Résumé
Bilind “Bill” Armaghani, M.S.C.E, P.E.
Senior Geotechnical Project Manger
A competent engineer with over 33 years of diverse experience in the field of civil engineering, with
emphasis in the areas of Geotechnical and HDD, Quality Control, Material Testing, and Business
Development
EDUCATION
M.S.C.E., Geotechnical/Environmental Engineering, University of Florida, 1993.
M.S.C.E., Structural Engineering, University of Technology, Baghdad, 1987.
B.S.C.E., Civil Engineering, University of Baghdad, 1980.
REGISTRATION
Registered Professional Engineer, State of Florida.
Registered Professional Engineer, State of Georgia.
Registered Professional Engineer, State of Alabama.
PROFESSIONAL SKILLS
Over the years, managed and provided technical services and design recommendations for
thousands of projects for the State, County, City, and Private Sector in the areas of Geotechnical
Engineering. Specifically, Foundation, HDD, Earth Retaining Structures in addition to Construction
Material Testing and Quality Control.
Broad experience in management, marketing and business development on and cultivating clients’
relationships.
Solid work ethic and excellent communication and interpersonal skills.
Provided leadership, direction and mentoring to staff engineers to include peer review of
geotechnical reports and analyses to build a high level of team performance.
Provided technical consultants to assist contractors in resolving geotechnical and constr uction
problems and assisted prime consultants in developing technical specifications to what is related to
geotechnical and quality control.
AREA OF EXPERTISE
Shallow Foundation Design, to include Bearing Capacity, Settlement Analysis.
Deep Foundation Design, to include Driven Piles, Drilled Shafts and Auger Cast.
Driven Piles Design based on Dynamic Measurements & Analysis (PDA).
Drilled Shaft Design Based on Statnamic and Osterburg.
Earth Retaining Structures Design, to include Concrete Retaining Walls, Proprietary (MSE)
Walls, Sheet Piles, Soldier Pile Walls and Secant Walls. Geogrid Reinforced Earth Slope..
Slope Stability Analysis.
Problematic Soil Evaluation and Mitigation.
Soil Improvement Techniques.
Flexible and Rigid Pavement Evaluation and Design.
Geotechnical Laboratory Testing and Site Soil Exploration.
Material Testing and Quality Control and Assurance for Earth Work and Material
Construction.
Forensic Engineering, in the area of Mining Subsidence, Pavement deterioration, and Foundation
distresses.
Pipeline Engineering Construction to include specifically the Horizontal Directional Drilling (HDD)
and Push and Bore method of drilling.
Bill Armaghani, PE Cell: 850-***-****
*************@*****.***
. 2
EMPLOYMENT HISTOR
12/2012 to Date Senior Project Manager, Director Business Development of
Marino Eng. Assoc. Inc. (Urbana, Illinois)
12/2010 – 12/2012 Sr. Geotechnical Project Manager, Exp. Previously Trow Engineering
(Tallahassee, FL& Vancouver BC)
02/2010 -11/2010 Sr. Geotechnical Manager and Contractor
Set Square LLC (Euless, Texas) Self Employed, Overseas
04/2009 - 01/2010 Principal Engineer, Area Manager (Tallahassee, Jacksonville)
Nodarse & Associates Inc.Teracon company (Jacksonville, FL)
07/1995 - 02/2009 Geotechnical, Environmental & Drilling Department Manager
Ardaman & Assoc. Inc., Tetra Tech Company. (Tallahassee, FL)
01/1994 - 07/1995 Project Manager
PSI, Inc. (Jacksonville,, FL)
08/1992 - 12/1993 Teaching Assistant
University of Florida (Gainesville, FL)
01/1986 - 04/1992 Senior Structural Engineer /Project Manager
Dorsh Consult (Baghdad, Iraq)
07/1981- 12/1985 Structural Engineer
Industrogradnja Construction Co. (Baghdad, Iraq)
AREA OF RESPONSIBILITIES
Business promotion and cultivating clients’ relationships.
Managing task orders and projects. Specifically, preparing bids, proposals and invoices. Moreover,
monitoring job progress, performance, and submitting project status reports to the branch manager,
and/or regional manager.
Serving as technical lead for teams performing engineering site investigation and analyses.
Specifically, assisting project engineers and project managers with management of geotechnical
projects, in addition to reports’ peer review.
Performing analysis and preparation of reports and specifications for more complicated and
challenging geotechnical problems.
Providing technical consultants to assist contractors in resolving geotechnical and construction
problems and assisting prime consultants in developing technical specifications to what is related to
geotechnical and quality control.
PROJECTS EXPERIENCE
Below is a select partial list of large civil and geotechnical engineering projects, where geotechnical
and foundation design analysis were provided to include engineering, construction and quality control
recommendations:
SR 8 (I-10) bridge over Escambia Bay. replacement (Design Built)
This was a $210 million design built project. It consisted of the construction of a new 2.5 mile I-10
bridge over Escambia Bay to replace the one damaged by the Ivan hurricane.
I-95 South Widening, Jacksonville FL; Foundation Design of 7 Bridges over I-95 founded on
Drilled Shaft, Concrete and H-Steel Driven Piles ($1.1 million worth of Geotechnical work).
I-10 Widening, Leon County, FL; The project included providing geotechnical and foundation
design recommendations for 6 bridges founded on Concrete Driven Piles and all related retaining
structures, ponds and 12 miles of roadway widening ($1.3 million worth of geotechnical work).
Cervantes Bridge over I-110, Pensacola, FL; the project included Drilled Shaft Foundation
Design, FDOT–D3.
Bill Armaghani, PE Cell: 850-***-****
*************@*****.***
. 3
Scour evaluation of 87 bridges of unknown foundation, N. Florida, FDOT–D3 ($1.6 million
worth of geotechnical work).
(PDA test) for pile foundations in Blountstown, FL; 2 Bridges along SR20; Pile driving analysis
per Wave Equation Theory, Piles production lengths and pile driving criteria. recommendations
US-98 widening, Gulf County, FL; design of one ridge, road way base layers, earth retaining
structures and ponds, ($0.6 million worth of geotechnical work), St. Joe Company.
Foundation design of a total of 16 structures buildings at Florida State University campus; to
include School of Medicine, Parking Garage # 2,3,4 and 5, Psychology Building,, Chemistry
Building,, Dick Houser Stadium Expansion, Montgomery Gym, aquatic center and others.
Geotechnical design of commercial and development projects; to include, Hotels, Banks,
Apartment Complexes, Department Stores, Big developments; such as Wal-Mart, Target, Lowe’s,
Walgreen, and Tallahassee Shopping Malls.
I-10/Thomasville Rd. MSE retaining wall design, Tallahassee, FL; 40 ft. high reinforced wall,.
Jenks Av., Panama City, FL; evaluation and recommendations for problematic organic soil
conditions.
Subsoil Improvement using Surcharging Technique; Apalachicola Potable Water Project.
South Wood and Wind Mark Village Development, St. Joe Company, Tallahassee, FL The
project included hundreds of residential units, roadways, a bank, a school and commercial
buildings).
Geotechnical evaluation and pavement design; Mission Road. Leon County, FL.
Sinkhole evaluation at SR 263, Leon County, FL.
Concrete Mix Design for Snead Weigh Station Pavement, Madison County.
The Keystone XL Project (Client, Trans Canada); preparing in house geotechnical reports in
addition to peer review of subcontractors’ reports for site soil conditions where Horizontal
Directional Drill (HDD) will be performed in addition to preparing specifications for proposed
(HDD) process. The $7 billion Project is a proposed pipeline system to transport crude oil from
Hardisty Alberta, Canada to Nederland, Texas, with an extension to either Houston, Texas, or
Texas City,
Alaska Pipeline Project – Yukon Territory, Canada (Client, Trans Canada; Subcontractor EBA)
Provided geotechnical peer review and quality assurance for “SBD” and Koidern soil testing
program for 30 discrete sites.
COP – Horizontal Directional Drill (HDD) – Grand Lake Crossing; (Client, Conoco Phillips)
Provided project management, technical review and prepared specifications for proposes Horizontal
Directional Drill (HDD) in Oklahoma.
Apasha-Kutaisi Pipeline –Republic of Georgia: (Client, US-AID/US Department of State), Senior
project manager, checking specification and peer reviewer and quality assurance at the job site. The
$1.5 million project consisted of 30.2 Km new gas pipeline construction to include 2 HDD and one
push and bore.
ACADEMIC EXPERIENCE
A well-regarded Adjunct Lecturer at Florida State University, The College of Engineering, teaching
Foundation Engineering & Geotechnical Design courses from 2005 to 2011.
PUBLICATIONS
McVay, M.; Armaghani B., Casper R., "Design and Construction of Auger-Cast Piles in Florida"
Transportation Research Record, 1447, National Research Council Washington D.C., Oct. 1994.
Marino, G.G., Armaghani, B. and Gautam, B. 2013, “Stability Analyses and Remediation of Two
Mined-Out Coal Seams Adjacent to a Building,,32nd International Conference on Ground Control
in Mining, July 30 – August 1, 2013, Morgantown, West Virginia.
Bill Armaghani, PE Cell: 850-***-****
*************@*****.***
. 4
Marino Gennaro, Ph.D.; Armaghani B., "Evaluation of As-Built Airfield Hangar Slab Capacity
under Wide Body Aircraft” published in EJGE, Vol. 18[2013]/ Bund.G, as Paper 2013.115.
Marino Gennaro, Ph.D.; Armaghani B., M.S.C.E.; “Mine Stability and Subsidence of a Retirement
facility” (Under Publication)
Marino Gennaro, Ph.D.; Armaghani B., M.S.C.E.; “Group Behavior of a Deep Foundation in
Swelling Rock” (Under Publication)
PROFESSIONAL AFFILIATIONS
American Society of Civil Engineers (ASCE).
Florida Engineering Society (FES)
Transportation Research Board (TRB)
National Society of Professional Engineer
National Council of Examiners for Engineering and Surveyin g certified (NCEES)
REFERENCES
References shall be provided upon request.
Bill Armaghani, PE Cell: 850-***-****
*************@*****.***