Post Job Free
Sign in

Supervisor Barge Master

Location:
The Netherlands
Posted:
September 26, 2018

Contact this candidate

Resume:

CURRICULUM VITAE

SOFIAN MUSAT

PERSONAL DETAILS

Date of Birth: August 1979

Nationality: Romanian

Address Romania, City - Constanta, Street - Cutezatorilor no 5,

+40-724-***-*** (mobile phone)

E-mail: *****.******@*****.**

EDUCATION

> 1999 - 2004 - ' OVIDIUS ' University, Constanta

Mechanical Engineer

''Welding Equipment and Technology''

> 2002 - 2004 - ' OVIDIUS ' University, Constanta: ''Psychology''

> 2007 - certified for helideck landing officer

> 2007 - certified IMO attend survivorship to sea BASIC SAFETY TRAINING

> 2007-2009 - Degree Master : " Safety, Transport and Ship Management"

> 2012 - HELICOPTER SAFETY AND ESCAPE / BOSIET - Holland

> 2012 - authorized in natural gas transportation system with ANRNE (II T)

(NATIONAL ENERGY POWER Romania)

WORK EXPERIENCE

BARGE ENGINEER FROM SAIPEM (at barges Castoro XI, S44 and S600) -

2012 - prezent

> Job responsibilities:

Maintenance activities of rotating equipment (engines, pumps,

compressors, winch, mooring system), static equipment, machinery and

hydraulic equipment, pneumatic systems and equipment, electrical

equipment and system, ballasting and de-ballasting operations,

supervision of repairs and install new equipment, collaboration with the

customer, providing solutions. Maintaining stability of the barge;

Supervision of lifting and bunkering activities.

SUPERVISOR &MECHANICAL ENGINEER MAINTENACE OFFSHORE RIG- PLATFORM - FROM

RIG SERVICE . SA ROMANIA Jan. 2002- 2012.

> Mechanical offshore to platform Gloria, Central from OMV PETRM,

Orizont, Fortuna(Oriental 1), Atlas, Saturn, Jupiter, Prometeu (2002-

2004)

> Safety Officer to the platform Gloria OMV PETROM (2004 - 2 months )

> Safety Officer to the platform Central OMV PETROM (2004 -2 months)

> Chief Mechanical and Supervisor by platform Gloria OMV PETROM, Orizint

and Fortuna (2004 - 6 months)

> Chief Mechanical Engineer Maintenances Supervisor and Assistant Barge

Engineer by platform Gloria OMV PETROM Atlas, Fortuna, Orizont, Saturn,

Atlas (2004-2012)

> Repair and Overhaul Manager; Maintaining stability of drilling

platform; Supervision of lifting and bunkering activities.

> Specialized expertise within the Offshore Team, promote and co-ordinate

activities related to oil & gas production, machinery, valves, pipelines,

cranes, pumps for maintenance and operations, including preservation

activities, preparation of maintenance and inspection plan and spare

parts selection. My work place it was in Black Sea for OMV Petrom

and Persian Gulf. .

Resume work Experience 11 years

> 9 years experiences at Chief Mechanical, Supervisor Mechanic

Maintenances in offshore activity, to jack up drilling platform with

4 legs

> 1 year barge engineer to heavy lift barge

> 8 years assistant barge engineer during the move operations

> 2 year experiences at offshore mechanical to jack up drilling platform

> involved in project to overhaul ( Gloria) jack up drilling platform

Personal skills and competences

> knowledgeable with heavy equipment, rotation equipment, static equipment, automotive, hydraulics equipment and installation, welding procedure

and equipment.

> knowledge of preventive, predictive and corrective and diagnostic

maintenance techniques;

> experience in Offshore static equipment, rotating machinery,

troubleshooting techniques,

> Responsible for performing diagnostic tests, and troubleshooting system

faults and failures, of mechanical equipment onboard the rig including

but not limited to;

> knowledge of local and international codes and regulations regarding

mechanical systems and equipment

> good knowledge of ASME and API code

> capacity to work hard and dedicated to work;

> communication abilities at any level and with different nationalities and

cultures;

> organizational capacity, working team spirit and working abilities in any

medium with answers and solutions requested;

> good knowledge of technical plans and drawings for execution and location

> management of contractors and vendors;

> knowledge of Condition monitoring techniques

> significant experience in Oil & Gas plants Design and Operation

Technical skills and competences

> Engine ( LDSR ; CATERPILLAR 3512; CATERPILLAR 3304; YANMAR; DETROIT;

CUMMINS 4BTA 3.9); Crane LINK BELT: Generator fresh water ALFA LAVAL;

Vacuum system and osmosis generator Type SELMAR.; Gas compressor VPT

(Siemens & Howden Tamasson); Mud pump ( UPETROM 2 PN 1600; Garden Denver)

; ACF pump for injection ; Air compressor (INGERSOLL RAND; Garden

Denver); Oil pump with armature ex. pump REDA and divers pump for

transfer oil MET 80.

Ballast pumps differed type of pumps, Gear pump ; Pump with pistons

Hammelmann for injection sea water; Generator steam ; Fuel separator

Alfa Laval; Vertical and horizontal pumps Grundfos; Air conditioning

compressor Bitzer; Drilling tower TFM 38 ; Top drive system VARCO;

Geamlac GFM 400; Drilling winch 5- 35 - 400 Q work =320tf; Rotary table

drilling - MRL 375

> Prevention system equipped for drilling GPGU 140 bar; Electromagnetic

brake ELMAGO; Pneumatic winch (INGERSOLL RAND TP 5000; 3000;1500) ;

Sewage system treatment ORCA IIA- 330; Drilling machine MG 40, lathe

SPF 1500 P; Fixed grinding stone ; High pressure pump with pallets 2000

PSI ; Metering pumps ; Oil separator, three phase, dual; Bilge

separator Manager; Manual and power tongs, slips ; Accumulator unit

; Jacking and Skidding equipment; Pumps including fire-water, foam

systems, water tower and compressors ; Hydraulic systems and pneumatic ;

Pipe handling units ; Lifeboat systems ; Cranes, winches, hoists, Boom

lifts (Cherry pickers) etc.; Workshop machinery knowledge on drilling,

grinding machines, Lathes etc.Machinery alignment skills; Remote control

operation of ballast system with draft and tank ; Level gauging;

Mooring system

10 tons hydraulic anchor winch; storage capacity drum 1,000 m x 51 mm

diameter wire rope;

2 hydraulic mooring winches; storage capacity drum 1,000 m x 38 mm diameter

wire rope.

1 hydraulic mooring winch for towline; storage capacity drum 100 m x 32 mm

diameter wire rope.; 1 bridle chain of main towing line suitable for a tug

pull of 200 tons

ABILITIES

Language English

Understanding Speaking Writing

Listening Reading Spoken Spoken

interaction production

GOOD GOOD GOOD GOOD GOOD

Computer Knowledge:

> Windows 2010XP, Microsoft Word, Microsoft Excel, Microsoft Outlook,

AutoCAD, Internet Explorer;



Contact this candidate