Post Job Free

Resume

Sign in

Power Plant Electrical

Location:
Jamshedpur, JH, India
Posted:
November 13, 2013

Contact this candidate

Resume:

Mohammad Sarfaraz Nawaz

Mobile: +918*********,+919********* E-Mail: acaw9k@r.postjobfree.com

Aiming for challenging assignments in testing commissioning & Maintenance

with an organization of high repute

An Overview

Career Record

WORK EXPERIENCE :( Abroad)

Worked with AL FANAR co.at Riyadh in Saudi Arabia as an Electrical

Supervisor from July 2009 to May 2013

. Worked in QATAR for QATALUM project (Qatar aluminium) for 3 months.

Commissioning works.

. Worked in JORDAN for AL -RAJHI cement plant substation testing.

> Currently working in SAUDI ARAMCO project (SATORP-Saudi Aramco total

refinery project) in JERP (Jubail export refinery project) with

TECHNIP CO. for commissioning of substations.

> Commissioning of HAIL central power plant extension 4x80MW unit each.

> POWER PLANT PP-10(RIYADH)-s/s 380/110Kv

> Shamiah-1(Makkah) 132/13.8Kv (ABB project).

> POWER PLANT-5 Hiteen (Riyadh) s/s#9005Bsp (PP5) 380/132Kv.

WORK EXPERIENCE :( INDIA)

(FROM 15TH October 2007 TO 5 TH June 2009)

Worked AS a JUNIOR ENGINEER in SANDVIK ASIA Limited, a Sweden based MNC co.

Pune.

Chief Tasks Handled

o Circuits development & finding faults &modifications as per prescribed

standards Used in international countries

o Carry out preventive maintenance activities based on Maximum work orders,

and carry out skilled maintenance, repair and testing of electrical

equipment.

o Maintenance and trouble shooting of medium, Low & High voltage electrical

equipment

o Managing the functions of troubleshooting and predictive / preventive /

shutdown maintenance for reducing machinery downtime to minimum.

o Responsibility of shift in charge during the shift.

o Executing cost saving techniques / measures and modifications to achieve

substantial reduction in expenditures and to increase operational profit.

o Undertaking regular inspections in order to prevent accidents and ensure

adherence to safety norms.

o Analysing existing processes / procedures and conducting critical

analysis for finding out shortcomings and suggesting improvements

measures.

Significant Contributions

> On hand experience of testing, maintenance & trouble shooting of

electrical systems such as excitation system, starting Equipment,

Protection system,Generator, Transformer, Battery, Battery chargers,

Inverter, Motors, HV/LV switchgears etc.

> Erection, Testing, Commissioning & maintenance of all HT & LT

electrical equipment related to CHP from the very beginning of

project to the end of Performance Guarantee Test,

> Excellent Supervisory experience, including setting goals and

objectives, project development, planning and organization, budget

monitoring and cost control.

> Commissioning of Circuit Breakers (Siemens, Areva & Marlin Gerin, ABB

and ALFANAR), illumination and Ventilation system etc.

> Erection, Testing, Commissioning of 110, 132, 23 and 380kV GIS

(Hyundai, ABB, Areva, Hyosung)

> 13.8 KV (HT) Switchgear Panel (Areva, ABB, Schneider, Siemens and

ALFANAR Make).

> Testing of CT, PT, HV cable etc.

> Testing, commissioning and maintenance of 50/67 MVA (ABB, Hyundai,

Areva and Hyosung) power transformers.

> Testing of 13.8kV switchgear, 13.8 kV switchgear Breaker timing,

contact resistance insulation resistance test,CT, VT, MCB, Ammeter,

Voltmeter etc.

> Testing of ACDB / DCDB and Testing of MV cable

> Testing of power transformer :- Transformer Turns Ratio, Magnetizing

current, Short circuit current, Zero sequence impedance, Vector group,

Magnetic balance, single phase impedance etc. Winding Resistance,

Temperature Calibration, Secondary injection, Fan Test Insulation

Resistance, Tan delta.

> Testing of HV for GIS of 132kV with High volt kit.

> Installation of panels, electronic sensors, & electrical device such

as MDB, DB, rectifiers, Inverter, converter, relays, ELCB, MCB etc.

used as per requirement.

> Analyzing faults in electrical systems based on event and alarm signal

received; conversant with preventive, predictive, predictive Breakdown

& Major Overhauling maintenance of electrical equipment. Daily work

site inspection, preparing work progress report and reporting to

Concerned with seniors.

> Function and scheme check for transformer, Function check of

marshalling box, Function check of OLTC and Function check of

mechanical supervisory devices.

> Able to Monitoring, Controlling & Logic making of Allen Bradley (PLC-

5, SLC-500) make PLC system. Also in ABB PLC (KT-51)

> Knowledge of Severker760 and Freja 300(relay testing units), Megger,

primary Injection kit(oden).Cpc-100,CT Analyzer HI-VOLT kit, Sf6

pressure gauge testing with dilo testing set, and also measuring

instruments MULTIMETER, Clamp meter, contact resistance, ohmmeter,

5kV&10kV Megger, oil breakdown.

> Commissioning and testing of all the process instruments like

Thermocouple, Temperature controller, Transducer & Transmitter, Flow

meter, Proxy Switch. Commissioning and Testing of Electrical

installations and Control system. Operation and Maintenance

> Worked for maintenance of substation and also as a part of testing and

commissioning division .Investigate problems and recommend solutions.

Installation and testing of Power plant and Sub Station Equipment's.

Scholastics

o Diploma in Electrical Engineering from AL-Kabir Polytechnic, Jamshedpur

with 76.73% marks in 2007.

o Matriculation from Andhra association English school, Jamshedpur with 66%

marks in 2003.

o PLC and drives training.

IT Skills

COMPUTER SKILLS:

o Programs: Microsoft Word, Excel, Power Point, Outlook.

o Platforms: Internet, Windows Vista/XP/2000/2003/2008/Windows7.

[pic]

ACADMIC PROJECTS:

Title : Study of lead acid 12v battery

Duration : Six Month (Diploma)

VOCATIONAL TRAINING:

Company : SUBERN REKHA HYDEL POWER PROJECT, 65 x 2 MW

power plants

Duration : Three month (Diploma)

Personal Dossier

[pic]

Date of Birth : 9th October 1986

Languages known : English, Hindi, Urdu, Arabic

Nationality : Indian.

Marital Status : Single.

Permanent Address: Road no: 4, H.no: 22/B, Rani Kuder, kadma

Jamshedpur

-831005, Jharkhand, INDIA

Mobile No. : +91-829*******

: +91-990*******

Email id: - acaw9k@r.postjobfree.com

: -acaw9k@r.postjobfree.com

Skype id:-sarfaraznawaz20

Passport Detail:

Passport No. : G 8874455 Date of Issue : 22/ 09 /

2008

Place of Issue : Ranchi Date of Expiry : 21 / 09 /

(Jharkhand) 2018

DECLARATION:

I do hereby declare that the above stated information's are true and

correct to the best of my knowledge and belief.

Dated: -

Yours faithfully,

MOHAMMAD SARFARAZ NAWAZ

< Competent professional with" 6 years "of rich experience in Testing &

commissioning, Operations & Maintenance.

< Rich experience in Testing, Commissioning, Maintenance of HT & LT

ELECTRICAL panels, CTs and PTs, Miniature circuit breakers, Auxiliary

relays, MCCBs and Breakers. Prechecking & Function test of panels of

switch gear, control room panels,G.I.S (L.c.c) panels with acquainted

knowledge of SAS (s/s automation system) Also hands on experience in

gassing and degassing of GIs compartments. Able to Monitoring,

Controlling & Logic making of Allen Bradley (PLC-5, SLC-500) make PLC

system. Also in ABB PLC (KT-51)

< Resourceful at strategizing techniques for maximum utilization of

manpower / instruments.

< Skillful in enhancing systems to bring greater cost efficiency and energy

reductions.

< Foreseeing performance bottlenecks and taking corrective measures to

avoid the same.

< An effective communicator with excellent relationship management skills

and strong analytical, leadership, decision-making, problem solving &

organizational abilities.



Contact this candidate