CAREER OBJECTIVE
With over 9 years of experience in the construction Project, Maintenance and Shutdown (Planner/ Scheduler,
Cost Control, Field Coordination, in Oil sands) and extensive experience with Primavera P6R8.2, I am
seeking a challenging opportunity in Oil & Gas industry with a Growth oriented organisation where I can use,
share my skills, experience and expertise in meeting Organization goals.
Planning - Scheduling &Control project management – Knowledge
Construction Project
Define activities as per Work order Confirm that all schedules have correct logics for critical
path analysis
Prepare all FIWP’s of Estimate scope of work and CWP
Analyse the Progress, Prepare Earned value and
Efficient field scoping, estimating and management of
performance reports
labour
Aid in development and maintenance of manpower,
Develop and Coordinate with Engineering, Procurement
progress and quantity curves
and Construction (EPC) or operations to identify project
Maintain routine schedules on a current basis ensuring
schedule disconnects and align with actual
all the schedules are correct and accurate in SAP or JDE
Participate in the preparation P&ID’s, scope definition
and detailed cost estimates. Manage or assist the preparation of Schedule Change
Notices (SCN)
Verify all schedules are resource loaded according to
Analyse the Progress, Prepare Earned value and
estimates
performance reports
Develop and track manpower loading projections
Major Maintenance & Turnaround
Organize the scope challenge meeting Analyse the Progress, Prepare Earned value and
Develop reasonable schedule logic and constraints performance reports
based on discussions with task owners or Execution Manage or assist the preparation of Schedule Change
coordinator
Notices (SCN)
Develop manpower resourcing requirement needs that
Assist in producing daily project progress summary
execution coordinators can utilize
reports: percent complete, productivity, man-hour/man-
Support management team in schedule and cost
power
controls / Manage new addendum, Extra work and all
Look for innovative and low-cost alternatives in all areas
Find Work
of schedule optimization
Develop the functional integrated critical path master
Completion forecasts, and providing solutions to mitigate
turnaround schedule that includes pre-turnaround,
schedule delays or optimize Shutdown completion
shutdown, and execution, start-up, & post turnaround
Prepare all FIWP’s of Estimate scope of work and CWP,
phases
IWR
Develop daily three shift look-ahead reports during
Shutdown events
Coordinates requisition of materials, predetermined parts,
special tools, and ensured that equipment to be worked
on is ready and available
Construction Field Coordinator
Plan and coordinate schedule interfaces with owners, Proactively assessing and facilitating bi-weekly progress
other Contractor project team members, vendors, and and monthly reporting.
subcontractors for the assigned sections of the schedule Completion forecasts, and providing solutions to mitigate
schedule delays or optimize project completion
Applies work breakdown structure (WBS) requirements
for each project, drawing from work scope deliverables Evaluating project progress against historical indicators
and key activities to build up the details. and providing Project Group Management with
Develops and tracks manpower loading projections comparative analysis.
Continually monitoring critical path for Management.
Manages information integration from engineers, third
party providers, contractors, and others to create an
integrated master schedule.
: 780-***-****© : ******@*****.***
S B Njoya Resume Page 1 of 4
SEIDOU BOSCO NJOYA
19-240 Laffont way
: 780-***-****© : ******@*****.***
Construction Cost Control
Develop Work Breakdown Structure (WBS) to be used in
the project control
Prepare manpower plans, histograms, and progress curves
Assist in preparation of project cost forecasts, cost studies and what-if scenarios and report project including
Prepare project costs, calculate future costs based on labour productivity, material price, subcontract and risk analysis
Develop, maintain, implement and manage the change control process
PRIMAVER A SKILLS
Primavera P6 R8.2
Create WBS & WBS dictionary Review schedule data, identify and acquire information
needed to complete work logics to interface between
Prepare detailed schedules for assigned scope of work.
assigned trades or specialties
Develop different Level of Project Master Schedule
Determine critical path activities for assigned trades,
work areas or specialties, identify significant activities
Perform quantity and manpower resource loading for
supporting inter-trade requirements
assigned schedules
Perform data analysis, identify problems and makes
recommendations
Integrate inter-discipline schedule requirements and
Monitor schedule deviation for assigned trades or
constraints to establish logical work sequences for
specialties and recommend corrective action/workaround
assigned trades or specialties
solutions for site maintenance consideration
Work with the coordinators and units Team lead to
Identify and reports activities which have critical or
coordinate work sequences with total project plan in P6
potential impact on schedule
TRAINING - SOFTWARE
Work planning and resource scheduling (Primavera P6 – Prepare detailed weekly/monthly cost reports, forecasts
Professional R8.2, Microsoft Project) and analysis
Computerized Maintenance Management System (SAP,
Develop the schedule performance report [Earned value
JDE) (EV), Schedule variance (SV), Schedule performance
Languages: English & French (excellent both written & index (SPI), Cost Performance Index (CPI), etc...
oral)
Perform cost and schedule risk analyses and provide
Automation programming: Omron, Siemens, Allen mitigation proposals to the project teams
Bradley, HIM, Foundation Fieldbus, DCS, SISTurn
Construction Safety Training System (CSTS)
Transportation of dangerous goods
Microsoft Office [Office-excel-power -Point, etc.]
Employment Background
Shell Albian Sands
2009 to date
Turnaround/ Major Maintenance Master Planner/scheduler
Define/Review/Prepare shutdown scopes for both Coordinate with shutdown Materials Coordinator to
scheduled and unexpected Events in liaison with ensure all required spares, materials and service
other groups (Shutdown Planners, Engineering, and contracts are corresponding with the shutdown
Technical, Process, Operations Integrity and other scope
company incumbent departments). During /shutdown executions, this position
Coordinate with Shutdown Planners for the coordinates the scheduling and progress report to
planning of all work orders within the scope of the all levels of the organization
shutdowns (define EPS, WBS, work packages and Integrate “lessons learned” meetings after the
resources configuration in both JDE and Primavera turnaround/shutdowns ensuring that proposed
Project Planner scheduling tools) actions are addressed
: 780-***-****©
S B Njoya Resume Page 2 of 3 : ******@*****.***
SEIDOU BOSCO NJOYA
19-240 Laffont way
: 780-***-****© : ******@*****.***
documented and finalized in the CMMS
Integrate post turnaround/shutdown planning report
ensuring all executed work orders are properly
JV Driver (Albian sands Expansion 1 – JPM)
2007 - Nov 2009
Construction Field Coordinator
Reviewing of P&ID’s Develop and maintain all Level 4 detailed work
• •
Manage the specification and purchase of Participate in the preparation P&ID’s, scope
• •
equipment for medium sized projects definition and detailed cost estimates.
Prepare all FIWP’s of Estimate scope of work and Prepare scope of work and accompanying data
• •
CWP sheets for issue in bid tender and construction
packages.
Define activities as per project, finalize activity
•
durations Evaluating vendor proposals and providing
•
Verify all schedules are resource loaded according recommendations
•
to estimates schedules for the Construction Work Packages
Confirm that all schedules have correct logics for
•
critical path analysis
LEDCOR INDUSTRY
2006 - 2007
Planner /Scheduler Coordinator
Developed maintenance work schedules for area Provided support for routine maintenance and project
maintenance supervisor execution
Maintained work order and communicate to appropriate Developed and managed the backlog for the planned
crew/shop for proper execution resource requirement
Obtained blue prints, drawings, instructions manual, Reviewed with engineer work orders requiring
special procedure to clarify the intent of work order engineering design
Estimated jobs, showed sequence of steps, number of Coordinates requisition of materials, predetermined parts,
mechanics and required man-hours for each step. special tools, and ensured that equipment to be worked
on is ready and available
Ensured all the materials and equipment are in stock for
proper job execution
2003 - 2006
CNRL Horizon Oil Sands Project (Construction PROMEC / RSW)
Assistant Manager Plan 64 (Electrical & Instrumentation)
Prepare transmittal (QC/QA documents, FTR, RFI, CCN, Perform any other job related duty as requested by my
and orders)to CNRL for approval supervisor, excavation for lighting
Manage the project contract document, drawings, Support field operation in all aspect including cost control,
specification and scope of work. planning, scheduling and estimating Field
Prepare different quality insurance, quality control estimate/change orders
document (Procedures, ITR, ITP, ) Write requisition and purchase orders, follow up suppliers
Coordinate installation of electric heat tracing, cable and expedite deliveries
pulling, street lighting and different electrical,
instrumentation devices.
Assist in the development of the project master schedule
with input from other project management personnel
Grande Prairie (Alberta) 2001 - 2003
Enerflex Electric,
Technician
Installation and maintenance of control and instrument Read and interpret drawing and technical plans
panels throughout difference clients’ site. Determine the printed circuits and micro controllers
Programming of programmable automation and operator Conceive and install minor control systems within specific
interfaces applications
Configuration of communication protocol.
Fort St. John (BC) 2000 - 2001
Storm Oilfield Services
Support Technician
: 780-***-****©
S B Njoya Resume Page 3 of 4 : ******@*****.***
SEIDOU BOSCO NJOYA
19-240 Laffont way
: 780-***-****© : ******@*****.***
Perform preventive maintenance of control systems and Work with the maintenance, quality and production team
pumping jack at the client’s location. to resolve problems
Analyse specific requirements and search for the Support field operation in all aspect including cost control,
required technologies to realise a project planning, scheduling and estimating Field
Implementation of new systems and resolve problems on Estimate/change orders
the different configurations.
Lachine (QC) 1999 - 2001
Métafix
Technician
Assemble parts used to manufacture machines used to
treat silver bars. Install and test silver extraction machines
Travelling to different locations to resolve problems Operate a lift truck and machines packaging equipment
Correct and manually modify pieces. Implementation of new systems and resolve
Problems on the different configurations.
Verify and insure that all pieces respect the ISO 9000
quality standards and inspection of pieces provided by
suppliers
Education
Studies in Electrical Engineering
on going
2012 Maintenance management professional
2010 Certificate of Project Management PMP (Exam Prep) Certificate
2009 Certified Oracle Primavera P6 v8.2 – Advanced Emerald Associates Inc
2008 Workface planner Certificate SAIT
2004 Electrical Engineering courses completed University de Trois Rivière Canada
2006 Instrumentation & Controls Technologist Diploma Cégep André Laurendeau Canada
1998 Bachelor’s Degree in Physics, Concentration: Electricity Université Paris XIII Paris, France
Personal qualities
Strong team player & ability to handle multi-tasks at the same time
Ability to meet assign schedule & deliver quality products under pressure
Sound reasoning ability, high level of self-initiative, strong desire to acquire new knowledge and skills
Fast learner, hardworking, adaptable, problem solver with ability to lead
Sound project management skills
Dedicated to personal, public safety and ability to recognize unsafe conditions