Core Competency:
Over Twenty three years experience of erection management, commissioning
and start-up of industrial complexes -Onshore and Offshore project-
Strong organizational and able to manage a multi-disciplinary & multi-
cultural team up to 160 Staff.
Training of local and turnkey staff.
Responsible for overseeing the EPCC package contractor, manage the pre-
commissioning/ commissioning and execution activities.
Coordinate and manage the job with a selection of the most qualified
personnel to be recruited from the partners and contract personnel.
Prepare and manage a commissioning budget.
Review and monitor EPCC contractor pre-commissioning and commissioning
progress.
Coordinate and interface with all project members.
Ensure proper integration with operation department.
Large-scale Project approach on International EPCC contracts
Auditing & process optimization, methods, SIMOPS risk
Interface with other project specialists, co-ordination of technical
activities performed inside or outside the company
Tendering Evaluation & Proposals (commercial & technical)
Establishing, maintaining procedures/processes & reporting
Equipment inspections
Familiarity with process documentation (process simulations, P&IDs, PFDs,
Data sheet for equipment HAZOP etc)
Familiarity with piping/mechanical documentation (piping class, layout,
isometrics, painting, MTO)
Skills& Knowledge:
8 Years in Training
Project Manager (Training & Assessment)
Compiling training manuals and training of new employees.
Training Design and trainer in Oil Gas (Upstream & Downstream)
Civil Work (Project Engineer) From 1985 to 1992 (Building & Roads)
From 1975 to 1995 (Work oversea in Construction, Commissioning, and
Training)
Experience of Units:
- FPSO- Phenol Distillation- Butadiene - HDS - Atmospheric Distillation
-Amine-Sour Water-Effluent Treatment-Claus Unit- Dehydration-Tail Gas-
Sulphur Unit-Acid Gas- CCR- HDT- Hydrocracker- Gas plant & GPL- Utility-
Coal Fire-Cogeneration Unit- Dust Incineration -LNG Plant-Hydrogen -Storage-
Pipelines- Water Treatment-demine water-Boiler-Combine cycle-Nuclear
Treatment-gas turbine - Steam turbine (Condensation &back pressure)
Oil & Gas production onshore Offshore. Reverse Osmosis(Toray Membranes)
TOTAL TABK 06/12_06/13
TOTAL ACADEMY UAE (Emiratisation)
Offshore Training Coordinator
Participate in or coordinate and supervise the preparation and
implementation of the apprentices and the company's employees OJT programs
and its adaptation to prepared programs.
Organise meetings with supervisors and local management at regular
intervals to ensure follow-up and permanent evaluation.
Review and upgrade the technical training materials prepared by technical
trainers in accordance with field specifications.
Give assistance to the company's supervisors and mentors in the supervision
of the OJT activities on site
Provide the management and personnel with the necessary tools and resources
to prepare and organize training actions.
Supervise internal mentors and possibly external instructors and check the
performance of training programs.
Participate to daily work permit meetings. Schedule or modify where
necessary OJT activities in relation to the work on site.
Participate in or ensure training program execution coordination.
Organise training schedule.
Check continuously training activities according to the plan.
Assess trainee's performance with mentors and cross-check the level of
competencies.
Review and update the assessment sheets with the help of supervisors.
Collect from the mentors or supervisors the assessment sheets and verify
their quality content.
Safety training
Ref: Laurent Chiabotto, Jean Marc Aldebert, Laurent Dolmetta, Eric
Delattre, Mohamed Tamiemi, Maurice Loubet;
VEOLIA QARN ALAM (OMAN) 04/12-06/12
Commissioning Advisor
Logic Sequence (auto start and shut down)
De aerator (capacity 200M3/H)
Cartridges Filter, Median filters
RO Train (Toray Membrane)
Training and OJT
SIDEC WEST INDIES 04/2011-01/2012 (QUADELOUUPE MARTINIQUE)
Project Manager
Coal and bagasse power plant
Integration New Units: Crusher smoke treatment erection (Commissioning &
Start-up) new
Warehouse and administration building
Team (5)
Auditing & process optimization, methods,
Interface with other project specialists, co-ordination of technical
activities performed inside or
Outside the company
Tendering Evaluation & Proposals (commercial & technical)
Establishing, maintaining procedures/processes & reporting
Equipment inspections
Study Case
Process documentation (process simulations, P&IDs, PFDs,)
Prepare and manage budget.
THERMODYN France 01/2011 -Auditor la Colette JERSEY
Site Coordinator Energy from Waste
Commissioning Audit Steam Turbine
Involve on verification and application of Thermodyn Standard
Interface with the client
Pre Com / Com &Start-up Condensing unit steam turbine (Generator Andritz
12 MW)
Automate GE Fanuc /G60
Interface with PM regarding Back charge dossier
THERMODYN France 10/2010-12/2010-Dalkia Project Biomass station
Site Coordinator Start-up
Involve on Start-up of 2 steam Turbines
One at 43 MW Connected to a Biomass Boiler (Wood) Condensation steam
turbine
One at 21 MW Connected to a Black Liquor Boiler. Back pressure steam
turbine
GE Fanuc Automat and Woodward 505
Ensure Logic system is valid and software modification in the GE Fanuc
Writing Start-up manual
Performance test steam turbines
Following mechanical part of the steam turbine
SAMCCA France 01/2010-07/2010 Consultant Commissioning training &
resources
Developing Training Courses Oil & Gas
Developing Competences Assments
Developing Training Course in Commissioning
Commissioning Audit
Developing HSE Course
Redaction on MAQ for the company
LITWIN / GRT 07/09 -12/2009 Site Manager
Involve of end of Construction Commissioning and Start-up of Gas Station
Use Icaps and GRT spec
2 gas turbines with compressors SOLAR (Flow rate8 millions square cube of
gas at 75 Bars
Utility station including 20KWA, TBGT, Battery 24,120,400 Volts
ESD matrix
Pipeline
Redaction of performance test
Simops Operations including Risk assement
Preparation of documentation for the Mechanical acceptance
Ready for gas in and start-up
Review and monitor EPCC contractor pre-commissioning and commissioning
progress.
Coordinate and interface with all project members.
Ensure proper integration with operation department.
Technip France: F.P.S.O. AKPO Project offshore 2008/2009 Nigeria
Commissioning activities in line with required prioritization & schedule
for milestone handovers, introduction of first hydrocarbons (Methanol),
First Oil & First Gas. Liaising directly with Hook Up team, Field
Operations & UFR contractors (Saipem) during mooring activities,
installation of Umbilical's, Flow lines & Risers.
Commissioning Manager in charge preparation and commissioning. Total Team
included vendors 126 persons.
Different Vendors for packages to be commissioned
Sub Contractors HP leak test with Helium and Nitrogen Halliburton
Roll Royce 6 Gas Turbines with WHRU
Writing performance test procedure
Simops Operations
Hull: 350M/60/32 meters
Oil storage capacity: 2 million barrels
Scheme Production 235 kBLP + 530 MMSCFD
Export Condensate to tanker 185 kBOPF
Dehydration Unit, Gas Export 320 MMSCFD at 200 Barg to Amenam
Produced Water :150kBWPD
Water treatment
Water Injection : 420 kBWPD at 220 Barg
Gas Injection 185 MMSCFD at 400 Barg
Review and monitor EPCC contractor pre-commissioning and commissioning
progress.
Coordinate and interface with all project members.
Ensure proper integration with operation department.
TOTAL LEUNA 01/2008-08/2008 Commissioning and start up Manager
ADU/VDU REVAMP PROJECT & T&I 2008
TRM refinery plans to debottleneck its crude atmospheric/vacuum
distillation complex, with the following main objectives:
Reduction of Vacuum Residues (VR) production
Revamp the ADU Heater by installing a new pre-heater (APH)
Maximize kerosene production at the expense of Naphta
Installation of the new pumps around the section K1003 aimed to draw off
the HHGO side cut. This implies the replacement of existing trays, 41
thru 46, and installation of items associated with the new pumps.
Replacement of existing N 6 trays in the top section of K1003 and of the
existing reflux line distributor with new ones in Monel.
Installation of the new draw off HHGO"
Installation of an additional Kerosene product Heat Exchanger.
Installation of the new air-cooler
Revamping of the existing heater.
Simops Operation
Edit Sub System Marked-up PID'S
Redaction and Validation by Authority T V
Pre Com & Com Manual Execution Plan
Meeting with Authority T V
Preparation of documentation to be valided by T V
JSA
Lines Cleaning & gross Leak Test Procedures (Precom)
Pinch List Procedure
As Built Drawing Procedure
Intro to Opercom
Edit Check Sheet Pre Com & Com used for the Project
> Coordination Meeting with TRM
R f TOTAL : Nabil Lazrak Project Manager
ENI CONGO 07/2007-11/2007 TRAINING CONSULTANT
Train 22 new employee (Production Operators)
Thermodynamic, Chemistry of water, maintenance, Techno of different
materials
Fundamental process, PFD, PID, BFD
Process instrumentation
Unit Wells (PCI and Gas Lift, test Separator
Production Separator, Deshydratation
Glycol Unit, Amine Unit
Gas Lift Compressor,
Water treatment
Demin Unit
Hot oil system, Oil Stripping
HSE training + Work permits
Creation of one Work Book for trainees
Preparation and redaction on competence guide for OJT
Preparation and Validation on Assement Worksheet
Basic oil for none production
R f ENI : Alain Bourgeois
TECHNIP AUSTRALIA 01/2007-06/2007 Client WOODSIDE
COMMISSIONING ENGINEER
Review and monitor pre-commissioning and commissioning progress.
Coordinate and interface with all project members.
Precom and Commissioning 2 trains LNG,UTILITY
Writing commissioning procedure OTP & LTP
WIN PCS database
Meeting with Client
Simops Preparation
Risk Assement
Units 2 trains LNG
Review ESD matrix(Sub contractor)
Pipeline (Pre Com & Com)
Storage
Utility air, Instrument air,
Demin plant(Veolia)
Nitrogen License Kaevner
Amine Technip License CO2 Oxidizer
LPG/NGL Fractionation (Cryomax) Technip License
Mole sieve Unit with Mercury Guard Bed (CECA)
MEG Unit
Turbo Expander
R f TECHNIP : Jacques Tronche
TOTAL INDONESIE 12/2005-12/2006
SPDT PROCESS ENGINEER AND MECHANICAL
PROJECT TAMBORA 2 (3 GATHERING AND 2 MODIFICATION) & TUNU 10 (4 GATHERING)
Writing commissioning procedure OTP & LTP as per Opercom
ICAP database
Following punch List
Meeting with OPS
Risk Assement+Work permits
Pre Com Pipeline to CPU
ESD matrix &Instrumentation
Review and monitor EPCC contractor pre-commissioning and commissioning
progress.
Coordinate and interface with all project members.
Ensure proper integration with operation department.
TECHNIP (TURKMENISTAN) 02/2005-11/2005
DEPUTY COMMISSIONING MANAGER
DHT Gas Oil Licence Axens
Sour Water Treatment
Amine Unit
Claus and Tail Gas Licence KTI
Utility (Cooling Water, Demin Water, Nitrogen Plant, Offsites)
Ensure ESD matrix ready for Start-up
Responsible for overseeing the EPCC package contractor, manage the pre-
commissioning/ commissioning and execution activities.
Coordinate and manage the job with a selection of the most qualified
personnel to be recruited from the partners and contract personnel.
Compiling training manuals and training of new employees.
Prepare and manage a commissioning budget.
Review and monitor EPCC contractor pre-commissioning and commissioning
progress.
Coordinate and interface with all project members.
TECHNIP MALAISIE Client EXXON MOBIL05/2004 -12/2004
OTP WRITER EPC
Writing procedure pre commissioning and commissioning
Writing Operating pocedure for start-up and normal operation
Writing Operating Manual (molecular sieve et compressors HP)
Check sheets pr com et commissioning (Win PCS)
TOTAL GABON 8/ 2003-4/2004
PROJET MANAGER
Evaluation, recruitment 50 Operators
Training and validation by Opertrain methodology
Following budget and invoice
R f TOTAL: Marc Fourneraut
MARATHON OIL GABON 2003
PROJET MANAGER
Assessment 24 operators, mechanical, and electrical
Report and training plan
SHELL GABON2002-2003
TECHNICAL COORDINATOR
OPITO Hydrocarbon assessor PRODUCTION (65 candidates)
TOTAL CONGO 2002 ADCE
training instructor
Operguid procedures
Redaction procedures
Redaction Operating Manual
TOTALCONGO 2002-2001
PRODUCTION ENGINEER
In charge of plant failures technical analysis and identification of
solutions aiming at improving operations
Plant performances analysis and recommendations aiming at optimizing
operations
Existing operational procedures updating
Missing procedures writing with operators assistance
Follow-up and classification of site documents
Operators training "On the Job Training"
Meticulous preparation of large interventions: decomposition of those
interventions in controlled elementary tasks, means adequacy :
interventions quality and teams respect guarantee
Took care of the respect by the producers of provision and handing-over
at disposal
Procedures
Took care of plant optimal control and safety
Took care of the systematic edition of a report of each failure
Total Congo staff : 80 people including 60 operators
Oil output : 50 000 bbl/day
TECHNIP / MIDOR (EGYPT) 2001-2000
UNIT ENGINEER (DEPUTY START UP COORDINATOR)
Pre commissioning, commissioning and start-up
TECHNIP tools management updating for pre commissioning follow-up
Punch list follow up
UOP process hydrocracker
MKTI process hydrogen
MKTI process of Tail gas sulphur unit
UOP process HDT gasoil
Offsite
Water treatment+ demine Plant
Flare
GROUPEMENT TFT (ASSOCIATION SONATRACH / TOTAL FINA / REPSOL) 2000
Training Consultant
USINE DU CHAMP DE TIN FOUYE TABANKORT (ALGERIE)
Create job ticket of production ( shift engineer DCS operator chemist)
Elaboration training plan
Assessment production personnel
Redaction of training manual
Redaction of procedures and incident report
Training of lecturer
R f TOTAL : Jean-Marie PERDU
KREBS - KREBS - AKTABINSK (KAZAKSTHAN) 1999
START UP ENGINEER
Assistance to the client for tests and start-up of alcohol distillery
TOTAL SIRRI (IRAN) 1999-1998
OJT supervisor on Sirri E field
Commissioning, start-up offshore platform
OJT for iranian panel operators
Commissioning, operating, testing procedures
Pre Com,Com and Dewatering Pipeline
TECHNIP BONNY LNG COMPLEX PROJECT (NIGERIA) 1998
COMMISSIONING SUPERVISOR
Commissioning of Utility and Train 1 LNG Plant
BABCOCK 1998 CORBEILLES SUGAR MILL
Start-up head
Start-up of a 75 T/h, 65 bar boiler monitored with PLC Telemecanique
CNIM 1998 HOUSEHOLD WASTES INCINERATION PLANT, CHAUMONT
Supervisor
Preliminary tests and start-up of installations
CNIM furnaces - 2 x 5 T/H
CNIM boilers - 2 x 15 T/H, 40 bar
Turbine / alternator group
Smokes treatment Lurgui (milk of lime and bag filters)
Demin Unit (Degremont)
ALBEMARLE PPC 1998 THANN PLANT
Instructor
Preparation and realization of training activities in relation with BFC
(Bromine FineChemicals) service reorganization in order to improve the
skills of operators
TECHNIP / UFANEFTEKIM1998-1997
Supervisor
Technical assistance to Dual Forming unit (IFP) start-up with DCS Modumat
8000
TECHNIP / UZBEKNEFTEGAS 1997BUKHARA REFINERY (UZBEKISTAN) - 2.5 MT/YR
Shift Engineer
Commissioning and start-up of refining units with DCS Honeywell TDC 3000
Atmospheric distillation
Naphta HDS
Gas oils HDS
Kerosene sweeteing Merichem process
Reforming
Sulphur
ELF ANGOLA1997 OFFSHORE OIL FIELD (ANGOLA)
Supervisor
Maintenance of gas turbines turbomeca and Hispano
TECHNIQUES MODERNES DE COMBUSTION1997-1996 HOUSEHOLD WASTE INCINERATION
PLANT, DOULLENS Start-up head
Writing test and start-up procedures
Tests, commissioning and start-up
Fats HONEYWELL DCS
EGT 1996-1995 COGENERATION POWER PLANT, SOUSSE (TUNISIA)
Coordinator
Coordination of plant commissioning and reception works
Works planning preparation
Supervision of piping modification and works to comply specifications
Technical and commercial negotiations for provisional reception
Punch list clearing
STEIN INDUSTRIE 1995 HOUSEHOLD WASTE INCINERATION PLANT
Start up supervisor
Tests and start-up of the plant
Industrial running
Personnel training
Plant includes
Furnaces - 2 x 8 T/h
Boilers - 2 x 40 T/H, 38 bar
Smokes treatment LURGI
DCS FOXBORO
EGT / L'AIR LIQUIDE - ROSENBURG (THE NETHERLANDS) 1995
Start-up engineer
Test, start-up and operation of a cogeneration plant with DCS FOXBORO
Punch list clearing for provisional reception
Wiring, soft modification
Start-up
Operation personnel training on DCS FOXBORO operation
Plant includes :
2 STORK KETEL boilers
2 gas turbines EGT type 6000
Alternator ALSTHOM - 2 x 44 MW
Control-command Mark V GENERAL ELECTRIC
STEIN / NATIONAL POWER 1995-1994 THERMAL POWER PLANT, CAMBRIDGE (UK)
Commissioning and start-up engineer
In charge of boilers and water station commissioning and start-up in a
cogeneration power station
Automatisms sequences checking
Circuits preparation and verification
Instruments calibration
Start-up and tests-runs
Equipment
Boilers STEIN - 2 x 300 t/h, 120 bar, 540 C
Water treatment DEWIPLAN - 50 m3/h
Personnel training in boiler operation with DCS HARTMANN AND BRAUN
Education :
. 1985 Civil Engineer (CNAM)
Others :
. Nationality: French
. Statut: Married
. Date of birth: 03/10/1957
. Language(s) : French (Native language)- English (Fluent)- Spanish
Beginner
. Computer software: WORD, EXCEL, ACCESS, POWERPOINT, VISIO, LOTUSNOTE,
INTOOL'S, PHOTOSHOP, ILLUSTRATOR