Experience:

ALANTIC PLANT SERVICES LLC, JOLIET IL.

Heat and Frost Insulators local #17

Temp Permit Helper 6-2013 thru 10-2013

Working at BP refinery 6 day aweek-10hrs days in field fabrication shop. Inventory

control of all material sizes needed to set up work for up to 200 men per day. Unload

trucks and verify counts of all material from manifest and order new material when

needed. Fill out safety sheets (PTSA) for work that would happen each day and list all

proactive safety precaution needed to make job safe. Cutting straps and metal to sizes

and making end caps as necessary to keep men working waiting for new material.

THE IRON SHOP, COLORADO SPRINGS, CO.

Estimator / Project Manager / Shop Foreman 4-2011 thru 2-2013

Executing material take-off, pricing and shop & field labor for steel stairs and handrail,

balcony rails and misc. structural. Verify all material needed to buy for each job. Make

shipping lists. Set up field crews. Verify all change order work and added cost.

ROCKY MOUNTAIN METALCRAFT, COLORADO SPRINGS, CO.

Senior Estimator / Project Manager 3-2007 thru 8-2009

Executing all material take-off, shop labor, field labor and equipment costs, price all

material needed for fabrication and erection, create proposal letters to general

contractors, prepared request for information letters to architects and engineers.

Prepared all structural and miscellaneous Iron bids with a complete breakdown of shop

hours, material, shop drawings, and all equipment and field labor cost. Review and

compare bid drawings to contract drawings. Executed extra work change orders to

owners. Provide cost breakdowns for billing and created a working relation with General

Contractors and owners.

PAUJAX STEEL ERCTORS, INC, CHICAGO, IL.

Owner of a Structural Steel & Misc. Fabrication/Erection Company 1-2004 thru 5-

2006

Supervised shop fabrication and field erection. Ordered material & equipment needed.

Shop drawing submittals and material load lists. Wrote request for information letters.

Helped with monthly pay application billings for work completed, attended weekly

scheduling meetings, set-up safety codes and practices and reviewed how to imply in

weekly toolbox meetings, estimated new work material, fabrication and erection.

Reviewed addendum drawings. Executed extra work change orders to owners and

created a working relation with general contractors.

WINDY CITY IRON WORKS, CHICAGO, IL.

Field Superintendent/Project Manager 4-2001 thru 11-2003

Supervision of Iron workers, crane equipment and material load lists, obtained weekly

iron worker job permits, attending weekly scheduling meetings, set-up new work and

reviewed addendum drawings, wrote change orders to owners and general Contractors

and submit invoices for work completed.

SPRINGFIELD SERVICE SUPPLY INC, CHICAGO, IL.

Project Manager 7-1998 thru 4-2001

Coordinate material take-off, shop labor and erection cost. Create a working relation

with General Contractors, compare Addendum changes from bid drawings, prepared

request for information letters to General Contractors, review shop and erection

drawings to match bid documents and specifications, make shipping list, and prepare

daily field reports on completed work and/or extra charges submitted by field erectors.

ALERT CONSTRUCTION COMPANY, CHICAGO, IL.

Estimator/Shop Coordinator 2-1992 thru 10-1997

Prepare and coordinate steel material and shop drawings for shop fabrication, review

blueprints for Addendum changes for new fabrication/fieldwork costs estimate material

quantities, and summit bid proposals.

UNION IRONWORKER, CHICAGO, IL, DENVER, CO., SAN JOSE, CA.

Ironworker: 1979 thru 1987

Report to the Union Hall and take jobs on the board as needed. Jobs included are

Rebar installation, Hanging steel beams and columns, Stuffing bolts, Welding, Layout

work, Extend tower cranes, Installing metal deck, Installing metal joists, nelson stud

welding, Hanging plumb cables, Installing Safety cable and Surveying setting plates and

anchor bolts.

EDUCATION: Class of 87

California Institute of Construction Estimating, San Jose, CA.

Multi Discipline, AISC Structural Steel, Miscellaneous Steel, Miscellaneous Structural,

Joists, Decking, Stairs, Rails, Balconies, Steel Erection, Blueprint Reading, Material

takeoff and Computer training. 11/2013 OSHA 30 HR Safety course

SKILLS:

Computer, blueprint reading, material take off, vendor / subs pricing, writing PO’s.

Reviewing jobsites for access and erection, field measuring or surveying (own Hilti laser

600). Reviewing & comparing For Bid and For Construction structural and architectural

drawings for change order work. I have created my own Excel spreadsheets for shop

and field breakdown information. Summit shop and field drawings for approval and

fabrication. Reviewing job specifications.

Objective: To utilize my professional experience and skills and tools in the steel

construction industry as an Iron worker, Estimator, Project Manager and previous

owner

JOBS NOTED:

Harold Washington Library Chicago, IL Catwalk/gutters $800,000.00

Three (3) High Schools Chicago, IL 700 tons $900,000.00

United Center Skyboxes Chicago, IL 300 tons $1.8 Million

DePaul University Goldblasts Chicago, IL 830 tons $2.3 Million

Navy Pier Chicago, IL 900 tons $1.9 Million

Com-Ed Unicom Chicago, IL 650 tons $1.9 Million

Cheetah Baseball Stadium Crestwood, IL Misc. Steel $700,000.00

Police Stations #5 and #9 Chicago, IL 900 tons $1.9 Million

North Beach Pier Chicago, IL 450 tons $1 Million

1451 N. Sedgwick Chicago, IL 660 tons $1.2 Million

Bank Note Place Chicago, IL 720 tons $1.5 Million

Wellington Townhouses Chicago, IL 580 tons $967,000.00

American Pharmaceutical Melrose Park, IL 300 tons $425,000.00

Peterson Park Residential Chicago, IL 320 tons $540,000.00

El Camino Hospital Menlo Park, CA 800 tons $1.1 Million

Foster City Office Complex Foster City, CA 650 tons $820,000.00

San Jose Art Museum San Jose, CA 400 tons $650,000.00

125 State Street Chicago, IL 550 tons $740,000.00

Chicago Kitchen and Bath Stairs Chicago, IL 378 tons $478,000.00

Coronado H.S. Auditorium C. S. CO $572,000

Hybrid Buildings (2) C. S. CO 425 tons $530,000.00

Fort Carson CDC C. S. CO 180 tons $340,000.00

REFERENCES:

Lou Reiner W.E. O’Neil Construction Sr. Vice

President

Phone Number: 773-***-****

Email Address: acb6lc@r.postjobfree.com

Reference Type: Professional

Rodney Grabow Integrated Control Systems

Phone Number: 720-***-****

E-mail Address: acb6lc@r.postjobfree.com

Reference Type: Professional

Mark Stack Superintended Atlantic Plant Service

Phone Number: 708-***-****

Reference Type: Professional



Contact this candidate