OBJECTIVE:
To secure a position with a stable and profitable organization, where I can
be a member of a dynamic team and utilize my knowledge, skills and
expertise to the fullest.
EDUCATION:
> Master of Project Management & Supply Chain (MS), University of
Houston, TX, USA GPA: 3.89
> Master of Business Administration (MBA), University of Pune, India
GPA: 3.6
> Bachelor of Commerce (BS), University of Pune, India
GPA: 3.4
PROFESSIONAL EXPERIENCE:
> Projects Generalist II- Alfa- Laval Ltd., India
June'07-June'08
. Worked as a generalist in the Projects Department while handling both
Planning and cost functions simultaneously.
Cost Control:
. Prepared and established the Cost Breakdown Structure, and Budget
Elements which describe the full structure used in the Cost Control
System and that aligned into the Work Breakdown Structure. Ensured full
coherence and utilization of the Cost Control System and that aligned
with the Work Breakdown Structure for budgeting purposes and for
reporting key performance indicators throughout the project.
. Computed Actual Cost of Work Performed (ACWP).Ensured the timely coding,
collection, analysis and reporting of all project expenditure, together
with the budget holder(s). Ensured the monitoring and reporting of
project. Prepared the customer cost reporting package as dictated by the
contract.
. Produced short and long term cash flow projections in a continuous and
timely manner. Produced audit reports and other audit information as
required by internal & external audit teams.
Planning:
. Worked with the order entry team to develop multi-month linearized
production plan. Managed and prioritized the schedule for all work in
process (WIP). Coordinated the flow of WIP to the production floor based
on completion dates supporting schedule requirements. Planed and
scheduled materials to support inventory policies, WIP, and demand
requirements. Maintained companywide project schedule in Microsoft
Project
. Level loaded production schedules taking into consideration materials
availability, customer demand, lead times, and capacity. Achieved and
maintained proper inventory levels for all materials based on anticipated
demand. Coordinated the flow of information between Order Entry,
Purchasing, Assembly Leads, Manufacturing Management, Quality and
Shipping.
. Communicated potential delivery problems and last minute scheduling
changes as a result of backlogs, design changes and material or labor
shortages to Materials Manager and Customer Service.
. Assisted with maintaining raw material requirements status for items
needed for ongoing projects. Coordinated with the Document Control
Specialist to ensure that items are entered into system and that
attributes are set correctly.
. Worked with Purchase Department to ensure that Bills of Material are
structured correctly. Reviewed Purchase Order and all the contractual
documentation in order to detect discrepancies and prevent any
misunderstanding that could potentially cause delays.
. Ensured that the vendor supply schedule covered all the supply cycle
phases and its compliance with contract delivery terms and dates.
Risk Control:
. Drafting the risk matrix, risk probability, occurrence type through Risky
Project Software.
. Briefly involved in assessing, monitoring and mitigating risks associated
with certain projects.
> Cost Control Officer, Anand Developers & Constructions, Pune, India
May'03-Jul'05
. Assisted Project Controls Manager in preparation of baseline and control
budgets, project code of accounts, commitment tracking, expenditures,
cash flow forecasts, monthly forecasts and management reports, analysis,
change control process.
. Prepared manpower forecasts. Provided cost management information for
incorporation into the schedule. Formulated and recommended corrective
action measures such as schedule revisions, manpower adjustments, and
work requirements.
. Computed Cost Variance (CV), Schedule Variance (SV), Cost Performance
Index (CPI), Schedule Performance Index (SPI), Actual Cost of Work
Performed (ACWP) in Microsoft Project through Earned Value Management
System (EVMS).Calculate and plan Estimate To Complete (ETC). Prepared the
customer cost reporting package as per contract. Produced short & long
term cash flow projections in a continuous & timely manner.
. Ensured the timely coding, collection, analysis and reporting of all
project expenditure, together with the budget holder(s). Produced audit
reports and other audit information as required by internal & external
audit teams.
INTERNSHIP:
> Management Trainee - Tata Motors, Pune,India
May'06- Aug'06
. Lead and successfully completed a project in controlling costs (Earned
Value Analysis) for an assigned project, using Microsoft Project.
. Was involved in drafting the work breakdown structure. Calculated Planned
Value, Actual Cost, Earned Value.
. Calculated the total cost and schedule variances (CV and SV), cost
performance index and the schedule performance index (CPI and SPI) and
Variance on completion for the project.
> Management Trainee - Anand Developers and Constructions, Pune, India
May'13 - Aug'13
Lead and successfully completed a project in Inventory reduction by
monitoring and maintaining inventories. Improved procurement process
through system verification and installing new software to manage the
procurement data and thus reduce extra costs involved in the process.
SKILLS SUMMARY:
. Strong interpersonal and communication skills, effective team player.
. Strong computer skills including MS Word, Excel, PowerPoint, Project.
. Well versed with Risky Project Software - used for assessing, monitoring
and mitigating risks in a project path.
. Trained in Six Sigma - Green Belt, currently working on Six Sigma Green
Belt Project.
ACHIEVEMENTS: Alfa Laval Global Talent Award 2008.
REFRENCES: Available upon request.
Prachi Mahesh Nadkarni
2323 ELDRIDGE PKWY #537 ( Houston TX 77077 ( 832-***-****
(************@*****.***