Post Job Free

Resume

Sign in

Engineer Project Manager

Location:
Jacksonville, FL
Posted:
November 01, 2013

Contact this candidate

Resume:

Phillip E. Perkins

**** ********* **. ****. * Apt 1706

Jacksonville, Fl. 32256

Tel: 904-***-****) Email: acanaq@r.postjobfree.com

Summary of Qualifications:

This is to express my interest in the position of Maintenance Superintendent/Maintenance Manager with your organization. Based on my experience and skills as outlined in my resume, I am confident that I would be a great asset to your organization. My engineering experience of over 25 years as a Senior Maintenance Engineer, Maintenance Planning Superintendent, Project Engineer, and Project Manager at various industrial facilities, affords me the opportunity to provide you with the technical expertise your organization requires to achieve its objectives.

Education:

Thomas Edison State College, Trenton, New Jersey

• Bachelor of Science in Mechanical Engineering

Certificates in:

• Project Management

• Maintenance Planning & Scheduling

• Train the Trainer

• Competency Assessor

Technical Skills:

• Project Coordinator/Manager

• Maintenance Planning Superintendent

• Maintenance Superintendent

• Senior Maintenance Engineer

• Maintenance Engineer

• Project Engineer/ Project Coordinator

• Root Cause Analysis.

• Reliability Centered Maintenance

• Infrared/Thermography

• Oil Analysis

• N.D.T, Vibration Analysis

• Energy Auditing

• Heating, Ventilation and Air Conditioning

• Safety Coordinator

• Competency Assessor

Professional Experience:

Aerotek, Jacksonville, Fl. 32216

Reliability Engineer (Contract) 01/2013 to Present

• Provide technical support to the maintenance department by introducing various reliability centered maintenance diagnostic tools to improve plant reliability and efficiency.

Contract Work, Various Locations

Contract Project Engineer 10/2009 to 01/2013

• Provide capital project management support to various companies requiring technical expertise in the area of mechanical, structural, and civil projects.

• Diagnostic and on-line testing and monitoring of equipment and systems: Infrared, Vibration, Calibration, Thermo graphic Survey, Certification, and Failure Analysis.

• Provide technical support in the areas of Energy and Equipment Audits.

• Audit Plants to ensure that employees are adhering to Safety standards as outline in company safety policy.

• Carry out in Plant assessment of craftsmen to determine their competency in the field expertise.

• Audit Plant equipment condition to ensure their integrity and reliability.

BPR-Bechtel, Mandeville, Jamaica, West Indies

Contract Project Manager/Coordinator 04/2007 to 11 /2009

• Project coordinator responsible for various aspects of a major expansion program consisting of mechanical, structural, and civil work at a major Bauxite and Alumina Plant in Jamaica West Indies.

• Liaise with Managers and Engineers to discuss and report on the progress of ongoing projects along with planning and execution of new ones.

• Provided all technical support that needed to address all concerns that would develop during project implementation. Project Size: U$100 Million

• Projects included but not limited to the installation, testing and commissioning of a Digester Tube Heater along with all piping and pumps.

• Acid cleaning system for continuous cleaning of drum filters. Project Size: U$5 Million

Alumina Partners, Elizabeth, Jamaica, West Indies

Project Engineer/Coordinator 09/2001 to 02 /2007

• Coordinated and managed various construction and maintenance projects involving mechanical, structural and civil disciplines at a large Bauxite/Alumina Refinery in Jamaica West Indies.

• Developed Engineering Requests, Project scopes, Cost Estimates and Time line for projects of various costs and size. Est. Project Size: U$100,000 to U$10 Million.

• Managed projects to ensure that there were no major deviations to project scope, cost and time.

• Ensured that all projects met ISO 9001 Standards.

• Coordinator for all maintenance work scheduled with operations, maintenance and planning departments to ensure that the needs of the affected areas are met.

• Utilized various reliability centered methods to determine equipment condition in an effort to plan an effective maintenance schedule.

• Planned all work packages utilizing the input of the Reliability Engineering Group.

• Developed and implemented an effective maintenance planning and scheduling process.

• Provide cost estimates for civil, mechanical and structural projects of various sizes.

• Provided all craftsmen and equipment necessary for the execution and completion of all project work.

Alumina Partners, Elizabeth, Jamaica, West Indies

Maintenance Superintendent 11/1993 to 09/2001

• Responsible for an area maintenance group comprising eleven tradesmen and a supervisor in executing all scheduled maintenance work within the plant.

• Coordinator for all maintenance work, scheduled with operations, maintenance and planning department to ensure that the needs of the affected areas are met.

• Coordinate scheduled audits to ensure the integrity and reliability of plant equipment.

• Managed a centralized maintenance planning and scheduling department.

• Developed and implemented an effective maintenance planning and scheduling process in collaboration with consultants from the U.S.A.

• Managed and supervised eleven planners of various discipline in the execution of daily maintenance planning and scheduling tasks.

• Ensured a solid maintenance planning and computer based information system was in place which responded to the needs of the plant.

• Responsible for tabulating, analyzing and distributing all data collected in an effort to measure the performance of each segment of the plant.

• Utilized various reliability centered maintenance methods to determine equipment condition in an effort to plan an effective maintenance schedule.

• Monitored maintenance projects to ensure strict adherence to J.S.P’s (Job Safe Practice).

• Conducted needs assessment meetings with representatives from maintenance, operations and engineering and developing work priority for various trade groups.

• Provided support to maintenance and operations that ensured the reliability of company assets.

• Implement Thermograph program to identify condition of Motor Bearings, Hot Spots on Rotary and Stationary Kiln Shell and Motor Control Centers.

• Utilized various N.D.T program such as Corrosion Protection, Cathode Protection, Thickness Checks, and Ultrasound to monitor conditions and reliability of various vessels, and process piping.

• Utilized CMMS program to schedule lubrication cycle of various pumps and other rotating equipment. This program also included the analyzing oil samples to determine condition of bearings and other rotating parts.

• Utilize Root Cause Analysis to troubleshoot equipment failures.

• Utilized Vibration Analysis program to monitor Main Line and Peripheral Equipment such as pumps, gearboxes, agitators, blowers and fans to be proactive in the maintenance of Plant Equipment.

• Planned, scheduled and executed all maintenance outages and T/A that involved the allocation and distribution of resources, material, and equipment, along with providing the technical expertise necessary to achieve turnaround targets.

• Coordinated maintenance projects with area supervision and management, while ensuring the efficient utilization and distribution of resources and equipment.

• Monitored and tracked the progress of projects by conducting daily status meetings with various crafts involved and reporting progress to management as the need arose.

Pfizer Inc., Brooklyn, New York

Mechanical Engineer 08/1989 to 09 /1993

• Part of project team involved with the development of various capital and maintenance projects.

• Designed and supervised the construction of a 14,000 sq. ft. office complex with centralized zonal HVAC system and production and distribution. Est. Project Size: U$275,000.00

• Supervised Civil works to accommodate two ten thousand gallon underground boiler fuel oil tanks.

• Coordinated the installation of two (2) Cleaver Brooks Package Boilers and associated piping and equipment.

• Provided supervision in fabricating and installing all pipes and storage system for steam condensate reclamation

• Designed all piping runs for a plant wide compressed air supply system.

• Provided Technical support during the upgrading and installation of plant production machinery and equipment.

Engineering Assistant 04/1983 to 08/1989

• Provided assistance to Senior Engineer with work scope and cost estimates for maintenance projects.

• Provided field support to Senior Engineer during the development and execution of maintenance projects.

Utilities Assistant 07/1979 to 07/1983

• Assisted mechanical engineer with measuring the performance and reliability of utility equipment (water, steam traps and electric meters) to ensure the efficient consumption of all utilities provided.

• Responsible for cooling tower water quality meeting required daily standards.



Contact this candidate