Mrs Sowmya S
Mobile: +91-959*******
E Mail: acawq3@r.postjobfree.com
As an Environmental Engineer, my human, academic and work formation has focused on the
development and implementation of my knowledge in the field of productivity. I describe myself as
enthusiastic, creative, quick learner, open to take up challenges, good interpersonal and communication
skills, responsible, organized and interested in professional development.
Education
Bachelors in Environmental Engineering from Sri Jayachamarajendra College of Engineering, Mysore
under Visvesvaraya Technical University during 2005-2009.
Major Expertise
Water and wastewater treatment – Design
Associate functional area expert for Air quality modeling and Air pollution control and monitoring.
Environmental Impact Assessment
Risk and Hazardous management
Site visits for EIA and wind energy projects
Making presentation to Ministry of Environment and Forest and to project stakeholders at site during
public consultation meeting.
Training
Industrial training on Environmental Management systems at AT&S, Mysore, Karnataka.
Training workshop on RO Technology and MBR technology, Bangalore, Karnataka
Young Engineers Development Program 2010, Mumbai
Lecture on PHAST 6.54 Risk analysis module DNV software professionals, Mumbai
Seminar on Solid waste management and air quality modeling, Mumbai
Seminar on Dredging, Mumbai
Software
Operating system: Windows XP
Software: ISCST3, PHAST 6.54, AutoCAD 2009, Windrose, C and C++, Basics of Watergem.
Work Experience
Employer: Tata Consulting Engineer’s Limited (TCE)
Designation: Assistant manager in Environment
Duration: July 2010 to present
Projects Handled at TCE
Sector : Water and wastewater treatment
Project Name: Bangalore Water Supply and Sewerage Project (II) (JBIC Loan)
Client: Bangalore Water Supply and Sewerage Board
Key Role: Process Engineer
• Working as Process Engineer for 11 Sewage treatment plants. The treatment technologies for various STPs
are SBR, MBR, Extended Aeration and Activated Sludge Process with and without power generation
• Process designs of Sewage Treatment Plants (STP)
• Preparation of Bid documents, Design and Cost Estimates
• Technical bid evaluation with the report preparation of STP
• Vendor drawing review
• Financial evaluation of the bids
Sector : Environmental Impact Assessment, Risk Analysis and Disaster Management plan
Key Roles:
• Form 1 and Terms of Reference
• Prefeasibility report preparation including solid waste management
• Terms of Reference presentation preparation to MOEF
• EIA report preparation
• Air quality modeling using ISCST3 model. Air Quality baseline data analysis and Impact prediction.
Isopleths generation
• Detailed Qualitative Risk assessment (Risk and Consequence Analysis)
• Disaster management plan
• Analysis of baseline data for noise, solid waste, socio economic, landuse, ecology and impact prediction.
• Air pollution monitoring baseline data analysis, preparation of windrose and stack Data analysis.
• Noise modeling and impact assessment along with Environmental Management plan.
• Site Visits for selection of Monitoring locations and collection of secondary data (Ecology, forest
departments visits, census data etc
• Preparation of Form 1 and Questionnaires and Environmental Clearance presentations. Preparation of pre-
feasibility report and Terms of reference
• Presentation to MOEF for clearance
• Coordination with client and Monitoring agency for data collection
• Client Coordination, proposal and work order preparation
Project handled on the above key roles on EIA Environmental Impact Assessment, Risk Analysis and Disaster
Management plan
1.Environmental Impact Assessment report and Risk assessment report for LPG terminal in Orissa for IOCL
Client: Indian Oil Corporation Limited
Role: Engineer
2.2X350 MW Combined cycle gas based power plant, Karimnagar, Andhra Pradesh.
Client: Elgen India Private Limited
Role: Engineer and Project Management
3. Environmental Impact Assessment of Coal to Liquid plant at Ranjagola, near Gudiyakateni, Hindol Tehsil,
Denkanal district, Orissa.
Client : Tata Sasol Joint Venture
Role: Engineer
4. 2X80 MW Thermal Power Plant, Kotre-Basantpur and Pachmo Coal project, Ramgarh,Jharkhand
Client: Tata Steel Limited
Role: Engineer
7. EIA report for proposed viscose staple fiber plant for Phase I of 80000 TPA at Patalganga
Client: Lenzing Modi group private limited
Role : Engineer
8. Comprehensive utility assessments for Godrej Properties
Client: Godrej properties
Role : Engineer
9. EIA studies for Feed Stock Conversion from Naphtha to natural gas (NG) in Ammonia Plant and Fuel from
Furnace Oil to Natural Gas in steam generating boilers and captive power plant
Client: Mangalore chemical fertilizer
Role : Engineer
Sector : Air pollution
Project Name: Up-gradation of Air pollution control equipments, Tata Steel Limited Jamshedpur
Client: Tata Steel Limited
Role: Project Engineer
• Preparation of tender specification
• Preparation of technical and commercial bid analysis report
• Preparation of techno-commercial recommendation
• Documentation and project management work
• Cost estimation
Project Name: Consulting engineering services for framing of Policy in respect of monitoring particulate emission
across industries
Client: Jameel Poverty Action Lab- South Asia
Role: Engineer and Project Management
• Pilot study on air pollution control. Air pollution control equipment selection and cost analysis for different
industries like power plant, fertilizer. Food industries using fuels like coal, bagasse, rice husk, Lignite,
Furnace
• The air pollution control equipment suggested are ESP, bag filter and cyclones
• Technical guidance report as per CPCB guidelines
Sector: Wind Energy projects
Key roles:
• Preparation of wind energy EIA report as per IFC and world bank guidelines
• Air Quality baseline data analysis and report preparation
• Site visits for secondary data collection
• Visiting sites for material and commissioning verifications
• Generating monthly progress report with material verification certificate, commissioning certificate and
disbursement certificate to financing agency.
Project handled on the above key roles on Wind Energy projects:
1. 50.4 MW wind energy project near Nallakonda Village, Anantapur district of Andhra Pradesh.
Client: CLP Group Companies
Role: Engineer
2. Lender’s engineer services for Vaayu India Power Corporation Pvt. Ltd.
Client: IDFC Limited
Role: Project Engineer
3.113.6 MW EIA of Wind Energy project near Andhra Lake, Pune District Maharashtra.
Client: CLP Group Companies
Role: Engineer
Employer: Jones lang Laselle Megharaj
Designation: Environment Engineer
Duration : January 2010 to June 2010
Job responsibilities:
• Co-ordinator for Environmental Management Systems of 6 locations of IBM
• Energy conservation and utility tracking
• Co-coordinator for building statutory compliances
• Health and Safety audits
Achievement
Completed all the exams of Dakshina Bharath Hindi Prachar Sabha, Madras, from Prathama to
Rashtrabhasha Praveen Uttarardh which is considered equivalent to MA in Hindi
Associate functional area expert for Air quality modeling and Air pollution control and monitoring from
NABET ( National Accreditation Board of Education and Training)
Personal Vitae
Date of Birth : 20-06-1987
Address : 160/1/A, Mahalasakrupa, 5th A cross, 11th Main,
Hanumanthanagar, Bangalore 560019
Languages : English, Hindi, Kannada, Tulu
I hereby declare that the above information is true to the best of my knowledge.
Date:
Place: Bangalore Sowmya S