Larry Logsdon
**** ***** ******, *** ********, WI 54017
715-***-**** ***********@*****.***
Supervisor Preco Inc.
October 2010-Present
. Make sure employees are doing there job
. Schedule jobs
. Schedule people for the jobs
. Make sure routings and jobs match the allotted time for the job
. Check employees time to make sure it is entered right
. Track and maintain vacation and sick days
. Give evaluations for employees
Lead Laser Applications Engineer Preco Inc.
Febraury2006-October2010
. Develop laser process to meet customer specifications by establishing
the wavelength, quality process, documentation, and any unique
equipment needed to meet requirements.
. Electronically document data of technical process utilizing ISO
standards.
. Create customer files using Solidworks, Inventor and AutoCAD (R12-
2011).
Convert drawings to G&M codes to utilize up to 5 axis laser
system.
. Assist new customers with on-site processing and process qualification
while determining SPC to validate the process and prove capability.
. Use vision technology to decrease tolerances from 0.2mm to 0.05mm.
Objective
Enthusiastic individual seeking a challenging position within
the Laser/Electro-Optic
field to contribute to the growth of an organization.
Education
Associate of Applied Science Degree in Laser Electro/Optic
Technology
February 2003-November 2004 Indian Hills
Community College Ottumwa, Iowa 52501
3.87 GPA
Presidents List for 4 terms
Training
Nd:YAG Laser Alignment
Laser Safety Training Argon
Power meters
Holography
Diode
Auto CAD Laser System Building
Diode Pumped Solid State Materials
Composition Oscilloscopes
HeNe
Ordering Optics Laser App. Labs
Ti-Sapphire
Interferometers Fiber Optics
CO2
Autocollimators CNC
Programming
Professional Experienc
Atchison Castings, LaGrange, MO
August 1996-June 2002
. Iron Pourer: Prepared and tested iron for daily production,
poured iron on production floor, cleaned and repaired iron
ladles.
. Core Maker: Prepared and tested sand mixture for daily
production, team leader for core production in six man line,
assembled cores, filed cores, painted and dipped cores, and was
responsible for transferring cores to iron floor for next day
production. One of four individuals in plant to have knowledge
of running a Lampe machine.
. Fork Lift Driver: Distributed work to 13 large finish grinders
and 5 machines in Mill Room. Responsible for reading work
schedule and transferring needed cores and castings to
appropriate production areas.
. Grinder: Knowledge and use of air tools used to clean castings,
maintenance of air tools used during production, operated stand
grinder and swing grinder. Helped teach new employees about
grinding process and tools.
. Welder and Heat Treat Licensed
Fruehauf Trailer Corp., Ft. Madison, IA
May 1994-July 1996
. Riveter: Installed sides of trailers and riveted side walls.
. Painter: Prepared paint used on trailers and painted trailers.
Keokuk Steel Castings, Keokuk, IA
March 1993-May 1994
. Grinder: Used air tools to clean castings.
. Welder: Wire welded holes in castings.
McBride, Ratcliff and Associates, Houston, TX
August 1988-March 1993
. Concrete and Asphalt Testing: Tested concrete and asphalt for
production use according to needed specifications.
. Soil Testing: Tested soil for compaction measurement.