Alesipso HM Sianturi, S.Si
Phone: 081*-****-****
Email: *******@*****.***/
*******@*****.***
PERSONAL DATA
Place & date of birth : Muara, 16th May 1978
Age : 35 years old
Gender : Male
Religion : Christian
Marital Status : Married
Nationally : Indonesia
Health : Excellent (no physical defect)
Passport No : T143601
FORMAL EDUCATION
1996-2001 : Chemical Science, Faculty of Mathematic and Natural Science,
Bogor Agricultural Institute.
1993-1996 : Senior High School at SMU Negeri Muara
QUALIFICATION
English proficiency both oral and written, self started, motivated, strong
analytical ability
Familiar with windows application, Word, Excel, Power Point, Internet, able
to work independent or in a team, able to adapt in any situation.
Good responsibility, and have strong intention in Quality for innovation
and development, Management, Cost Efficiency and Safety.
Understand and familiar with NACE International, SSPC, ASTM, ASME, API,
AWWA, ANSI, ISO, ACI Standard
CERTIFICATION
BGAS- Painting Inspector Level 2, License No: BG 647 469, Certificate No:
70522
Coating Inspector Level 2, Certificate No 66/MCI-VII/2/2009, APITINDO
(Assoc. of Indonesian Tech. Inspection Agencies)
Safety Inspector (Ahli K3 Umum), Certificate Number: 056/AK3/U/2006
TRAINING
17th -19th Sept. 2012 : Behavioral Safety Management System, Cert No. NCI-
I 1878, Neville Clarke International
3rd August 2010 : OHSAS 18001-2007 Overview and Requirements
15th December 2010 : DROPS Object Training by PT Premier Oil Natuna Sea
B.V
22nd July 2010 : Occupational Safety and Health management System (SMK3)
Awareness, Base on Regulation Minister of Manpower
No.Per.05/Men/1996
2nd-3rd June, 2010 : Supervisor Safety Training at PT SMOE Indonesia
October 2009 : Surface Preparation and Paint Application of Hempel
Paint
May 2008 : Total Quality Management System in Maintenance and Trouble
Shooting
5th-8 th Dec 2006 : Problem Solving Process (PSP)
28th Nov -1st Dec 2006 : Statistical Process Control (SPC)
20th-25th March 2006 : Safety Inspector with Certified No: 056/AK3/U/2006
7th - 14thMarch 2005 : Developing Effective Supervisor in cooperation
with manpower Department by PT Sumber Dian Mandiri/ Tunas
Karya Batamindo
13th-15th Sept 2004 : Safety, Hazard Identification & Risk Assessment
SEMINARY
3rd November 2009 : The Appropriate Preparation and Application for
Durable Anticorrosive Protection
26th July 2004 : Environmental Workshop: Environment Management to reduce
Waste and Pollution
12th January 2005 : ISO 14001: 2004 (New Revision) Environment
Management System
5th-7th June 2001 : The International Seminar on Natural Products
Chemistry & Utilization of Natural Resources by UNESCO at
Jakarta
WORKING EXPERIENCE
September 2013- Present : Coating Inspector at Oceaneering-CCJV
(Clough Curtain Joint Venture)
Project : PNG-LNG Project Upstream Infrastructure -section Hides
EPC5A
End user : ExxonMobil-Esso Highlands Limited
Job Title : Coating Inspector
Job description : Carry out Inspection Blasting and Coating on Spine
line and Tie-ins Field Joint Coatings Pipeline.
Check and inspection surface preparation, cleanliness, dust
level, salt test, blasted profile, and make sure to be
comply with Procedure & ITP as Client approved prior to
Coating.
Check and inspection WFT, DFT, Visual inspection, X-Cut,
coating applied and inform Coating Supervisor for any
remedial action to be taken for any failure.
Guiding blaster & Coater to achieve quality target and keep
maintain.
Check & Monitoring environment condition (Air/Ambient
temperature, Relative Humidity, Steel temperature, dew
points), equipment for blasting/coating, material
abrasives, coating material, during blasting/coating and
ensure those parameter to be comply for blasting and
coating activity as required.
Recording and documentation quality result and environment
condition for endorsing to Client.
Final inspection and verified pipe line prior to lowering for
buried and make sure those defect was rectified as well.
Repair and coated area pin bracing of Cathode Protection after
installing and final inspection prior to buried.
Feb 2013 to August 2013 : Painting Engineer c/w Yard Operation
Engineer at PT SMOE Indonesia
Project : WHP Naga & Pelikan
Client : Premier Oil Natuna Sea B.V
Job Title : Painting Engineer
Job Description : Witness and review production, QC test on site and
Laboratory Test Coating neoprene for pipe Riser and Riser
Clamp.
Monitoring & review production coating 3LPP for normal pipe &
Bend Pipe, QC test on site and Laboratory Test for pipe
Riser according to QP-ITP.
Checking, review and monitoring application Field Joint Coating
3LPP of pipe riser
Prepare Inspection Test Plan (ITP), Blasting and Painting
Procedure for Client to review and approved for
construction and make sure to be comply with Surface
Preparation and Coating Protection from Client.
Check and review ITP and Blasting and painting procedure from
Subcontractor/Vendor for client approval.
Check and review Painting/Coating report from
subcontractor/vendor and make sure to be comply with
ITP/Procedure which approved by Company/Client.
Propose Technical Deviation and Technical Query for Client to
review and approve by Company.
Check and review latest drawing for any revision which related
with painting
Make sure Quality Control Tools/equipments either in house
Calibrated or 3rd Party before execution.
Monitoring paint consumption, tools and other Blasting &
Painting consumable to be available on site.
Check and calculate abrasive and painting requirement for
Project Requirement
Follow up PQT either by Internal Contractor or Vendor to be
implemented before job execution.
Project : Australian Pacific LNG
End user : Conoco Philips
Client : Bechtel
Job Title : Painting Engineer c/w Yard Operation Engineer
Job Description : Check and Review Painting report prior to submit to
Client.
Check and Monitor Paint consumption, tools/equipment and other
consumable
Correspondence with Bechtel regarding painting schedule,
delivery after painting and ensure that quality are meet
according to ITP.
Job description as Yard Operation Engineer
: Check and review Subcontractor report for Yard facility project
Check and review material take off (MTO) for construction yard
and facility
Submit MTO to procurement to source material requirement for
tendering
Prepare worksheet tabulation for MTO with selecting material
and Vendor with competitive price for Capital Expenditure
(CAPEX) proposal to top management and follow up CAPEX
status to be approved
Raised Material request (MR), communicate with either Vendor or
Purchasing for delivery schedule of material and make
sure the quality meet company requirement to be on site
as per project planning.
Monitoring Progress internal project and finalize total cost up
to commissioning for completion report to top Management
Prepare time sheet, for manpower, equipment and other Yard and
facility being used by 3rd parties, Client, Subcontractor
for chargeable Cost.
Check, review, Yard and facility for repair and arranging
manpower to repair and upgrading Yard & Facility as
required
Feb 2011 to February 2012 : Painting Engineer at PT SMOE Indonesia
Project : Offshore Platform EPCI project, M 9 Zawtika Phase 1-A
Client : PT TEPI
Job Title : Painting Engineer c/w Painting Inspector
Job Description : Carry out PQT (Pre- production Qualification Test) and
invite all parties accordingly.
Monitoring environment condition for any blasting and painting
activities and make sure it comply with project
requirement.
Audit and inspection Galvanizing process and compiling
inspection report from subcontractor.
Carry out inspection on material being use for project
according to ITP, such as; salt test, Vial test,, paint
surface preparation, painting and recording inspection
report for final documentation.
Check and review QC Tools/ equipment and make sure were
calibrated either in house or 3rd party before execution.
Check and review final report from subsidiaries and main
contractor prior to hand over to Client.
Raise material request for any material which required for
blasting and painting activity
2009-Jan 2011 : Painting Inspector at PT SMOE Indonesia
Project : Gajah Baru CPP (CPP, Living Quarters, Bridge and Flare Boom)
Client : Premier Oil Natuna Sea B.V
Job Title : Painting Inspector
Job Description : Arranging Pre Qualification Test (PQT) on each Paint
System are using on project, prepare material and invite
all parties to carry out inspection on Test Panel
according to ITP
Carry out Qualification test for Blaster and Painter from
Contractor and subcontractor
Carry out Inspection prior to surface preparation, painting and
recording and documentation inspection records according
to ITP.
Prepare and make sure QC tools are calibrated by 3rd party and
available for inspection
Audit and inspection subcontractor for Galvanizing process
Carry out Inspection prior to surface preparation on Passive
Fire Protection (PFP), monitoring application
Fireproofing and final inspection.
Carry out inspection on piping prior to insulation/protection
according to operating/spec requirement.
Check and review subcontractor report and make sure that
Claimable report tally with progress report or other
documents were attached
Check and review QC report by Contractor, subcontractor for
final documentation prior to endorsing document to Client
Review and monitoring process coating 3LPP and 3 LPE during
production, QC test on site and Laboratory Test.
Inspection Incoming paint and invite Client representative to
witness and review paint at paint storage
May 2007- 2008 : Senior Engineer at PT Pacific Coatings Batam, Muka
Kuning Batam
Jan 2007- May 2008 : Engineer at PT Pacific Coatings Batam, Muka
Kuning, Batam
Job & Responsible
Raised certificate of Conformance for First Article (FA)
Sample
Prepare Plating/Coating Process Flow for New Project
As NPI member to propose, providing technical innovation
and brain storming with team of Coating process for new
product/project.
Check and review Failure Mode of Effect Analysis (FMEA)
for Coating Process
Review and follow up either Quality issue by Customer or
CA/NCR
Responsible to supervise and monitoring Line Supervisor to
make sure that Work Instruction was implemented
accordingly.
Evaluating and submit Monthly Performance of Company or
any kind of issues to General Manager
Ensure and review daily, monthly, and yearly inventory for
all raw materials well done and proper recorded.
Responsible to maintain Quality system in proper methods
according to PMP/PCPF.
Provide technical innovation and brainstorming with
subordinate for manufacturing efficiency and process
improvement periodically training and retraining sub
ordinate and reorganize team to achieve Production and
Quality target.
Jan 2005 - Dec 2006 : Senior Supervisor at Pacific Coatings Batam, Muka
Kuning Batam.
May 2004-Dec 2004 : Supervisor at PT Pacific Coatings Batam, Muka
Kuning, Batam
August 2003- April 2004 : Junior Supervisor at PT Pacific Coatings
Batam, Muka Kuning Batam
Responsible in preparation of material for Coating either
Raw Material or Re-Coating Material maintain Quality of
Material after Coating.
Check and review laboratory report and make sure that
Paint Properties Parameter are meet as per PMP in proper
mix, such as Pigment and Binder Ratio, pH, Conductivity,
Non Volatil, and Pre Treatment Parameter
Check and Review Paint Properties Test Result after
Coating such as Coating Thickness, Visual Manual
Inspection(VMI) Coating material, Glossiness, Chemical
resistance/ Rubbing Test with MIBK, Pencil Hardnes, and
Glass Transition(Tg) and ensure that results were meet as
per PMP requirement.
Guiding and managing manpower to be efficient in term of
machine production cycle time with closely
Check and Review Working Procedure updated for WWTP, DI
Water/RO system, Pre treatment Line, Electro-Coating,
Laboratory Inspection, VMI according to PMP
Prepare Standard Operational Procedure for PT Pacific
Coatings Batam
Assist Factory Manager for Qualification Factory as per
Customer Requirement
Set up production Line of Stripping Coating to ensure that
Existing coating was clear from Metal Base Surface
according to Process Management Plan (PMP)
Supervise, guiding, and brain storming with Line
Supervisor or Technician in preparation of Work
Instruction according to PMP or Government Regulation..
Set Up Waste Water Treatment Plant (WWTP) and selection
additional material to washing or neutralized and settling
down chemical hazard, De Ionized Water/Reverse Osmosis
System.
Set up Pre Treatment Line to ensure that Line Supervisor
and Technician meet PMP.
Jan 2002- August 2003 : Supervisor at PT Lautan Bening, Sekupang, Batam
Job Duties at PT Lautan Bening Batam:
Supervise production leader, Quality team, Store man and
Delivery Services.
Responsible to organize production schedule, raw material,
component and finished goods accordingly.
Provide and reporting daily inventory, monthly inventory
raw material, finished good and any kind issues in
production operation to achieve company goal
2000-2001 : Tutor at Kastia Privat Bogor, Bogor, West Java.
1999-2001 : Laboratory assistant for Basic Chemistry, Analytical
Chemistry,
Organic Chemistry, Food Chemistry, and Natural Product Chemistry,
Subject
at Department of Chemistry, Bogor Agricultural Institute, Bogor.