Post Job Free
Sign in

DeltaV DCS

Location:
Canada
Posted:
November 17, 2013

Contact this candidate

Resume:

Address: *** ******* *****, ***** ****, M*A*E*

Tel: 647-***-****

Email: *****.******.***@*****.***

OBJECTIVE

SENIOR DCS PROCESS CONTROL ENGINEER

HIGHLIGHTS OF QULIFICATIONS

. More than Nineteen years engineering experience on Power, Mine, Chemical

projects and Oil and Gas offshore and overseas experience.

. 14 years' professional experience on DCS (Distribution Control System)

configuration and Project Leading. Included control system architecture

developing, interfaces designing, integration planning, hardware and

software design, configuration, installation, Factory Acceptance Testing,

Site Acceptance Testing, start up, site commissioning, loop tuning,

process control optimization and troubleshooting activities.

. Expert EMERSON DELTAV DCS, SIEMENS TELEPREM-XP DCS, INTERLLUTION HMI.

. Experience programming Turbo C in Calculation Software. Proficient in

data modeling in VBA in Excel to effectively analyses database.

. Skillfully use MS Office software and engineering software. Windows98,

WindowsXP.

. Self-starter, working effectively in team or independently with minimal

supervision.

. Well organized, multitasking, proven ability to meet and exceed timelines

and quality objectives.

. Enthusiastic, self-motivated and detail-minded with strong trouble-

shooting ability.

PROFESSIONAL EXPERIENCE

Hatch ltd. (www.hatch.ca), Calgary, CANADA

Senior System and Process Engineer

Jan 2013- Sep 2013

Working as DeltaV programmer on Nexen K1A project. DCS configuration on K1A

Long Lake Tie-in Project. FAT testing. Modbus TCP/IP communication

configuration, testing.

Nexen Long Lake Project. (www.nexeninc.com), Fort McMurray, CANADA

DCS Specialist Consultant

April 2012 - Oct 2012

Water Treatment Plant's process control sequence's improvement Project,

Function Testing, Device net's communication issue's project.

Instrumentation loop Check, new instrumentation device's commissioning,

Plants operation's DCS support, software logic configuration, graphic

changes, process control loop tuning, trouble-shooting, and MOC changes.

Reliable Controls Corp. (www.rcontrols.net ), UTAH, USA

Senior Process Control Engineer

Oct 2011 - April 2012

Barrack Pueblo Viejo Gold Mine Project, Dominic Republic.

Instrumentation loop Check, troubleshooting, DCS SAT, software

configuration, graphic changes, commissioning.

Kennecott Copper Mine Smelter, Salt Lake City US

Response for DeltaV DCS project, I/O interface index design, Serial

Interface configuration, HMI Graphic Configuration, Function Testing,

Plants operation Graphic modification.

Arclin Ltd. (www.arclin.com), Mississauga Headquarters, CANADA

Automation Control Engineer

Oct 2009 - Sep 2011

Response for DeltaV DCS project leading, I/O instrument index design,

network design, control system hardware design, purchase order, control

logic design, Profibus, Serial Interface configuration, foundation field

bus devices commissioning, Optimization chemical reaction process control

to fully automatic controlled, Optimization vacuum cooling control to fully

automatic controlled, Batch Control, loop tuning to stabilize the complex

loops automatic control, Plants operation events analysis, trouble

shootings to resolve the root cause, improve the plant running safety and

economic, interlock conditions analysis and improvement. Travels to Arclin

Canada, US, Mexico plants to standardize the corporate control function.

Canadian Natural Resources Limited. (www.cnrl.com), Fort McMurray, CANADA

DCS Specialist

May 2009 - Sep 2009 (CNRL Horizon Site)

Plant Operation support. DCS control System administration, network

maintenance, Foundation Fieldbus devices commissioning, AMS management,

loop tuning. Sequence Control programming, testing, ESD Logic testing,

Plant shut down trouble-shootings, Events analysis, control function

optimization, HMI graphics modification, and DCS configuration for MOC

change.

EMERSON PROCESS MANAGEMENT CO. (www.emersonprocess.com), Calgary, CANADA

Senior Technologist

Nov 2008 - Feb 2009 (CNRL Horizon Site Commissioning and Start Up)

DCS specialist

DCS control System administration, network maintenance, Device net

communication, Serial interface communication. Foundation Fieldbus

instrumentation, AMS management, loop check and trouble shooting, loop

tuning. Sequence Control testing, HMI graphics modifications, DCS control

logic optimization, DCS configuration for MOC change.

. 2007-2008, Thunder Hawk Project (SBM Atlantia / Murphy Oil).

DeltaV Process Control System (PCS) Configuration Lead.

Lead DCS Programming works. Lead development of PCS programming Guideline,

HMI Guideline documents, PCS Classis Control Function Modules Templates.

Planning PCS programming schedule, resources, PCS Hardware I/O allocation

assignment, FF segments and Third Parties interfaces Assignment. Lead

designing of PCS Hardware Architecture drawings. Lead Control Narrative

works, programming complex and sequence control. Attend and Lead PCS

Factory Accept testing in Houston.

. 2007, Long Lake Oil Sands Project (OPTI Canada Inc.).

DeltaV Process Control System (PCS) Programmer: Performed plant wide

seven third party interfaces configuration; Programming and graphics

configuration; overview static graphic development.

. 2006-2007, Qatar Gas II Common Sulfur Detail Design (ExxonMobil US).

DeltaV PCS Programmer: Performed DCS process graphics static review;

created modification requirement documents; matched logic drawings with

database; assigned and sorted device control logic types; generated and

tested control module templates; configured control narratives complex

loops and developed related customized graphics and faceplates;

participated in hardware channel's assignment; configured fire and gas

(F&G) and ESD interface

. 2006- East Area Gas 1B Onshore Facility IFAT (ExxonMobil US).

DeltaV PCS Programmer: Performed primary configuration of DCS and

ESSDS modules and graphics; configured control narratives complex loops and

developed related customized graphics and faceplates.

. 2006- East Area Gas 3C Offshore Facility IFAT (ExxonMobil US).

DeltaV PCS Programmer: Configured cause and effect interlock logic

for DCS control modules, configured and internally tested DCS interface;

configuration for ESSDS modules and graphics; performed detail review and

modification of analog control loop modules; reviewed hardware input and

output channel assignment; performed terminals design

. 2006- Sakhalin Island Chayvo Onshore Facility Korea Site Acceptance

(ExxonMobil US).

DeltaV PCS Programmer: Modified graphics, faceplates, modules;

developed and completed F&G module template, standard dynamos, faceplates,

and serial dataset using Modbus remote terminal unit (RTU) protocol;

finished DCS SAT network architecture design; tested and powered first DCS

control cabinet and server cabinet; activated DCS network; performed DeltaV

network/controller redundancy, point-to-point cabinet testing, and graphic

and configuration testing with ExxonMobil and Hyundai Heavy Industries.

. 2005 Sakhalin Island Dekastri Onshore Facility FAT (ExxonMobil US).

DeltaV PCS Programmer: Completed FAT deficiencies on DCS graphic

control loops; configured interface modules with Triconex safety system;

configured Matrikon object linking and embedding (OLE) for process control

(OPC) pipe for Triconex programmable logic; supported control cabinets and

machine shipment

EMERSON PROCESS MANAGEMENT CO. (www.emersonprocess.com), Shanghai, CN

Project Engineer

Jan 2003 - May 2005

. Two years' work on BP SECCO petrochemical project. Designed and

implemented DCS control system architecture networks, serial-link

interface design, Hardware's power consumption and heat dissipation

calculation, DCS Controllers' allocation, Input/Output modules allocation

and Operator control graphic's production. DELTAV software Logic

configuration. Such as Turbines Oil Control System's, Ethylene Cryogenic

Tank's control logic configuration. Support EPC AMEC on Foundation Field

Bus designing work.

. A half-year's site commissioning work on BASF BYC petrochemical project.

DeltaV DCS Site Commissioning Engineer: Provided onsite technical support

for engineering, procurement, and construction (EPC) team during

instrument and equipment control loop checks, commissioning, lead

troubleshooting activities; trained EPC commissioning team human machine

interface (HMI) operators.

ARGO INTERNATIONAL CO. NANJING OFFICE. (www.argointl.com), Nanjing, CN

Chief Representative & Sales Engineer

2001 - 2002

. Work with ARGO American and Europe branches to offer China Customers

import service. Represent Office to communicate with local governments

and main business partners.

. Develop customers' networks; Supervise customers' credit on payment.

Assisted operation office.

SIEMENS POWER PLANT AUTOMATION Corp. (www.siemens.com), Nanjing, CN

Process control Engineer

1998 - 2000

. Responsible for BPS (Turbine Bypass Control System) designing and

commissioning. Resolved many Software and Hardware hitch problem on site

in time, be very confidence of analysis and judgement ability. Master

KKS,P&I, TELEPREM-E DCS, Kinds of Equipment and Measurements in Field.

. (1998.6) Parts of software design and commissioning of 2# 300 MW BPS for

Xiangtan Power Plant. (1998.8) Part of hardware design of 2# 300MW BPS

for Jiangsu Taicang Power Plant. (1998.9) Commissioning 1# 300 MW BPS for

Shanxi Baoji Second Power Plant. (1998.10) Commissioning 2# 300 MW BPS

for Henan Jiaozuo Power Plant. (1999.8) commissioning 2# 300 MW Turbine

BPS for Hegang Power Plant.( 1999.7) trained the plant's technical staffs

in Sichuan Guangan Power Plant .(1999.8) Commissioning 4# 600 MW Turbine

BPS for Harbin Third Power Plant.( 1999.9) Commissioning 2# 300 MW BPS

for Shanxi Baoji Second Power Plant.(1999.9) Emergency service 6# 125 MW

Turbine BPS for Haikou Power Plant.( 2000.6) Commissioning 3# 300 MW BPS

for Shanxi Baoji Second Power Plant.

. (1999.1-1999.7) Worked in Germany, SIEMENS Power Station Group

Instruments & Control Department. Participated the Flue Gas

Desulphurization project designing work for Beijing First Co-generator

Power Plant, Banshan Power Plant. I did control wiring designing work for

all field equipment and instruments. (1999.11-2000.4) Worded as site

supervisor to instruct DCS installation on Beijing FGD site.

. (2000.7-2001.3) contributed whole hardware designing of DCS control

system of Mongolia Province Zhuger 2X300MW power station project. Wrote

numbers of VB computer programs, accelerated the process and insured the

precision.

HEILONGJIANG ELECTRIC POWER RESEARCH INSTITUTE (www.hepri.com), Harbin, CN

Power Engineer

1993 - 1998

. Responsibilities include for researching the Thermal Economic Quality of

Turbine; equipment testing, regulation and fault diagnose. Programmed

Thermal Economic Calculation software by Turbo C language.

. (1993) Industrial water system flow online measurement in Harbin Thermal

Power Plant. (1994) Industrial water system flow online measurement in

Jixi Power Plant. (1995) online testing of 200MW boiler suspension arms

in Fulaerji Second Power Plant. (1995) 200MW Steam Turbine Generator as

peak load regulative unit on daytime operation base research in Fulaerji

Second Power Plant. (1997) 300 MW Turbine test run in Heilongjiang Hegang

2# Power Plant.

EDUCATION & TRAINING

. Emerson DeltaV Batch, EMERSON Austin TX 2010

. Modern Loop Tuning, EMERSON Toronto CA 2008

. EMERSON DELTAV System training, EMERSON Shanghai CN 2003

. SIEMENS TELEPREM System training, SIEMENS Nanjing CN 1998

. Bachelor in Power Process Engineering SOUTHEAST UNIVERSITY Nanjing CN

1993(www.seu.edu.cn)



Contact this candidate