Post Job Free

Resume

Sign in

Engineer Process

Location:
New Richmond, WI, 54017
Posted:
November 20, 2013

Contact this candidate

Resume:

Larry Logsdon

**** ***** ******, *** ********, WI 54017

715-***-**** aca4pr@r.postjobfree.com

Supervisor Preco Inc.

October 2010-Present

. Make sure employees are doing there job

. Schedule jobs

. Schedule people for the jobs

. Make sure routings and jobs match the allotted time for the job

. Check employees time to make sure it is entered right

. Track and maintain vacation and sick days

. Give evaluations for employees

Lead Laser Applications Engineer Preco Inc.

Febraury2006-October2010

. Develop laser process to meet customer specifications by establishing

the wavelength, quality process, documentation, and any unique

equipment needed to meet requirements.

. Electronically document data of technical process utilizing ISO

standards.

. Create customer files using Solidworks, Inventor and AutoCAD (R12-

2011).

Convert drawings to G&M codes to utilize up to 5 axis laser

system.

. Assist new customers with on-site processing and process qualification

while determining SPC to validate the process and prove capability.

. Use vision technology to decrease tolerances from 0.2mm to 0.05mm.

Objective

Enthusiastic individual seeking a challenging position within

the Laser/Electro-Optic

field to contribute to the growth of an organization.

Education

Associate of Applied Science Degree in Laser Electro/Optic

Technology

February 2003-November 2004 Indian Hills

Community College Ottumwa, Iowa 52501

3.87 GPA

Presidents List for 4 terms

Training

Nd:YAG Laser Alignment

Laser Safety Training Argon

Power meters

Holography

Diode

Auto CAD Laser System Building

Diode Pumped Solid State Materials

Composition Oscilloscopes

HeNe

Ordering Optics Laser App. Labs

Ti-Sapphire

Interferometers Fiber Optics

CO2

Autocollimators CNC

Programming

Professional Experienc

Atchison Castings, LaGrange, MO

August 1996-June 2002

. Iron Pourer: Prepared and tested iron for daily production,

poured iron on production floor, cleaned and repaired iron

ladles.

. Core Maker: Prepared and tested sand mixture for daily

production, team leader for core production in six man line,

assembled cores, filed cores, painted and dipped cores, and was

responsible for transferring cores to iron floor for next day

production. One of four individuals in plant to have knowledge

of running a Lampe machine.

. Fork Lift Driver: Distributed work to 13 large finish grinders

and 5 machines in Mill Room. Responsible for reading work

schedule and transferring needed cores and castings to

appropriate production areas.

. Grinder: Knowledge and use of air tools used to clean castings,

maintenance of air tools used during production, operated stand

grinder and swing grinder. Helped teach new employees about

grinding process and tools.

. Welder and Heat Treat Licensed

Fruehauf Trailer Corp., Ft. Madison, IA

May 1994-July 1996

. Riveter: Installed sides of trailers and riveted side walls.

. Painter: Prepared paint used on trailers and painted trailers.

Keokuk Steel Castings, Keokuk, IA

March 1993-May 1994

. Grinder: Used air tools to clean castings.

. Welder: Wire welded holes in castings.

McBride, Ratcliff and Associates, Houston, TX

August 1988-March 1993

. Concrete and Asphalt Testing: Tested concrete and asphalt for

production use according to needed specifications.

. Soil Testing: Tested soil for compaction measurement.



Contact this candidate