PROFESSIONAL OVERVIEW
A driven professional with over twenty years of experience successfully
seeking, and implementing unique solutions to complex problems for the
automotive, aerospace, military, medical device and food industry. A leader
of innovation that is able to take the best ideas from a team and make them
work. Employers, peers and subordinates describe this engineer as a go to
person that delivers results, is highly dedicated, and strengthens teams. A
successful solution is one that maintains the shared vision, meets the
project scope, is on budget, strengthens the team, satisfies the end users,
and ensures that all team members are credited for their contributions. In
summary, this engineer knows how to lead, and knows when, and how, to
follow.
PROFESSIONAL EXPERIENCE
Ghirardelli Chocolate Company San Leandro, CA
2005 to Present
Continuous Improvement/Manufacturing Engineer
. Experienced in deploying the operational pillars of AM, MP FI,
T&E, and Safety Pillars
. Led the plant performance control system and the Kaizen or
continuous improvement teams
. Led the waste reductions teams in 2013 that resulted in 1.2
million dollars in saving in 2013
. Led the strategic planning and deployment of key performance
indicators that manage operations
. Administer the CMMS system including training and auditing of
the PM, CM, work order and accounting system.
. Responsible for machine and process improvements on existing
production lines
. Provide technical training for the operations and maintenance
staff.
. Work closely with the technical staff of other departments to
ensure new process and products can be manufactured with
repeatable results
. Participated in the purchasing of capital equipment to increase
plant capacity or plant productivity
Unit Manager of Production and Maintenance
. Responsible for the production, the quality, the staff, and the
maintenance of the square, and bar production machinery
. Supervised nine, production supervisors, a controls engineer,
two maintenance supervisors
. Created the existing budgeting system for the maintenance
department
. Ensured GMP and FDA practices were followed and in compliance.
. Administer the 5.5 million dollar maintenance budget as well as
capital funds.
Maintenance Supervisor
Responsible for troubleshooting and repairing the machinery in
bean processing, milling, roasting, liquor production, refining,
conching, Ground Chocolate, tempering, chip depositing, and the
packaging machinery
Machine Automators Stockton, CA
10/2000-2005
Self employed as Designer, Builder, and Developer of manufacturing
machinery
Designed and fabricated custom machinery for the medical device
industry. Prepared the performance specifications, created the
mechanical drawings, selected the components, did the electrical
design and integration including the PLC program.
Marchi Systems Redwood City, CA A Manufacturer of Temperature
Control Systems 1999-2000
Manufacturing Engineer
. Designed components for an automatic induction-brazing machine
. Introduced inert gas purging and reprogrammed the PLC to
accommodate the improvements.
. Reduced the process time for casting an RTD from 90 hours to 8
hours
Currie Machinery San Jose, CA A OEM of Industrial Packaging Machinery
1998-1999
Project Engineer
Designed and programmed Palletizers and Conveyors for various
industries. These machines were integrated into a computerized
process control system that tracked the product from raw material
to boxed and palletized units.
Memry Corporation Menlo Park, CA A Medical Device Manufacturer using
Exotic Metals 1990-1998
Project Manager
. Performed cost, feasibility, and capacity studies
. Selected and ordered capital equipment.
. Planned, managed and supervised the tasks of Electricians,
construction workers, Maintenance Mechanics, and HVAC mechanics.
. Ensured that the facility met all local and federal codes, FDA,
GMP and OSHA requirements
. Setup preventive maintenance schedules and documentation
Engineering Manager
. Responsibilities included training, equipment purchases,
documentation, and equipment validation. Coordinated the
activities of the Engineers, Machinist and Maintenance mechanics
Conducted performance evaluations and led special projects.
Raychem Corporation (Medical Division) Menlo Park, CA A Material Science
Company 1984-1990
Process Engineer
Duties included processes and equipment development, proposals,
feasibility and costing studies.
ACHIEVEMENTS:
. Designed a Catheter tube-processing machine (The machine is
patented)
. Designed a robotic hot forming machine
Product Engineer (R&D Exotic Metals Division)
Responsibilities included product and process development of
Medical Devices, aerospace products and components used in various
military weapons systems.
PRODUCTS
Coronary Stents, Thoracic Stents, Multiport trocar, Laparoscopy
Mini Retractor, Endo-Roticulator, Endo-catch, Tinel-Lock (heat
to shrink metal fasteners), P-Gap cryogenic connector, DIP
cryogenic connector, AMRAAM Missile segment fastener
ACHIEVEMENTS:
. Designed production machines for the Endocatch products
United States Army
1980-1984
SKLLS
. PACKAGE HANDLING
Experienced in designing, troubleshooting, repairing, and
installing, Conveyors, Palletizers, Paper Feeders, and package
handling systems
Proficient in troubleshooting high speed wrapping machines
Proficient troubleshooting problems with Ishida, Eagle, Triangle
scales and bagging machines
. ELECTRICAL
Troubleshooting, and selecting VFD, Stepping and Servomotors,
Encoders, Transducers, SSR, Circuit Protection, sensors, Timers,
limit switches, and Interlock safety systems, metal detectors.
. MECHANICAL
Selecting, and installing power transmission systems, installation
and use of magnets, product screens, and metal detectors.
. PNEUMATICS AND HYDRAULICS
Proficient at selecting components to meet speed, force, environment
and work factor requirements.
. MANAGEMENT
Led and mentored Engineers, Maintenance, and Machine Shop personnel.
Performed personnel training, and design reviews. Successfully
managed financial budgets that exceeded five million dollars
. COMPUTER SKILLS
Proficient in AutoCAD 3D, Word, Excel, Projects, Visio, ACCESS Power
Point, & MATLAB
. PROGRAMMABLE LOGIC CONTROLLERS
Programmed Allen Bradley, Siemens, Modicon, CTC controllers,
Panelview, and Magelis
. ROBOTICS
Automatic TIG Welders, brazing machines, Metal forming machines, and
tensile testing machinery
. MATERIAL SELECTION
Four years of professional experience working in a material testing
laboratory
. DOCUMENT CONTROL
Design Reviews, Routes, BOM, Work Instructions, ITM, and equipment
validation.
. PROCESS CONTROL
Trained and certified in SPC at Process Owner level to perform time
and machine capacity studies
. LANGUAGE
Proficient speaking, reading, and writing English and Spanish
EDUCATION
Cogswell Polytechnic College of Engineering 30 units BSEE 6
classes left 2008-2010
Cogswell Polytechnic College of engineering 26 units BSME
1990-1993
College of San Mateo 52 Units General Ed
Canada College 30 units Bus.
Administration 1988-1990
Sequoia High School
1976-1980
ADDITIONAL COURSES
. Failure Mode & Effects Analysis, Stanford University
. Statistical Process Control University of Michigan
. Design of Experiments University of Michigan
. Management Training for Technical Managers University
of Michigan
. Allen Bradley Programming
. Siemens 7 Programming