Post Job Free
Sign in

Project Manager Engineer

Location:
Tracy, CA
Posted:
November 11, 2013

Contact this candidate

Resume:

NAME: Enrico (Eric) Macatangay

ROLE: Construction Manager

EDUCATION:

****-**** ********- **** ****** Of Aeronautics

Aircraft Maintenance Engineering

Domestic Rd. Pasay City Philippines

1988-1992 Tertiary- Air Link Int’l Aviation School

B.S Civil Aviation Major In Flying

Domestic Rd. Pasay City Philippines

1992-1996 Tertiary- Air Link Int’l Aviation School

B.S Aerospace Engineering

Domestic Rd. Pasay City Philippines

SKILLS:

5+ years Construction Management and 10+ years as a Wireless telecom professional with strong industry

experience in various capacities.

Experienced with Microwave,AAV, OSP, UMTS, LTE, Quality control, vendor management along with Engineering,

receiving, researching, tracking project milestones and deadlines.

Experience in investigation, scope and resolving management issues to resolution on existing sites.

PROFESSIONAL EXPERIENCE:

Implementation Manager

Ericsson/ Multipoint Resources

Microwave Cellone Project

Arizona U.S .A

Sept 1 2013- Oct 1 2013

Coordinates with the Ericsson Project/ Construction Manager and the all contractors involved in the

project.

Daily monitoring of all the cell site which is under construction and gather all the daily report for an

update.

Responsible for the daily report or update of the on-going construction sites and the number of all

completed site with the spread sheet tracker details and information.

Responsible for the reviews of all submitted Pre-Post photos that needed on the Close Out Package

(C.O.P) of New Build Cellsite

Responsible for the reviews of all the safety requirements (JSF,Osha and City Safety Rules) before starting

the construction.

Responsible for the Approval and Dis- Approval of all submitted pre-post photos on the Ericsson Site

Handler with the proper coordination on the clients agreed Method of Procedure of the project.

Construction Manager

3Snetwork Inc. (Employer)

Ericsson/T-Mobile Project (Contractor)

Livermore, CA, 94551

10/2010 to 04/2013

Manage sites and interface with other Ericsson PM/CM for all sites needing a site walk or validation and take a list

for all the scopes of works and put it on a tracker.

Manage Construction and interface with other Ericsson PM/CM for the schedule of site construction and

documents needed on site (Building Permit, LL Permission, Electrical Permits with knowledge on International

Electric code or Notional Electric rules and regulation),

Management duties responsible for the escalation of issues to the clients regarding Access, Deliveries and Site

Situation Issues. Dispatch proper vendors to resolve issue.

Manage the billings to the clients in reference of Nor Air/Ad Matrix system (Confidential) and place it to the spread

sheet and submit it to the assigned client Project Managers.

Manage approval and follow up of all P.O’s and C.O’s according to the completed sites.

Management Accomplishments: on Ericsson T-Mobile Construction and EF&I Project 2010-2013

Complete management of manpower working on site and make sure that safety procedures are applied during the

site constructions.

Manage and reviews the Pre-Post C.O.P (photos and documents) before upload it to the Site Handler and will wait

for the approval of the client Project Manager.

PM duties which included providing daily reports and updates on trackers for the daily completion of works.

This position required strong problem solving and solid knowledge of industry practices.

Verify the RFDS design for the application of Azimuth and mechanical tilting if subject to change according to scope

of work.

Manage and schedule the manpower/General contractors according to their expertise regarding on scope of work.

Perform site visits on field for Quality Audit issue’s and verification of works according to the client MOPS and

Quality Standard.

Responsible for the P.O.R (Purchase Order Request) after the site walk and including the change order after the

construction.

Responsible for the heavy equipment rental and special tools needed for the site construction.

Completed of Ericsson T-Mobile Modernization Project 2012 -2013

Completed the UMTS 2nd Carrier Installation, Integration and Commissioning for Ericsson

T- Mobile N.Cal and Sacramento Market Project ahead of time frame with the Excellent

remarks from Ericsson CPM's/CM's for T-Mobile Project.

Completed the Alcatel 7705 router for Ericsson T-Mobile N.Cal and Sacramento Market Project ahead on the

target date with high appreciation from the client. (Ericsson/T-Mobile)

Project Consultant/RBS Engineer

Wavsy’s Staffing Resources (Employer)

T-Mobile (Contractor)

Massachusetts Project/Fiber to the Node B/ETTCS

04/2010 to 08/2010

Upgrade the BTS 2106,2206,3106,3206,3308 From T1 copper cable to T1 fiber optic

cable. Install and monitor Fiber Optic Equipment provided by At&t (Sienna) with proper coordination on the

National Operation Center (NOC) and the Switch technical support.

Prepare all the BTS Cabinets for cut over on Fiber Optic Cable T1.

Allocate and install ETM_FX board on UMTS Cabinet 3106/3206 with proper checking for configuration, integration

and ready for cut over,

Proper Coordination with T1’s switch support for the test of T1's by using the T-BERD 2310 equipment. T1’ s

testing for 2106/GSM,3106/UMTS( Outdoor site) and 3206/UMTS (indoor site) Run new CAT 5 cables between

AAV equipment and all the cabinets 2G/3G.

Provide power for AAV equipment

Install Ethernet equipment

Run new CAT6 cable between Ethernet equipment and vendor’s AAV equipment.

Frequency calibration/Sweep test by using Anritsu Site Master.

Check for the alarms on the site and do some trouble shooting for the alarm removal.

Frequency calibration/Sweep test by using Anritsu Site Master.

JDSU NID equipment troubleshooting with proper coordination in DDS switch

Make a daily works report using Microsoft Office PowerPoint, Microsoft office word and Microsoft office excel.

Quality Auditor for New Wireless Project

AT&T/Ericsson (Contractor)

North California/Bay Area Project

12/2009 to 04/2010

Quality site audit for all the Wireless Contractors, Project Proposal for additional 3rd Carrier AT&t UMTS Project.

This position required strong problem solving and solid knowledge of industry practices.

Project managed, reviewed and made the approval of all the Surveys, CAD drawings and Scope of works.

Manage and Verify all the Bay Area Wireless Contractors and documentation submitted such as: CAD drawings

and documents regarding the A/C-D/C power distribution data, Rectifiers, Battery Back-up data, Alarm and T1

connection data, Hatch plate and grounding data,E-911 Equipment data, Antenna Specification with RFDS for old

and new proposal sites.

Manage, verified and made an approval for all the Photos and CAD drawings submitted by General Contractors

according to the checklist of Ericsson for AT&t 3rd carrier UMTS Project.

Manage and verify Wireless Tower Details including the RAD Heights and the Azimuths of all Antenna Sectors.

Verify building layout with At&t provided drawing, coordinates with GPS.

Verify the DC power plant capacity, breaker layout and capacity, rectifier layout, shelf capacity and capacity of

cabinet for growth.

Verify existing BBU, sizing and capacity for up to 4 hours back up

Verify all Telco lines, DSX panel size and capacity, line surge protectors.

Verify all site antenna jumpers, hatch plate use and capacity

Verify HVAC with make model and serial number

Verify generator plug and layout, verify the safety equipment.

Verify site access and any issues

Make an approval if the requirements on the checklist will meet by the Vendors and Submit it to Ericsson for final

approval.

Project Consultant Engineer

Wavsy’s (Employer)

Ericsson/Exi Parsons (contractor)

AT&T Rogers Project

Toronto,Canada

10/ 2009 to 12/2009

Ericson Project for AT&T 2G/3G UMTS/ 2nd Additional Carrier

IP MIgration and IP to ATM Migration.

Technical Support for Ericson Engineers for IP Reparenting RBS/UMTS 3106/3206

IP Convertion/Migration/Reparenting for 2nd Carrier Add RBS 3106/3206

Loading of updating scripts for 2nd Carrier RBS/UMTS 3106/3206.

Allocation of IP Board (ET-MFX)

Installation of Additional TX, RAX AND IP BOARD(ET-FMX11) with proper

Coordination in RDC Mexico and Montreal

Radio Frequency calibration/Sweep test by using Anritsu Site Master

Pre - Post print screen of Alarms, Equipments, Cv's,Upgrade Package for the daily job

reports purposes.

Pre - Post pictures of the site and equipments.

Installation of 2nd carrier add, FU’S,RU’S, PSU and Load the basic scripts

Make a daily works report using Microsoft Office PowerPoint, Microsoft office word and

Microsoft office excel

PROJECT CONSTRUCTION SUPERVISOR (contractor)

Infro Solutions (Employer)

Exi Parsons/Ericsson (Contractor)

T-Mobile/Project

North California/Bay Area Project

08/2009 to 10/2009

Oversaw and engineered the installation, integration and commissioning of Ericson Project for T-Mobile RBS

2308/2111/2102/2106/3106 2G/3G (GSM/UMTS)

Managed technicians performing Installation/Commissioning/Integration and Testing of RBS

2308/2111/2102/2106/3106 2G/3G (GSM/UMTS)

Managed project Installation/Testing of E-911 Equipment (LMU) on RBS

2308/2111/2102/2106/3106 2G/3G

(GSM/UMTS)

PSAP Call test. Verify and Data Test after the Integration of all the sites.

Loading and updating of scripts for 2nd Carrier RBS 3106/3206

Proper Coordination to the Bridge and NIC

Oversaw Installation of Auxiliary Power Unit for LMU with proper commissioning on

Cables for MCPA, RBS and GPS Antenna

Power up the MCPA, RBS and the LMU

Check T1 connection using T-Bird T-1 tester and cascade it to RBS and LMU

Pre- Post of Pictures and activities on site for Daily Report Purpose.

As a Supervisor, responsible for making a daily works report using Microsoft Office PowerPoint, Microsoft office

word and Microsoft office excel.

BTS ENGINEER (RT2/ RTU2) For AT&T 2G/3G

AFL (Employer)

AT&T Project (contractor)

Additional 2ND CARRIER UMTS PROJECT

Northern and Western California.

09/2008- 08/2009

Ericson Project for AT&T 2G/3G UMTS/ 2nd Additional Carrier

Installer/Integration/Trouble Shooter/Tester of UMTS RBS Equipment

3G/3106/3206/,3018(COMB0)

Installation of Additional FU’S, RU'S,PSU,RAX AND TX Board.

Loading of RNC Script for the upgrade and modify of GSM/1900 with combination of

UMTS/3G/850/1900

Integrate the site with proper coordination on National Integration Center "NIC" in Dallas Texas and

make a correction on the RNC Script if some error will occur.

Make a test call and speed test on every sector of the Cell sites and trouble shoot it if site will failed to meet the

specific requirements to make the site working.

PSAP, W-911 Driving Call Test on every site that is completed.

Proper coordination in Log in and Log out on Bridge Switch and Ericson Project Manager

Make sure that Daily Job Reports and Daily Work Order was submitted to the project manager or team leads

after the completion of the everyday jobs.

BTS ENGINEER (RT2/ RTU2 FOR ERICSON / UMTS T-MOBILE PROJEC)

Infro Solution (Employer)

T-Mobile Project in Northern California(Bay Area)

06/2008-09/2008

Installer/Integration/Tester of UMTS RBS Equipment 3G/3106/3206/3308(MICROCELL),3018(COMB0)

T1-Installations and troubleshooting from NIU to Cab with proper coordination of NIC Database Switch in Dallas

Texas.

Proper coordination in Log in and Log out on Bridge Switch and Ericson Project Managers

Quality Auditing (QA) of all UMTS Cabinet with complete checklist and pictures and check all the software

programs if properly updated.

Make a Daily Job Trackers Report for the work accomplishment including pictures of some issues

on site every day.

PSAP W911 DRIVING CALL TEST

Installation/Commissioning of PBC-6500 24/48 DC VOLTS Power Battery backup for Cell site.

Make a daily works report using Microsoft Office PowerPoint, Microsoft office word and Microsoft office excel.

OSP Design Engineer (Outside Plant Engineer)

Datalogix/Versacom (Employer)

AT&T San Ramon, CA (contractor)

05/2007 - 06/2008

Completed the training in Auto Cad, VRAD location survey and F2 conditioning provided by Versacom.

Completed the training in F2 Conditioning provided by AT&T.

Completed the ARES PLR/Design & Work print & Aotl Training from AT&T.

Completed the JAM training provided by AT&T

SLI trained by AT&T

P-committing of pairs thru FEI database

Final design of f2 conditioning job in ARES works print. (BT removal, RA, XD)

BTS Engineer (Certified RT2 and RTU2 UMTS Ericson RBS Equipment)

Infro Solution/TNS (Employer)

Ericsson/Nokia Project (contractor)

Bay Area, CA

01/2005-04/2007

Three years and six months extensive experienced on Telecommunication industry

Specialize in Project Development, Site Survey, Installation, Testing, O&M and Network Integration of Ericson RBS

GSM 2106/2206 UMTS 3G/3106/3018/3308(microcell)/3206.

Editing and trouble-shoot some Data Script for UMTS Cab.

T1 installation, testing and troubleshooting with coordination of T1 switch from Database

Installer/Regroom/Tester of TDMA RBS 884/882 SITES in AWS/Cingular Projects in Northern California

Site engineering preparation and installation with provision of data transcript implementation and testing of

Ericsson GSM RBS/2106/2206/2302/2308/2250

Designed in Hot Slide, Restacking, De-growth, and T-1 harvest work.

Trained by Nokia for Installation/De-Installation of GSM BTS. De – installation of WLS E-911. With Certification

and Data Base Identification NOKIA –ID -NO#001TNS01680

Performed Power Plant de-installations for TDMA Lucent cabinet and equipment.

Receive the Highest Remarks from NOKIA Job Quality Inspector and Managers in CHICAGO.

CERTIFICATIONS/TRAINING:

NOKIA SELF AWARENESS BTS - INSTALLATION AND DE-INSTALLATION. April 11, 2006

PT ID#001TNS1680.

SBC -TP76300 EXI PARSONS QUALITY WORKMANSHIP CERTIFIED. April 11,2007

GSM RT-2/RTU2 For UMTS Project. CERTIFIED BY EXI PARSONS IN OAKLAND. April 11,2007

Certified Outside Plant Engineer (OSP) Certified by Versacom. June 15,2007

OSHA 10 Hour Construction- Click Safety

Working with RF Energy- Tessco

Fall Protection –Safety Services Company

Fiber Optics To the Antenna (FTTA)-Tessco Wireless Training

T-Mobile Modernization Program-LDO TAC

ARES Training Certified by AT&T

Jam expert Certified by AT&T

SLI certified by AT&T

F2 Condition trained by AT&T



Contact this candidate