Resume:

Thomas A. Thomas

** ******* **.

Oroville, CA

530-***-****

Education: High School Graduate, Las Plumas High School, Oroville, CA

Butte College, Chico, CA

General Education

Mt. San Jacinto College, San Jacinto, CA

General Education

Environmental Training and Compliance, 40 hours, Haz-Whooper

Environmental Training and Compliance, eight hours, Supervisor

OSHA, Competent Person

First Aid / CPR

Confined Space

Employment

History:

Cox and Cox Construction

(current-02/07/2012)

Working Foreman, Superintendent,

Equipment operator

All phases of construction.

Including building crews,

Scheduling, Ordering Material,

Estimating Quantities,

Running Multiple Crews,

Corresponding with Clients,

SWPPP, Billing, Change Orders,

Extra Work, Submittals,

Foreman, Mainline Excavator and

other Pipeline related

Equipment, Asphalt Paving,

Concrete and Grading.

Downing Construction Inc.

(01/05/2012- 11/18/2010)

Site superintendent, Foreman,

equipment operator

Scheduled work, Organized Crews,

Ordered Material,

Estimated Quantities, SWPPP,

Change Orders, Extra Work,

Billing, RFI's, Submittals,

Asphalt Paving, Concrete,

Grading,

Sukut Inc. (11/15/2010-

04/09/2010)

Site superintendent: San Timateo

Canyon Brine line;

18in HDPE, 7 miles of pipe.

Organized multiple crews,

Set up and coordinated Sub

Contractors, ordered and

coordinated material and

deliveries, worked with on site

Project Manager, represented

Sukut Inc. at all district

meetings and functions.

Sage and Associates. (2009)

Surety completing a project

that had went back to the bonding company. I took the

job and started overseeing my Completion Subcontractor

Cox and Cox. The job included deep Sewer, Joint Utility

and Water. I attended owners meetings with J.F. Shea

and

City of Redding, I organized

work with multiple crews, I represented Surety to make

sure monies were spent in the most efficient areas; I

gave written authorizations for Extra Work and approved

pay estimates. My job was more on the line of an

Inspector making sure Completion Sub worked at top

efficiency and as a buffer between

J.F. Shea and Surety. My top

goal was to make sure that the limited amount of money

provided by the bonding company was spent correctly and

keeping Completion Sub on the Critical Path for

scheduling. This experience of working on the opposite

side of construction helped me understand the importance

of the Schedule and watching costs more closely.

SJ Louis Construction Inc.

(2008-2009)

On Site Superintendent, None

Working Foreman.

My duties included day to day

operations of crews, keeping material ordered, working

with multiple subcontractors including, Nada Pacific,

Viking Drillers, Corrpro, and many other's. I was in

charge of all extra work and change orders. I attended

weekly and cooperation meetings with EBMUD engineers and

implemented SJ Louis standards of operation. Total

contract price for the Folsom South Canal Pipeline was

$26,000,000.00. I also completed another segment of

this pipeline for the FREWA district in Freeport. It

also was 72in Steel pipe that ended and dumped into the

Folsom Canal. Total contract price $23,000,000.00

Mountain Cascade Inc. (2006-

2008)

Mainline Foreman: Ran

mainline crew as foreman completing four projects for

Mountain including, Rancho Cordova, Anatolia pipeline

project where I installed DIP waterman, HDPE storm

drain, RCP storm drain and PVC sewer. Elk Grove blvd.

water transmission main, my crew and I worked nights for

four months digging down Elk Grove blvd. installing 24in

DIP. My next project with Mountain Cascade was the

Pajarjo River Pipeline Project in Watsonville, CA. This

job was all steel pipes including 72in, 48in, 36in and

24in tape wrapped steel pipe with cement mortar lining.

Utah Pacific Construction Co.

(2003-2006)

Site superintendent: Organized multiple crews on different sites,

worked closely with Engineers and Developers while doing

C.F.D. work. I recently completed the Dos Lagos project

in Corona, Ca. for the S.E. Corporation. I was Job

Superintendant as well as Project Manager, I did my own

entire material take offs and ordering along with

estimating Change Orders. I shopped all my suppliers to

make sure we always received the correct pricing and

organized all the Sub-Contractors for move in times,

work available and quality of work. The Dos Lagos

project included over 15mi. of pipe, plus all

appertence. At some times I had three mainline crews

digging on separate facilities to keep the project on

schedule. My crews installed all the off site utilities

including Sewer (up to 32ft. cuts), Domestic Water

(36in. CMLC, 24in.CMLC, 18in. DIP,12in. 10in. 8in. 6in.

PVC), Raw Water (18in. DIP),

Force Main (12in. 12in. 6in. DIP), Storm Drain ( 108in.

78in. 54in. 42in. 36in. 24in. 18in.).

Kenko, Inc. (1990 - 2003)

On Site Superintendent, Working

Foreman, Equipment operator.

Organized meeting with cities,

counties and state,

Organized multiple crews and

foreman, Scheduled sub-contractors,

Worked under Western Division

Manager. Heavy paperwork, (change

Orders pay estimates, ECT.).

Position included new hire/discharge

Responsibilities and

enforcement of Company rules. The majority of

Projects that I completed for

Kenko was large diameter Steel

Water mains from 36in to 72in

Concrete coated along with Tape

Wrapped coatings, along with

Sewer, Storm drain,

Thomas Pipeline (1993 - 1995)

Foreman: Heavy plans, specifications, estimating and paperwork.

Operator: All equipment related to pipeline construction.

While working for my brother I ran entire jobs. Worked closely with

districts, engineers and other related agencies. Handled

all paperwork including daily reports, foremen reports,

change orders, extra work reports, OSHA, and soil

classification reports. The experience with paperwork I

gained opened many doors and gave me new opportunities

to make the company money in ways other than just job

production, while still pushing 10 - 12 man crews.

Quality of work and cleanliness of job sites was a major

point with keeping agencies happy and created extra work

that was given to us by districts that were confident

with our work.

E.C. Thomas & Sons

Construction (1983 - 1990)

General Labor: Worked with Mainline Excavator locating utility

service line crossing, mixing concrete for thrust

blocks, any shovel (hand) work, installing of new water

and sewer services, jackhammer work.

Pipe layer: Installation of water, sewer and storm drain pipe, worked

with grades and elevations, laser and grade liners,

general plans and specifications, pipeline installation

includes A.C.P., p.v.c., steel, clay, r.c.p... Related

Pipeline Equipment Operator.



Contact this candidate