Eng. Shehab Ahmed Kamel Abd-Elazim
Current Address: ** *********** **** ******, ******. Alger. ALGERIE
Home Address: 6th Naggib Basyouni St., St. Fatima Sq. Heliopolis, Cairo -
Egypt.
Tel.: Home: +202-***-***-**
Mobile (Rooming): +2-010-***-**-**
Mobile (Algeria): +213-***-**-**-**
Email: acax1p@r.postjobfree.com
Email: acax1p@r.postjobfree.com
Personal Information
Date of Birth: 5th September 1981.
Place of Birth: Cairo - Egypt.
Nationality: Egyptian.
Military Service Status: Exempted.
Marital Status: Married.
Education Information
High Thanaweya Amma Certificate, Graduation Grade: 91%.
School:
September 1999 : June 1999.
Salah El Din High School for Boys - State of Kuwait.
BAC BAC Degree in Engineering, Graduation Grade: Good.
Degree:
Faculty of Engineering - Electrical Power & Machine Department.
Ain Shams University. Cairo - Egypt.
September 2001 to June 2006.
Graduation Advanced Automation Topics (3D Positioning Control using PLC
Project: & SCADA System).
Graduation Project Grade: Excellent.
Work Experience
BRITISH AMERICAN TOBACCO
Engineering Manager& Site Utilities Manager
From 01/06/2012 to Present
> Job Description::
1. Plan and direct the installation, testing, operation, maintenance, and
repair of facilities and equipment.
2. Develop, analyze and improve Preventative Maintenance (PM) procedures.
3. Analyze and determine equipment failures for root causes and recommend
solutions.
4. Analyze and determine spare parts orders; control spare parts cost
effect, carry out and control spare parts inventories and measure the
effectiveness.
5. Coordinate and direct projects, making detailed plans to accomplish
goals and directing the integration of technical activities.
6. Recruit employees; assign, direct, and evaluate their work; and oversee
the development and maintenance of staff competence.
7. Prepare budgets, bids, and contracts, and direct the negotiation of
research contracts.
8. Develop and implement policies, standards and procedures for the
engineering and technical work performed in the department and service.
9. Perform administrative functions such as reviewing and writing reports,
approving expenditures, enforcing rules, and making decisions about the
purchase of materials or services.
10. Consult or negotiate with clients to prepare project specifications.
11. Reporting to The Operation's Manager
STAEM Tobacco
Electronics and Automation Factory Responsible
From 02/11/2010 to 30/05/2012
> Job Description::
Assigned to control the new installation projects related to the
Production machines (G.D lines, Filter machines, feeding system)
As a member of the factory project reception team, I was responsible to
control the installation and the reception of the utility systems by:
Verify the complete electrical installation of the BMS system which are:
Create the method of the reception and apply it with the supplier to
achieve the best results
Alerton BACtalk control system.
Communication and networking of the system.
Instrumentation testing (motorized valves, sensors, motor drivers, VLC
controllers, I/O modules.
Software testing ( confirming that the software is covering all the
points of the system and prepare all necessary procedures for
troubleshooting and diagnoses the problems)
Check the Software programming language (MS Visio) and prepare the
complete lists and backups for future necessity.
Preparing the maintenance plan and procedures for trouble shooting the
system.
The person in charge of the reception of the all the low current systems
in the factory (CCTV's. Access control system, Public phone system) by
preparing the method of the reception and verify all the system points )
Prepare the maintenance plan for the low current systems and prepare the
method of operating those systems.
Responsible of the electronic team related to the production machines by
assigning the strategy of this team:
Create a complete procedure of trouble shooting and intervention.
Prepare training on site plan for improving the skills.
Working as day to day technical assistance for supporting the production.
Watch assigned employee's tasks to ensure the service quality meets the
needs and requirements
Design electronic service calendar and assign human resources
accordingly.
Strengthen effective work environment and team work across the service.
Reporting to the technical Manager.
[pic] High Speed Making and Packing Machines
Service Engineer
Medium Speed Packer Business Unit
Electric and Electronics Testing
Installation and Servicing Team
From 01/11/2005 to 01/11/2010
G.D SPA Egyptian Agency
Via Battindarno, 91 40133 Cairo Trading Center
Bologna - Italy. 4 Hussein Ahmed Rashad St, Dokki,
Phone +39-051-******* Cairo - Egypt.
Fax +39-051-******* Phone +202-******* / 7 - 7491986
www.gi.di.it Mobile +2-012-*******
Fax +202-*******
www.ctc-sweets.com
> Job Definition: Installation, Troubleshooting and Service Engineer for
G.D Machines internationally, to work in any country world wide while
controlled technically from G.D Bologna, Italy.
> Training Courses:
Country: Izmir, Turkey.
From 22/1/2006 to 13/4/2006 and From 31/7/2006 to 15/8/2006.
Description:
. 3 months training on Packing Line containing five Machines: X3, C600,
CV, CT and AM14, with gaining a well-knowledge of the theoretical
methods of Packing Lines, Machines Wiring & Control proficiency, Shift
Register Method, Machine Steps and Distribution of Wiring.
Packing Line 5 Machines are:
o X3: Main Packing Machine.
o C600: Chellophaner Machine.
o CV: Cartonner Machine.
o CT: Over Wrapping Machine.
o Am14: Tray Loader Machine.
. Experience all G.D Machines which are working by using SIEMENS control
tools:
o PLC SIEMENS step7 400,300 and SIEMENS step5.
o IP32M Main Control Board used in SIMATIC network for SIEMENS, which
can contract with following Modules:
- Digital Input and Output Modules.
- Analog Input and Output Modules.
- Absolute Encoder Module.
- Positioning Module.
- Serial Interface Module.
- Module for Communication.
o Machine dealing components:
- Masterdrives of SIEMENS which is responsible of controlling
SIEMENS main motor.
- Input and Output Modules distributed all over the Machine to
collect the different inputs and output to be sent to the PLC.
- Semotion SIEMENS PLC to control the Non-Mechanical connect
movements with the main shaft of the Machine.
. Experience Micro_2 technology for 2 weeks.
o Description: Micro_2 technology is a special G.D PLC created by G.D
programmers; works as a Control Unit instead of SIEMENS components
to do the same function of control with a special language
(GDplus).
o Capability of dealing with hardware and software of Micro_2 with
different control card, such as:
- Main Control Board.
- Input Boards.
- Output Boards.
- Encoder Boards.
- Stepper Motor Boards.
- Analog Boards.
- Digital Boards.
> Field Experience
Client: Phillip Morris Tobacco
International.
Control System Conversion Mission
From 23/4/07 to 01/06/2007
Country: Ni?, Serbia.
Job Definition: A complete control system conversion for a tobacco
packing line made in 1990 from the old F-Z control to SIEMENS step7 400
controllers.
Achievements:
. Installing new Electrical Cabinet with new controller and entire
component:
o CPU power supply.
o PLC the controller.
o All Input / Output Analog Modules.
o Ks800 heaters controllers.
o Main inverter for the main motors of the Machines.
o Inverters for the brushless motors.
o Relays, contactors, thermocouples and the heaters cables.
o Main power cables and control cables for the cabinet to the
Machine.
o Film Centering Module.
o The main transformers to get 220 VAC for the main power parts, 40
VAC for the heaters and 24 VDC for the control.
. Replace almost all the Control Sensors (Digital Sensors, Optical
Detectors and Analog Sensors) with all the wiring jobs needed, to make
them able to run correctly, and replacing heaters, thermocouples, main
power motors and the brushless motors.
. Powerup the Machine and start the activity of fault finding, check the
direction of rotation of the main motors and all other motors (AC and
brushless), loading the parameters for the inverters, adjusting the
sensitivity and the positioning of the sensors, testing the
thermocouples and testing the heaters to avoid wrong wiring and ensure
correct positioning.
. Start running the Machine with product and start to check the software
that is working correctly by checking:
o Correct Machine phases and steps.
o Shift register for product rejection.
o Special functions of the Machine and automatic and manual
selection.
. A product with fine high quality and Machine full speed.
Client: Eastern Tobacco.
Installation of new Machine, start up and commissioning
From: June/2007 to November/2008.
Country: Cairo - Egypt.
Job Description: Installing different types of G.D Machines in this
period from X1, X2 and X3 packing Machine with a (C600, CT and CV)
Chellophaner Machines.
Client: STAEM Tobacco.
Installation of new Machine, start up and commissioning
From: 26/11/2008 to 19/01/2010
Country: Alger - Algeria.
Job Description: New Machine released by G.D named TAS20, works by new
SIEMENS controller called Simotion D. The Machine works like a cigarette
buffer but with a new automation theory and high performance controller.
Client: Eastern Tobacco.
Installation of new Machine, start up and commissioning
From 23/01/2010 until: 22/05/2010
Country: Cairo - Egypt.
Job Description: Installing and commissioning a new Machine belong to BAT
factory, Machine type X3, C600, CT, CV and Am14.
Client: Al Saied Group - Cigarette Factory as
part of the Group.
Installation of new Machine, start up and commissioning
From 24/05/2010 to 29/05/2010.
Country: Taz, Yemen.
Client: STAEM Tobacco.
Installation of new Machine, start up and commissioning
From: 06/06/2010 until: 15/07/2010
Country: Alger - Algeria.
Job Description: Installing a new Electrical modification kit, and
upgrading the software components to match new modifications.
Client: BAT Heidelberg.
Installation of new Machine, start up and commissioning
From 23/07/2010 to 02/08/2010.
Country: Heidelberg - South Africa.
Client: GLTC.
Installation of new Machine, start up and commissioning
From 03/08/2010 to 09/09/2010.
Country: Johannesburg - South Africa.
[pic]Industrial Solution and Services
Construction Field & Quantity Survey Engineer
Main contractor: Universal Hospital Services
Client: Association of the National Cancer Institute (AFNCI).
Project: Children's Oncology Hospital.
Construction Team: From 25/05/2005 to 25/10/2005
Responsibilities:
. Responsible of the half of the building systems for the Lighting
Installation, Fire Alarm, Nurse Call, Public Address, Intercom System,
Power Outlet & Socket Installation, Clock, Television, and Data &
Network System.
. Responsible of all Supervisors working in the Field.
. Responsible of preparing, reviewing and finalizing invoices according
to data collected from Field.
. Responsible of the Second Fix Installation in the Bed Tower building
for the electrical systems.
[pic]Industrial Solution and Services
Field Engineer
Main Contractor: Bechtel Overseas
Client: ELNG
Pre-Commissioning Department
From 16/10/2004 to 19/05/2005
Responsibilities:
. Preparing Electrical Equipment documents (Motors, Control Panels,
Junction Boxes, Batteries and Heaters, etc).
. Joining the NO Load Run Test for Motors Team, for checking all Motors
Control Cables and liable the NO Load Run.
. Preparing the complete documentations for the Electrical Switchgears
Tests such as (Switchgear Inspection, Bus Bar Hi-pot Test, Bus Bar
Ducting Test, Current Transformer Ratio Check, Mulit Function Relay,
Bus Duct Hi-pot Test, Bus Duct Ducting Test, Comparative Resistance
Check for both sides of Bus Duct (L.V & H.V), Circuit Breaker
Inspection Test, Voltage Transformer Ratio Check and Under & Over
Voltage Relay Check.
. Follow up the site work as Field Engineer for the Switchgear Tests to
clear the Punch List Items.
. Responsible of completing and finishing all systems after work field is
finished from pre-commissioning point of view, and handing over the
complete systems to the Main Contractor.
Trainings
Halliburton Overseas
Sample Capture Engineer - Service Drilling Department - Mud Logging Unit.
July 2000, for 1 month.
Responsibilities:
. Collecting and making dry and wet samples to be analyzed by Geologist,
in order to understand the depth of the drilling and the type of
environment during the drilling operation.
. Installing the sensor instruments for the mud level, speed of mud cycle
flow and connect it to the indicator panel.
ABB ARAB
High Voltage Section
July 2003, for 2 weeks.
Responsibilities:
Join the Factory during fabrication of Current Transformers, fabrication of
Voltage Transformers, and Primary Injection Test on C.T & V.T to ensure the
correct turns Ratio
Further Qualifications
. Very good in dealing with different kinds of:
o PLC's (SIEMENS, LG and ABB).
o Motors Drives (SIEMENS, Eurotherm, Stepper, Brushless, DC and AC).
o Encoders (Absoluter and incremental)
o Wide type of instrumentations.
o Wide type of programming software's and Automation.
. Good in dealing with MATHLAB Programming Software.
. Expert in Microsoft Office (Word, Excel, PowerPoint and Access).
. Expert in dealing and searching with Internet Explorer software.
. Computer Skills:
o Very Good Knowledge in Computer Hardware (Parts Installation)
o Very Good skills in Computer Software such as Windows with
Different Editions
. Languages: Arabic Native, Fluent English in Reading, Writing, Listing
& speaking, French understanding engineering French.
. Leisure activities: Soccer, Playing Guitar, Surfing Internet &
Reading.
Certificates are available upon request
Updated in: 01 November 2013
[pic][pic]