Post Job Free
Sign in

Electrical Engineer

Location:
Tehran, Iran
Posted:
November 08, 2013

Contact this candidate

Resume:

BEHNAM NIKOUEI

No.**, Arasteh Allay,

West Nazar St, 817-***-****

Isfahan, Iran.

Email: *.*******@*****.***

Contact no: +98-913*-****-**

Expected Salaries: Negotiable

Availability: Any Time After Letter Acceptance

Personal Detail

Gender: Male Marital Status : Single

Date of Birth: 26th AGUST 1983 Place of Birth: Iran

Nationality: Iranian Health: Excellent

Career Objective

. To get a challenge position at a growth-oriented firm which will allow

me to further utilize my skills and gain experience in varying

technology.

. Seeking for full time position in the engineering field to obtain

challenging position.

. Keen to develop and optimize the skills and potentials by gaining the

additional knowledge and experience for the best of the team and

company.

. Securing a challenging and progressing career experience through

utilizing the technical and theoretical knowledge gained in

undergraduate studies

. Willing to work hard and to work extra hours in order to bring

satisfaction and to achieve the standard of work set by your

respectful company.

. Meet company expectation with excellent communication and leadership

skills and committed to long life learning.

Highlight of Personal Strength

Matured and responsible manner with a strong commitment to service

excellence. Capable to work under pressure, highly motivated, quick

learner, hard working, spontaneous, dynamic, analytical thinking, team

spirited and capable to work independently with minimum supervision or

as part of a team.

Education Background and Qualification

. 12 Sept 2011- 15 May 2013

Master of Power Electrical Engineering

Malaysia Tenaga Nasional University (UNITEN),Putrajaya Campus,

Jalan IKRAM-UNITEN, 43000 Kajang, Selangor.

Tel: 603-****-****, Fax: 603-****-****.

Current CGPA: 3.52/4

http://www.uniten.edu.my

Major Course works: Power Electrical Engineering

Engineering Diagnostics Tools, Power System Steady State Analysis,

Power System Protection, High Voltage DC Transmission System,

Alternatively Energy Sources for Electricity Generation and

Research Methodology.

. Jan 2003- 14 Feb 2008

Bachelor Degree in Power Electrical Engineering

Islamic Azad University of Khomeinishahr (IAU),

Khomeieni Shahr Branch, Iran.

Tel: 009****-*******

CGPA: 13.38/20

http://www.iaukhsh.ac.ir

Major Course works:

Electrical and Electronics Circuit, Signal & System Analysis,

Communication System, Electronics, Electrical Machine, Electrical

Installation, Linear Control System, Power System, Power Plants &

Electrical Energy Production, High Voltage Substation Design &

Project, Protection & Relay and Industrial Drafting.

Working Experiences

. 10 June 2013 (Current)

Faratahghigh Sepahan (SBR)

Sepahan Beyond Research International Company Isfahan, Iran.

No.118, Apadana 2 street, 816*-****** Isfahan Iran.

Tel:009*-**-**** 4418

Position: Electrical Design Engineer

Duties:

. Design Power Systems

. Prepare Electrical Design

. Design Single Line Diagram

. Design Conductor capacities (sizes) and insulation type

. Design Protection devices and interrupting capability

. Design Main and distribution panel board locations and sizes

. Design Circuitry of all outlets and devices

. Short circuit analysis

. Load computations

. Design Grounding and bonding

. Prepare Low Voltage control diagrams

. Design Lighting Systems

o Design Lighting fixture performance specifications and arrangements

o Design Emergency Lighting

o Design Lighting Control and circuiting

. Design Alarm Systems

. Design Grounding Systems

. Design System riser diagram, device types and locations,type of

conductors and installation requirements including rating

identification, listing requirements and backup power requirements

. 16 May 2009 to 1th September 2011

Regal Petrochemical Company

Negarestan Building, Masroor Square Esfahan, 816681548 Iran

Tel: 009***********

http://regalpetro.com

Position: Electrical Engineer cum Electrical Designer

Job Scope/duties:-

. Head of construction team and design team.

. Responsible for project implementation, planning and site

coordination.

. Make sure the project completed within the schedule/dateline to

avoid any extra cost and to meet client satisfaction.

. Supervising the design team.

. Provide the effective and efficient design to minimize the cost.

. Designing the lighting system

. Designing the lighting fixture

. Designing the CCTV and alarm system.

. Design the Power Protection.

. Design the Power Switchboards.

. Design new control system.

. Designing the BMS system.

. Running the testing and commissioning after completion.

. Checking the entire electrical system including electrical

devices, motor and transformer.

. Control the wastage and cost during construction.

. Carry out system troubleshooting and analysis failure of system.

. Supervising and carry out the preventive maintenance of electrical

systems.

Major challenges experience In Regal Petrochemical Company:-

. Managing two challenge projects in Iran (NAFISS), this is the

biggest and modernist Green House in Iran and world biggest

Islamic projects in ISFAHAN/Iran.

. Designing a new controller for air cooling and improve the

cooling system.

. Provide the planning and coordination to minimize the wastage of

material and energy during the construction or operation.

. Design the electrical circuit with last versions software that's

used for this project such as:-

Etap( for power system design), Eplan ( for Switchboards

design), Dialux ( for lighting design),Docwin ( To chose and

determine cable size ) And 2D AutoCAD for drawn our design.

. April 2008 to October 2008

Working with GS Engineering & Construction Company Limited

537, Namdaemunno 5-ga,

Chung-gu, Seoul 100-095, South Korea

Tel: 82-237**-****

Website: http://www.gsconst.co.kr/

Position: Electrical Engineer

Job Scope/duties:-

. Testing and commissioning of south pars at Oil & Gas field.

. Responsible to supervisor of substation.

. Head of Maintenance and Technician team.

. Responsible for checking the feeder of power Switchboards.

. Responsible for preparing the technical and operation report.

. Responsible to run the preventive maintenance of electrical

equipment.

. Running the troubleshooting, Solo run test, rotation test and loop

check.

. Testing and Commissioning Motor, Transformer, Switch Gear LV

&MV, MCC, DCS and UPS System.

Project Completed:

. South Pars Gas Field development phase 9 & 10 at Iran.

Other Training Courses/Others Certification

. Pass with IELT (International English Test).

. Participate in Innovation and Entrepreneur Seminar Organized by

University Tenaga Nasional Malaysia.

. Participate and presenting a paper at National Graduate Conference

2012.

. Participate with advance training for electrical instrument and

software in Iran Chemical Investment Co. Power plant for 2 months.

. Participate with advance training for electrical instrument and

software in Isfahan Regional Electricity Co. For 3 months.

Other Information

. Strong experience in designing, interpreting and understanding

electrical and electronic circuit diagram and power protection.

. Strong knowledge in designing power distribution system.

. Excellent knowledge in electrical and electronic devices.

. Capable to work with varying software such as CYME, PSAF, ETAP( for

power system design), EPLAN ( for Switchboards design) - Logo

software, DIGSILEN, DIALUX ( for lighting design),DOCWIN ( for

choosing and determine the cable code ),AutoCAD,MATLAB and PSCAD.

. Strong experience and knowledgeable in troubleshooting, analysis

failure of electronic instrument, electrical equipment such as motor,

transformer, bus bar, circuit and other electrical equipment.

. Knowledgeable and skillful in using engineering software for

calculation and drafting.

. Knowledgeable in power generation and distribution system and sizing

of electrical equipment and cables.

. Good command on general computer (MS Office, MS Excel, MS Power

Point, MS Words &Auto CAD)

. Fluent in English language

Final Years Project

Master Thesis:

Design of FACTS Device for Voltage Sag Mitigation in Large Power Systems.

Main supervisor: Dr. NADIA TAN MEI LIN (Tel: 603-****-****)

Co-supervisor: Dr. MAHMOOD A A YOUNIS ((Tel: 603-****-****)

Email: ********@******.***.**, ******@*****.***

Bachelor Thesis:

Simulation of main electrical substation with ETAP and CYME software, and

compare results for steady state.

Supervisor: Dr. Shahrokh Shojaeian. Email:

**.*********@*****.***

Publications

. Overview of Flexible AC Transmission System (FACTS) Devices

(B.nikouei, Dr.MAHMOOD A A younis,F.taghizadeh and Dr.Nadia)

. Overview control strategies of series, shunt, series/shunt categories

of FACTS devices for three functions stability of power system

(F.taghizadeh, Dr. MAHMOOD A A YOUNIS,,B.nikouei, Dr.Nadia)

. INTRODUCTION OF FACTS DEVICES USED IN TRANSMISSION LINE AND

MULTILEVEL CONVERTER

National Graduate Conference 2012, B.nikouei,

F.taghizadeh and Dr.Nadia

. Mitigation of voltage sag phenomena by using of Dynamic Voltage

Restorer

National Graduate Conference 2012,

F.taghizadeh,B.nikouei, Dr.Nadia

References

1. Mr. Seong Soo Lee

Electrical Manager

Management & Commissioning section

GS E& Construction Company

Tel:+821*********

Email: ******@*******.**.**

*******@*******.***

2. Mr. Esmail Khoshnevis

Electrical Manager of Regal Company

Tel: 009***********

******.**********@*****.***

***********@*****.***

3. Dr.Nadia Tan MEI LIN

Senior Lecturer

Dept.of Electrical Power Engineering

College of Engineering, Universiti Tenaga National (UNITEN)

Km7,Jalan kajang-Puchong, 43009 Kajang, Selangor, Malaysia.

Tel: (603-********

Email: *****@******.***.**

4. Ms.Movahedi

Electrical Design Manager

SBR Esfahan Iran

Tel: 009*-**-**** 4418

Email: ****@***-**.***



Contact this candidate