Mackenzie Atwood
Quevic Drive
Saratoga, NY 12865
Cell: 1-803-***-****
acat5h@r.postjobfree.com
Objective:
To gain solid and long term employment in a fast paced, technical, and
challenging work environment.
Summary:
I am a responsible, resourceful technician and a strong team player with
both electrical and mechanical troubleshooting skills involving the
semiconductor environment. Some of my work skills include, but are not
limited to Plc and Microprocessor skills, basic programming, hydraulic,
pneumatic, RF and vacuum technology troubleshooting. I am able to work
independently, but also possess the skill and experience to be a leader.
Education:
. Associates Degree in Electrical and Electronics Engineering
Technology, Vermont Technical College (1999-2001)
. High School Diploma, Spaulding High School (1995-1999)
Experience:
Principal Technician Equipment Engineering
GLOBALFOUNDRIES (02/11-Present)
. Responsible for the training and development of new hire Lam Equipment
Technicians.
. Proficient using factory systems such as Xsite, SiView, FDC, Space and
Klarity.
. Assisted with installation and qualification of Lam E5 platforms
during ramp and startup of Fab 8.
. Actively engaged member of safety, 5S/Protocol and also ERT Team at
Fab 8 facility.
. Perform standard maintenance along with advanced troubleshooting and
scheduled/unscheduled preventative maintenance on Amat, Lam, and Tel
equipment.
Work Group Coordinator/Senior Equipment Technician
Micron Technology (09/06-02/11)
. Lam, Amat equipment cleans, scheduled and unscheduled pm's, leak
detection, Talon upgrade, and RF calibrations.
. Troubleshooting plasma etch process parameters using PCA, E3, SPC,
Klarity Defect, ETI, 5s, and Toolview.
. Mechanical and electrical repairs of chemical scrubbers, chillers,
Lam, Tel and Amat dry etch equipment.
. Respond to all process faults on tools and safely recover affected
product wafers including editing recipes if needed.
. Prioritize and distribute the work load of Lam tools.
. Lam Kiyo/Exelon Advanced Equipment Training.
Equipment Technician
Koyo Bearings (05/05-05/06)
. Repaired and basic programming along with troubleshooting Koyo Plc's.
. Mechanical and electrical installation of ac/dc motors, pumps, gear
boxes and automated machinery.
. Removal, installation, and troubleshooting of fully automated CNC
machinery.
Installation Technician
Time Warner (10/04-03/05)
. Installed and terminated telephone and high speed data services.
Equipment Technician
Shakespeare Monofilament (03/04-09/04)
. Mechanical installation, repair, and troubleshooting of packaging,
winding, and extrusion machinery.
. Basic troubleshooting, programming and repair of Allen Bradley Plc's.
Equipment Technician
R.C. McEntire (04/02-02/03)
. AC/DC motor repair and rebuild, gear box installation and
troubleshooting.
. Standard production line maintenance, scheduled and unscheduled pm's,
and also basic fabrication and welding.
. Troubleshooting of high speed packaging and produce machinery.
Equipment Technician
IBM (06/00-02/02)
. Standard pm's, leak detection, and troubleshooting on terminal metal
tools and also scan, bake tape tools.
. Electrical and mechanical troubleshooting on diamond blade saws and
die picking/packaging machines.
. Communicate all tool related changes to production and engineering
teams.
. MFC installation, replacement and programming.
Electrical Assembler
Bombardier Mass Transit Corp (06/99-09/99)
. Printing and running electrical cable, assembly of both electrical
machinery and electrical products for different types of rail trains,
along with electrical sub-assembly on interior of rail cars.