost. Create a working relation
with General Contractors, compare Addendum changes from bid drawings, prepared
request for information letters to General Contractors, review shop and erection
drawings to match bid documents and specifications, make shipping list, and prepare
daily field reports on completed work and/or extra charges submitted by field erectors.
ALERT CONSTRUCTION COMPANY, CHICAGO, IL.
Estimator/Shop Coordinator 2-1992 thru 10-1997
Prepare and coordinate steel material and shop drawings for shop fabrication, review
blueprints for Addendum changes for new fabrication/fieldwork costs estimate material
quantities, and summit bid proposals.
UNION IRONWORKER, CHICAGO, IL, DENVER, CO., SAN JOSE, CA.
Ironworker: 1979 thru 1987
Report to the Union Hall and take jobs on the board as needed. Jobs included are
Rebar installation, Hanging steel beams and columns, Stuffing bolts, Welding, Layout
work, Extend tower cranes, Installing metal deck, Installing metal joists, nelson stud
welding, Hanging plumb cables, Installing Safety cable and Surveying setting plates and
anchor bolts.
EDUCATION: Class of 87
California Institute of Construction Estimating, San Jose, CA.
Multi Discipline, AISC Structural Steel, Miscellaneous Steel, Miscellaneous Structural,
Joists, Decking, Stairs, Rails, Balconies, Steel Erection, Blueprint Reading, Material
takeoff and Computer training. 11/2013 OSHA 30 HR Safety course
SKILLS:
Computer, blueprint reading, material take off, vendor / subs pricing, writing PO’s.
Reviewing jobsites for access and erection, field measuring or surveying (own Hilti laser
600). Reviewing & comparing For Bid and For Construction structural and architectural
drawings for change order work. I have created my own Excel spreadsheets for shop
and field breakdown information. Summit shop and field drawings for approval and
fabrication. Reviewing job specifications.
Objective: To utilize my professional experience and skills and tools in the steel
construction industry as an Iron worker, Estimator, Project Manager and previous
owner
JOBS NOTED:
Harold Washington Library Chicago, IL Catwalk/gutters $800,000.00
Three (3) High Schools Chicago, IL 700 tons $900,000.00
United Center Skyboxes Chicago, IL 300 tons $1.8 Million
DePaul University Goldblasts Chicago, IL 830 tons $2.3 Million
Navy Pier Chicago, IL 900 tons $1.9 Million
Com-Ed Unicom Chicago, IL 650 tons $1.9 Million
Cheetah Baseball Stadium Crestwood, IL Misc. Steel $700,000.00
Police Stations #5 and #9 Chicago, IL 900 tons $1.9 Million
North Beach Pier Chicago, IL 450 tons $1 Million
1451 N. Sedgwick Chicago, IL 660 tons $1.2 Million
Bank Note Place Chicago, IL 720 tons $1.5 Million
Wellington Townhouses Chicago, IL 580 tons $967,000.00
American Pharmaceutical Melrose Park, IL 300 tons $425,000.00
Peterson Park Residential Chicago, IL 320 tons $540,000.00
El Camino Hospital Menlo Park, CA 800 tons $1.1 Million
Foster City Office Complex Foster City, CA 650 tons $820,000.00
San Jose Art Museum San Jose, CA 400 tons $650,000.00
125 State Street Chicago, IL 550 tons $740,000.00
Chicago Kitchen and Bath Stairs Chicago, IL 378 tons $478,000.00
Coronado H.S. Auditorium C. S. CO $572,000
Hybrid Buildings (2) C. S. CO 425 tons $530,000.00
Fort Carson CDC C. S. CO 180 tons $340,000.00
REFERENCES:
Lou Reiner W.E. O’Neil Construction Sr. Vice
President
Phone Number: 773-***-****
Email Address: acb6lc@r.postjobfree.com
Reference Type: Professional
Rodney Grabow Integrated Control Systems
Phone Number: 720-***-****
E-mail Address: acb6lc@r.postjobfree.com
Reference Type: Professional
Mark Stack Superintended Atlantic Plant Service
Phone Number: 708-***-****
Reference Type: Professional