Qamar Sheikh
Edmonton, AB
acb2js@r.postjobfree.com - 780-***-****
WORK EXPERIENCE
Sr. Project Engineer /Planner
Rally Engineering - Edmonton, AB
EDUCATION
MBA + Bachelor in MECH ENGG.
UET
ADDITIONAL INFORMATION
Qamer Rasheed Sheikh
3533 11th street, NW Edmonton, Alberta - T6T0J7
Phone: +1-780-***-****
Email: acb2js@r.postjobfree.com
Senior PROJECT ENGINEER
Over 20 year experience in project scope development, detailed cost estimating, engineering design,
material specifications, scheduling, bidding, contractor selection, AFE preparation, MOC preparation, PHA
participation, contractor supervision, field inspections, startup, cost control HSE & construction on a "right first-
time" basis
Direct experience with offshore & onshore plants/ facilities for engineering services to all locations within
the departments, construction, distribution & inspection of Fertilizers, Petrochemical, LNG, oil and gas
industry l Strong in work assignment, tracking progress, checking quality of work and development of staff of
engineering, procurement, construction & in change & risk management
Proficient computer literate, MS Access, Primavera P6, MS Project, SAP, CMMS and MS Office Suite - Excel,
Word, PowerPoint, Outlook and Web Application Security l
Strong Understanding of P&IDs, ISOs, 3rd party inspection, documentation, Logistics, Lifting & Rigging,
drawings & Installation methodology for effective execution & control. l Familiarity with the application of ASME
Code Section I, VIII, IX, ANSIB31.1 & B31.3 l
Posseses superior analytical, organizational and interpersonal skills with experience of supervision of a multi-
disciplined, multinational, multicultural team and flexible approach Strong written, verbal and communication
skills and command in English language
APPEGA application in process.
PROFESSIONAL EXPERIENCE
Rally Engineering Inc, Sherwood Park, Alberta, Canada Websites: www.rallyeng.com Oct
2012 - May 2013 Worked for Statoil projects for Enbridge future Pipeline parameters maintenance of Dilbit
Boster Pump, Keyera Condensate Connection & Blend export pipelines Coordinated activities systematically
for resources, equipment, materials, schedule/ progress, contractor/ team for requirements, reviews &
audits Worked for Suncor Voyageur Tank form EPC project, Coordinated for assets verification, BOMs,
layouts, Maintenance, reliability & quality Controlled & Scheduled execution scope & sub-contracts, WBS,
engineering, Modular and stick built fabrication as per SPIM requirements for safety & quality
SNC Lavalin Edmonton through Panther Technical Services, Edmonton, Alberta, Canada Websites:
www.snclavalin.com and www.panthertech.ca Project Specialist July 2012
- Oct 2012 Worked for CNRL Secondary Crushing Pilot Project, SCPs and Husky Produced Gas & Warm
up Line Maintenance and Replacement project Led for Primary Crushers size, capacity & pilot secondary
Crusher specs, details & budget control baselines with forecasts, trends and reliability analysis. Worked for
SCPs(Sustaining Capital Projects) of Canadian Natural Resources Limited (CNRL) Canada for Horizon Oil
Sands Fort Mackay Work Orders & Strategies, VSM & Secondment requirements
Adamac Group of Companies, Port Harcourt, Nigeria contracted to Chevron Nigeria Limited, Escravos, &
ExxonMobil Nigeria for Integrity and Maintenance Projects Lead Engineering & Planning Feb
2009 - April 2012 Worked on following Projects: TIP-Subsea Pipelines Project- Chevron Nigeria Limited.
worked for Replacement, Turnaround activities, WBS, CBS, Risk, contingency, progress measurement &
reporting, project reports, Provided direction & guidance for the challenges faced for congested work location
of shallow water Pipelines and other installation with complex routing and timing for work execution. MIPS-
Major Pipeline Integrity Project- Mobil Producing Nigeria / MPN (a Subsidiary of EXXON MOBIL). Installation
Fabrications, Commissioning, Abandonment & Recovery of deep-water offshore/ onshore oil & gas assets
for Pipelines, Protection, Transponders, Pipeline Clamps & Repairs, Pipeline De-oiling, Pigging, Hydro/Leak
testing, demolition & abandonment of old pipes, near shore, onshore terminal Jobs, Effluent Channel Rerouting
Platform Shutdowns & Tie-ins related activities with Quay wall/Coffer Dam, Trenching/ Dredging, Piping &
Pipeline jobs OCIP, WRRP, EPC4B and CCPRP Project- Mobil Producing Nigeria / MPN: Led for Repair
and Replacement activities, document control codes, engineering practices, engineering standards as per
client and international standards with Sound understanding of activities performed in phase and applied
procedures/guidelines. Supervised Scheduling, Time sheets and Coordinated for the Platform jobs, Jacket
engineering/ fabrication of the Well Heads, Production Platforms and related Survey and Civil Engineering
deliverables EDOP Restoration, ASASA gas pressure Maintenance - Mobil Producing Nigeria / MPN:
Performed Revamping, Major Repairs and Engineering liaison with client asset managers and operation
personals, Worked for Structured Process, Value Improving, Best Practices for better, economical, faster &
safer performances. Outlined major phases, milestones, risk, organization staffing & contract plans
ADGAS LNG train II Turnaround at DAS Island through Descon Engineering UAE Execution Core Team
Leader Jan 2008- Feb 2009
Responsible for planning, organizing, cost control and implementation of approved projects for replacement
of PGA column, Installation of Third Gas Dryer & three year cyclic turnaround activities for train II Turnaround
2008, Boiler 3 & 4 integrity, Safety, HSE activities at Abu Dhabi Gas Liquafication Co (ADGAS) (Offshore) Das
Island. It included new mechanical equipment; modifications or additions to existing equipment; equipment
maintenance and equipment reliability monitoring with the goal to maintain & improve plant reliability &
reduced production cost. Organized resource & machinery, mobilization & execution control, motivation &
administration setting for objectives, standards, decision-making & problem solving, Coordinated with all
applicable work areas to ensure fully integrated plan/schedule for all equipment, replacement & modifications
was developed & maintained, Managed & reported modifications to approved integrated plan as per company
procedures & requirements, Provided services to modifications & group for progress analysis /performance
report. The challenges of time and budget were successfully met and company was rewarded the extension
of contract for next three years as well.
SAUDI Petrochemical Company (SADAF-SABIC) Jubail, Through SIS KSA: Project Manager April
2006- Jan 2008 Managed daily routine plant maintenance of all plants mechanical, electrical, instrument, civil,
painting & workshop jobs safely & successfully. Plants like Styrene, Ethylene, MTBE, UDD, Salt Plant & EDC
(Ethylene Dichloride) were having STO, modifications, expansions, CFC phase-out and decommissioning
of obsolete plants. Improved Safe work environment with incentives for the first time in that Plant facility
Modifications & Turnaround of SAMREF Saudi Mobil Refinery, Yunbu; KSA: Area Project Lead July 2005-
Mar 2006 Worked for Waste Heat Circuit engineering & procurement for the modification of new Knockout
Scrubber & flare. Organized installation & other turnaround jobs of the area having Reactor Pigtail, refractory &
slide valve repairs, distillation column, new central turbine lubrication system, Re-tubing/cleaning of Crude Oil,
Vacuum breaker, product stripper, product heaters & re-boiler modifications with IPA benchmarking& Plant
KPIs
NATIONAL Fertilizers Limited, Lahore Pakistan Sr. Project Engineer April 1990-July 2005 Worked
on Following Project: Pak-American Fertilizers,, Pakistan (Plant Erection, TOYO, NFC, PAFL Projects)
Interfacing EPC contractor Toyo Engineering Corporation for engineering, construction reliability, inventory,
EOQ, gaps, time with sustainable model for achieving integration & reliable O&M of Urea & Ammonia
Plant. Pakarab Fertilizers Limited, Pakistan (Debottlenecking, BMR, Rehab Projects) Worked on different
conventional projects ($100K - $1 MM range) for Engineering of Sustainable Projects, Reliability & production
Improvement Projects with detailed Analysis & Liaison of Socio Economic, Quality, HSE & Regulations.
Performed preliminary calculations, chalk out strategies, initiate proposal, seek approvals with compatible
material, equipment specifications review & support production concepts. Replaced Synthesis Gas Converter
Basket for improved conversion & Hydrogen Cracker tubes, Worked also for leaking catalyst collection project
of cracked catalyst basket with pyrophoric properties with crack inspection & monitoring of Convertor Shell
& basket, Procured & replaced catalyst for High and Low temperature Shift Converter (loading/ unloading
& disposal), Catalyst Loading/ Unloading of Primary Reformer tubes, Secondary Reformer, Desulpherizer
& Mathenator, Refurbished Old Balkie Wooden Cooling Tower and Basin repair with cooling water pumps
revamps. Decommissioned old Ammonia, urea plant & power-house, Worked for Platinum & Rhodium catalyst
Gauzes & Palladium Catchments' system with M/s Johnson Matthey UK for basic calculations, economic
tabulations, campaign reviews, downstream equipment cleaning & claims for Nitric acid plant.
EDUCATION AND TRAINING
Bachelor of Mechanical Engineering University of Engineering and Technology (UET), Lahore, Pakistan, 1989
Master in Business Administration (Management Information Systems)