Ramachandra Sunkari
Quality Assurance Intern at Greatbatch Medical
aca0pj@r.postjobfree.com
Summary
Aim for Continual Improvement and Excellence
Experience
Quality Assurance Intern at Greatbatch Medical
May 2013 - Present (7 months)
• Performed Process Potential Failure Mode Effect Analysis (PFMEA).
• Handled Customer complaints, non-conformances and provided CAPA (corrective and preventive actions)
by performing route cause analysis.
• Issued and evaluated SCAR (supplier corrective action reports) and performed supplier audits to meet ISO
9001/ ISO 13485 standards.
• Authored the qualification protocols and performed equipment and machines validations and manufacturing
processes and product design validations (IQ, OQ, PQ). Performed supplier new product qualifications.
• Performed statistical analysis and generated the validation reports, studied SPC and analyzed trends,
Conducted MSA – Gauge Linearity and Gauge R and R, Attribute Agreement Analysis and performed DOE
to improve the existing processes and for determining operating settings for new products.
• Performed process audits, reviewed and updated operating procedures/process specifications and conducted
associates training.
• Improved automated daily QMS metric data analysis and shipping and RI support.
• Performed process audits to meet ISO 9001/ ISO 13485 requirements.
• Exhibited good problem solving skills and currently working on cost reduction focusing on the scrap rate,
NCMR’s and Customer Complaints. (Six Sigma Black Belt Project)
• Developed and Updated Quality plans and Control plans for multiple products which include precision
machining and molding manufacturing processes.
Assistant Manager - Operations at Tata Advanced Systems Ltd
August 2009 - July 2012 (3 years)
• Production in-charge of the final assembly of the Sikorsky S-92 model helicopter Cabin, painting,
acceptance testing (Hydraulic lines pressure test, Cabin leak Test, Bonding Test, Flight Control Test, Leak
test of engine drain and APU drain lines) and Final Packing and shipping. In-charge of major structural
repairs.
• Planning and scheduling the work.
• Lean Implementation: 50 % reduction of the Cycle time achieved.
• Inventory and resource Management.
• AS 9100 rev-C Internal Auditor.
• RRCA, corrective and preventive action implementation team lead and KAIZEN committee coordinator.
Page1
• Member of Quality Improvement Program at TASL.
• Member of ACE Supplier Gold, 6S and Visual Factory implementation team.
• Team leader for 3P (Pre-Production Planning) for major assembly lines. Master at process mapping, facility
layout and design processes.
• Coordinated the final assembly jigs and fixtures installation.
• Responsible to give on job training to the new operators and graduate engineers.
• Worked as a Manufacturing Engineer initially for the period of 8 months with the following responsibilities:
# Preparation of AOS-assembly operation sheets (assembly methods and processes) and standard operating
procedures.
# Configuration management.
# Supported daily operations by trouble shooting, maintenance support and training associates on operating
procedures, customer and design specifications and Engineering Drawings, GD&T (Geometric Dimensioning
and Tolerance).
# Coordinated activities and Engineering support for assembly Jigs and Fixtures erection.
Operations Intern at Solar Semiconductor (P) Ltd
June 2008 - July 2008 (2 months)
• Coordinated in the production and planning activities under the supervision of the production Manager.
• Part of Visual Factory team and was responsible for 5-S activities.
• Monitoring and reporting the daily production to the higher management.
Mechanical Engineering Intern at Hyundai Motor India Ltd
June 2008 - June 2008 (1 month)
• Responsible for scheduling the daily servicing activities and issuing the job cards to the operators.
• Responsible for improving the servicing time and time study and work area improvement.
• Closely monitored engine and transmission overhauling.
• Closely monitored diagnose and repair of Elentra, Verna, Accent and Santro models.
Projects
Flight Time improvement of Auto gyro
February 2013 to Present
Members:Ramachandra Sunkari
• Conducted Measurement system analysis to validate measuring system.
• Developed improved design for longer flight times of Auto gyro and determined process capability.
Lean Enterprise
April 2013 to Present
Members:Ramachandra Sunkari
• Investigated the application of Lean Manufacturing in Pharmaceutical Industry and presented key findings.
• Prepared a detailed A3 for 'Automotive Component Manufacturing Company' case.
• Optimized the cell layout, prepared operator balance chart and determined optimum changeover policy and
Page2
finished goods requirements to fulfill demand fluctuations considering maximum ROI.
Stock Market Simulation Using AnyLogic
April 2013 to Present
Members:Ramachandra Sunkari, Jay Trivedi
• Modeled a virtual Stock Market using AnyLogic for a single stock by incorporating Investors and Traders
with their behavior and investment policies into the model.
• Determined the best investment policy to be followed based on the results of the simulation.
Job Shop Design (Simulation Modeling)
March 2013 to Present
Members:Ramachandra Sunkari, Jay Trivedi
• Modeled a job shop with 5 types of machine groups, considering the long run cycle time, long run number
of waiting jobs and the budget constraint of $40 million using Simulation Software ARENA.
• Determined the optimum number of machines required to reduce the waiting time for jobs and waiting
number.
Improving the efficiency in the utilization of the available Meeting rooms at WNY-Americorps
November 2012 to Present
Members:Ramachandra Sunkari
The project uses the Six-Sigma Methodologies to improve the efficiency in the utilization of the meeting
rooms at WNY-Americorps - DMAIC Methodology was used in maximizing the utilization efficiency.
Supply Chain Analysis - Woodcock Brothers Microbrewery, Buffalo, NY
September 2012 to December 2012
Members:Ramachandra Sunkari, Vishnuprasad Sowrirajan, Swathi B, Saraswathi Reddy Vedere, Adam
VanDeMark
• Analyzed complete supply chain of the firm and compared it with industry standards to identify areas of
improvement
• Established Capacity Planning, Forecasting and Postponement policies that maximize profit for the start-up
firm
Courses
Master's degree, Industrial Engineering
University at Buffalo
Production Planning and Control
Six Sigma Quality
Design & Analysis of Experiments
Quality Assurance
Simulation and Stochastic Models
Facilities Design
Page3
Lean Enterprise
Supply Chain-Design-Modeling & Optimization
Logistics and Transportation
Project Management
Languages
English
Hindi
Telugu
Skills & Expertise
Leadership
Accelerator
Technical Audits
Technical Standards
Technical Training
Six Sigma
Project Management
Operations Management
Assembly Processes
Production Managment
Process Engineering
Team Management
Production Planning
Manufacturing
Lean Manufacturing
Value Stream Mapping
Capacity Utilization
Capacity Planning
5S
Project Planning
Testing
Design of Experiments
SPC
Statistics
Continuous Improvement
Catia
Quality System
Quality Assurance
Quality Control
Product Development
Product Launch
Project Engineering
Supplier Quality
Page4
Education
University at Buffalo
Master's degree, Industrial Engineering, 2012 - 2013
Osmania University
Bachelor of Technology (B.Tech.), Mechanical Engineering, 2005 - 2009
Page5
Ramachandra Sunkari
Quality Assurance Intern at Greatbatch Medical
aca0pj@r.postjobfree.com
Contact Ramachandra on LinkedIn
Page6