Planning / Scheduling Engineer

Location:
Iligan City, Lanao del Norte, Philippines
Salary:
7000
Posted:
August 05, 2019

Contact this candidate

Resume:

ROBERTO ENAD GOMORA

BACHELOR OF SCIENCE IN CIVIL ENGINEERING

Mobile No. +639*********,+639*********,

ac9zn4@r.postjobfree.com; ac9zn4@r.postjobfree.com

OBJECTIVES:

A company that will complement my qualifications and best effort to share my expertise as well as good career growth advancement.

Position Applied : Production Planner

Contact Telephone Landline: +63221-1107

Mobile No: +639*********, +639*********

Address – Singapore:

BLK 1 # 03-02 KAMPONG KAYU ROAD, SINGAPORE,431001

HP # +65-90517206,,+658******* sg

E-Mail:

ac9zn4@r.postjobfree.com

ac9zn4@r.postjobfree.com

CURRICULUM VITAE

Name Roberto

Surname Gomora

Place of Birth Iligan City, Philippines

Date of Birth May 13, 1962

Degree B. S. Civil Engg. (Mindanao State Univ.-IIT, SWU, SPC )

Languages Fluent English (written and spoken) - Basic Filipino, Arabic, Spanish, Russian, Kazakh, French, Portuguese, Korean & Japanese.

PASSPORT # e-2995870 Exp. 18 DEC. 2019

EXTRA SKILLS:

- Knowledge of Primavera Project Planner program for windows (P3V3.1), Primavera 8.5 Expedition, Primavera P6 (ver. 7,8.2, 8.3,15.1,15.2,16.1,17.7,18.8 ).

- Knowledge of Microsoft window package

- Knowledge of AUTO CAD14; 2000

- Knowledge of Driving – Light Vehicles

Persons reference:

Engr. Emilio V. Embile – QA/QC Engineer, SQ. BLK 1 # 03-02 KAMPONG KAYU ROAD, SINGAPORE,431001

HP # +65-90517206

Mr Paul Carpenter-Dept. Manager- Metal Servises Co. LTD. (email ad: ac9zn4@r.postjobfree.com),cell # +966-*********

Mr. Leonard Syke- Project Leader (email ad:ac9zn4@r.postjobfree.com)

WORK SKILLS / EXPERIENCES: Onshore/Offshore Projects (Oil & Gas) Multi- Discipline Projects.

Planning & Scheduling, Estimating, Costing, Quantity Surveying, Supervisor of construction & implementation, Project Monitoring, & Project Control.

Employment History and Projects: Onshore / Offshore (Oil & Gas) Multi- Discipline Projects.

Hydro Electric Power Plant, Steel Plants, Residential and Industrial Complex, Steam Generating Plant, Gas Plants, Oil Refineries, Oil Terminals, Oil Tanks Farms, Oil Bulk Plants, Hook up Offshore and Platforms, Oil Pumping Stations, Export Pipe Lines cross country, Operation and maintenance of Oil refineries/tank farms and Offshore Fabrication of Sub-sea structures in Lobito & Warri Yards, Gas Gathering Units and Power Plant.

Main Function

To assist Project Manager / Engineer for planning, scheduling, monitoring of Production and execution of Projects by ensuring quality, legal aspects, cost effectiveness and timely completion of projects.

Job Description:

To plan, perform and manage the development of an appropriate method and sequence of construction operation for projects monitoring, controlling, recording and reporting cost; Oversee planning of the entire program of work that anticipates the project’s various demands.

WORK EXPERIENCES:

Company Industry

Oil & Gas / Petroleum

Department/Functional Area

Corporate Planning, Consulting / Strategy

COMPANY : 1] AL- HOTY COMPANY LTD., Eastern Province, Kingdom of Saudi Arabia.

POSITION : Schedule Engineer II

DATE : Aug 2014- June 2016

Working at KHURAIS PMT Office.(SAPMT)

Review Project Progress on Regular Basis-(Contractors reports), submitted to PMT Project control office .

Initiates and prepared networking for daily reports in Primavera Project Planner (Software ) per B.I. under Khurais and Central Arabia Projects at OMPPD Division.

Preparation/Tracking Daily Progress reports and submit to Senior Engineer and Project Manager in Khurais and Central Arabia Projects.

Coordinate with Contractors’ ;site manager for Construction progress reports, resource requirements, procurement,quality control,hse and Sub-contracting.

Coordinating with Contractor to finalize Progress reports requirements and coordination between different activities area of concern and format.

Updating construction progress photos per area and all construction phase of works.

Preparation of Presentation and slides for Managers Meeting every month.

Updating of Tie-in Charter of Wells and miscellaneous Items weekly routine.

Updation of Weekly Division Project Highlights to the Department.

COMPANY : 2] MATAL SERVICES, Eastern Province, Kingdom of Saudi Arabia.

Project: (PARALLEL WASTE WATER,MARAFIQ), Jubail,Eastern

Province, Kingdom of Saudi Arabia.

POSITION : Senior Planner

DATE : September 2012- June 2014

Plan, perform and manage the development of the most appropriate method and sequence of construction operation for projects; Monitor preparation of construction plans and forecasts.

Oversee the entire program of work including the complete project execution plan and preparation of schedules Coordinate with Contractors’ ;site manager for Construction progress reports, resource requirements, procurement,quality control,hse and Sub-contracting.

Oversee specialized planning functions; Work with planning and cost control engineer and other planning staff to anticipate a contract’s demands in terms of labor, materials, equipment technical challenges, and guide in the preparation of schedules of progressive achievements and milestones Updating construction progress photos per area and all construction phase of works.

Manage and ensure total compliance with execution period of the contract and its each mile stone; ensure the project is completed within the agreed timeframe and budgeted cost

Manage entire planning activities, supply deficiencies, provide improvement and monitor the progress throughout the construction process against the contractual obligations

Assign work to planning and cost control engineer and other planning staff, monitor their performance and work progress and guide them from time to time

Train planning and cost control personnel on the software and other data management tools

Manage and guide the planning personnel in reviewing fabrication schedules and overall construction and project execution schedules.

Monitor the project execution activities and ensure liaisioning with the Site Manager and Projects Manager throughout the process, making adjustments to projects as necessary under direction from the line manager

Guide the planning and cost control engineer and other planning personnel in reviewing work progress, preparing all the required documentations that help Finance issue invoices

Evaluate from time to time planning operation of assigned responsibilities, prepare reports on operation and recommend improvements and modifications

Monitor and ensure each stage of the project execution is achieved within the allocated budget; report any overrun / excess as well as project statistics to the line manager for his review and guidance

Manage and guide the planning personnel in reviewing fabrication schedules and overall construction and project execution schedules.

Participate in budge preparation, monitor budget execution, and ensure strict cost containment delivering value for each project

Build up a team of supporting personnel staff, motivate them for greater productivity, periodically evaluate their performance, communicate to them need for improvement, train and enhance their professional skills and ensure that they fully meet the department’s objectives and contribute to its steady growth and development

Establish proper communication and reporting structure within the department for streamlining the department’s various activities and processes

Ensure the job holder and subordinates are aware of HSE rules, regulations and practices, and their strict compliance for a healthy and safe working environment

COMPANY : 3] SEPCO3-Chinese Co. Project: Ras Azwr-Raz Al-khair Power Plant(Poyry-SWCC), Eastern Province, Kingdom of Saudi Arabia.

POSITION : Senior Cost/Planning Engineer

DATE : April 2012- August 2012

Review Project Progress on Regular Basis-(Sub-contractors reports), submitted to PMO Project control office .

Initiates and prepared networking for daily reports flow charts for PMO-Project control guidelines and methodology.

Preparation/Tracking Daily Progress reports and submit to consultant and client.

Coordinate with General Manager;site manager for Construction progress reports, resource requirements, procurement,quality control,hse and Sub-contracting.

Coordinating with Sub- Contractor to finalize Progress reports requirements and coordination between different activities area of concern and format.

Preparation/Submission of Weekly Reports to consultant and Client Project Progress on regular basis.

Updating construction progress photos per area and all construction phase of works.

Sub-contractors’ coordinator .

Site tracking and checking of the declared progress of the subcontractors

daily and weekly reports.

COMPANY : 4] ILK- ENG’G. & CONSTN. CO. LTD.- Turkish Project: Gas Gatjhering Units PROJECT – Turkmen Gas- Turkmenistan

POSITION : Lead Planning Engineer

DATE : Dec. 2011- January 2012

Reviews the scope of work, design, criteria and quantities and coordinates to develop Enterprise Projects Work Programme.

Interfaces designated Contractors for specific planning and scheduling packages.

Develops Work Programme and monitoring packages.

Supervises planning/scheduling packages. Ensures work is completed as scheduled.

Plans and supervises the level of effort to establish milestones of the Enterprise Project.

Develops schedule resource loading and leveling.

Develops scheduling standards and procedures

Fasts track Work Programme and analyze problem areas to determine the critical schedule packages.

Collects information input into specific studies.

Prepares and presents the Work Programme Impact Report.

Prepares and presents planning and scheduling information.

Upgrade Skills of Planning Engineer/Planning Assistant.

Analyze Productivity Data and report to Project Manager as necessary.

Preparation/Implementing corrective actions/Recovery Programme to arrest slippages.

Coordinating sub-con. for revision of Construction Schedule/Recovery Schedule for Slippage as necessary.

Prepare and ensure Master Program of Works/Critical Milestones are achieved, ensuring effective planning and monitoring of site progress.

Ensure that all Contractual/Company and Local Authority requirements for Quality, Health Safety and Environment (HSE) requirements are complied with.

Review Project Milestones, Contract Requirements and prepare Project Schedules based on the Planned Milestones.

COMPANY : 5] GS ENG’G. & CONSTN. CO. LTD.- KOREA Project: RUWAIS 4TH NGL TRAIN PROJECT – GASCO-ABU-DHABI- RUWAIS, ABU DHABI, U.A.E.

POSITION : Cost/Planning Engineer

DATE : January 2011-September 2011

Responsible for the Preparation of Planning package (Master Schedules…etc.)

Ensure that new projects are kicked-off using the (P3 software).

Promote the application of project control tools ( P3 ) on all new projects.

Ensure that company’s planning, project management and project control procedures are adhered to on all projects.

Prepare and present detailed project information (Gantt charts, histograms, PERT charts, WBS, Baselines Schedules, S Curves & Progress reports).

Ensure that advanced planning, scheduling and analysis techniques are applied within the project environment.

COMPANY : 6] JURONG ENGINEERING LTD.- SINGAPORE Project: GP1Z-PHASE III-SONATRAH –TRAINS SEPARATION OF GPL AN INTEGRATED COMPLEX-ARZEW-ALGERIA, NORTH AFRICA.

POSITION : Planning Engr. Project

DATE : May 2009 – March. 2010

JOB DESCRIPTION:

Prepare Project Budgets & Project Resource Histograms- Mobilization Schedules – Project Schedules and Monthly Valuations.

Reviews field budgets and develop master plan for executing and controlling the construction activities.

Regularly monitors the systems to control field cost, schedules and quality.

Administers and enforces compliance with the terms of contracts and scope of requirements.

Prepare two weeks look ahead construction schedule.

Prepare four weeks look ahead construction schedule.

Prepare ninety days look ahead construction schedule.

COMPANY : 7] ACERGY-GROUP FRANCE SA CO. Project: Hook-Up Platform(Offshore)-Projects-Exxon Mobil, (Lobito Yard,Angola) and West Atlantic, Nigerian Territory, West Africa.

POSITION : Planning Engineer/Acting Head Planning Dept.(Lobito yard,Angola /Offshore Nigeria)

DATE : March 2008 - Dec. 2008

JOB DESCRIPTION:

Develops Preliminary Construction Programme during the tendering period.

Development of progress measurement procedure including weight factors.

Follow up schedule updates on specified projects on weekly basis.

Forecasts look ahead schedules and forwards to designated site engineers as their site responsibilities.

Updates actual resources to determine variances.

Prepares WBS for major activities to ensure completion of activities on time.

Resolves schedule conflicts and proposes remedial actions as required and notifies all concerned departments/persons regarding foreseeable schedule variables and their effects.

Initiates Project Construction Job Cards in Data Base link to Project Planner Program.

Identify Project Work Breakdown Structures with client representative.

Lead of Project Control Team for proper Cost charges and codes.

COMPANY : 8] I M I / PSN CO./KBR T-CHAD AFRICA(Project: Oil Exploration of ESSO, EXXON MOBIL, TCHAD, AFRICA)

POSITION : Planning /Scheduling Engr.

DATE : September 2007 – February 2008

JOB DESCRIPTION:

To monitor project status and Cash Flow of all Projects. To coordinate Project Managers issues with regards to planning and scheduling issues.

Establishes cost control system to monitor progress, expenditures and figure out overruns.

Initiates appropriate steps and suggestions to bring about cost conscious projects.

To Check Finalization of Monthly Progress Reports and Monthly Valuations of Contractors and Suppliers .

Provides detailed man hours, equipment hours, materials take of list for all major projects.

Set up of progress monitoring and forecasting systems to suit clients requirements.

COMPANY : 9] A L C A T -, QATAR – State of Qatar(Project: Qatar Gas Senior staff Villas and Infrastructure)

DATE : March 2007 – August 2007

POSITION : Planning Engr

Provide planning, scheduling and Monitoring of project progress.

Set up of progress monitoring and forecasting systems to suit clients requirements.

Assist Project management in issue of corrective actions due to slippage of schedule.

Develop trend analysis schedule /forecast .

Progress monitoring and updating of schedule activity/date.

Development of progress measurement procedure including weight factor.

Development of implementation plan in coordination with client.

Develop work break down structures and OBS .

Develop and issue document register, Develop Level 3 list and documents register.

Preparation of weekly, monthly progress report to be submitted to client.

COMPANY : 10] Hyundai Heavy Industries CO.-Ulsan, South Korea (Project: Bony Island, Nigeria) Nigeria Shell Projects (Bonny Terminal Integrated Expansion Projects) at Bonny Island, Federal Republic of Nigeria. Type of Const’n.= To construct Onshore and Offshore Plants, Tank Farms, New Process Crude Export Terminals, Port, Helipad, Residential Houses, Pipelines, Golf Course /Offshore Platforms and underwater pipe lines, Contract amounted to 1 Billion U$. Client : Shell Netherland.

POSITION : Planning Engineer/Q.S.

DATE : April 2003 – March 2006

JOB DESCRIPTION:

Provide support to describe the planning function and deliverables when tendering projects.

Analyze planning data and modifications as required to achieve targets through time based analysis and/or resource limited based scheduling.

Prepare and present detailed project information (Gantt charts, histograms, PERT charts, WBS, Baselines Schedules, S Curves & Progress reports).

Develop and maintain standard project planning and scheduling procedures, process maps, and guidelines.

Input planning data: activities, tasks, logic, resources, key dates, progress etc.

Development of Project Calendar and planning procedure.

Develop project schedules at various level.

Report all variations on timelines to the projects and implications on the same to the overall project costing and profitability.

Prepare variations of timelines and BOQ between planned versus actual.

Ensure that Actual BOQ is thoroughly investigated and verified.

Preparation of contractor’s bill assessment and payment recommendations.

Responsible for driving the implementation of the standard planning processes & systems across all sites, in particular.

Preparing and presenting cash flow and cost management advice to clients Interpreting and offering advice on contract.

Preparation of contractor’s bill assessment and payment recommendations.

Incharge of the preparation of Construction Line Item(CLI) as required by the client for monthly valuation orders.

COMPANY : 11] SAIPEM-- REPUBLIC OF KAZAKHSTAN( KMO )

POSITION : Project Q.S / Planner of SAIPEM-Melano - Italy.(Construction of Oil & Gas Exports Pipe lines-KMO-Aksai,Bolshoi chagan, Republic of Kazakhstan )

DATE : January 2002 – July 2003

JOB DESCRIPTION:

Review and prepare final estimates from working drawings then check variances from original bill of quantities as specified in the contract for possible addition or deletion of quantities.

Preparing and presenting cash flow and cost management advice to clients Interpreting and offering advice on contract.

Measuring and valuing variations.

Ensuring contractual notices and client entitlements are properly administered.

In charge of Project Monitoring and Monthly Billings to client.

Progress monitoring and updating of schedule activity/date.

Input planning data: activities, tasks, logic, resources, key dates, progress etc.

Establish the requirements and coordinate the implementation of systems tools and applications necessary to support the project control.

Promote the application of project control tools ( P3 ) on all new projects.

COMPANY : 12] Shell Gas station From Nov. 1999 – Dec 2002( Philippines)

POSITION: Planning Analyst

DATE: January 2002 – July 2003

Preparation of documents to expedite the deliveries of supplied fuels to be stored in Tank farms and bulk plants.

Initiates statistic schedule and forecast of weekly, monthly requirements. Updating daily sales quantities versus consumption and deliveries.

Supervising pumps crews and cashiers daily activities and monitor time to time sales and fuel sold out quantites.

Supervising repair shop and customer services .

COMPANY : 13] MS Al-Suwaidi-contractor of Saudi Aramco in Operation & Maintenance projects,in Oil Refineries, Gas plants, Bulk plants & Tanks farms Terminal port stands owned by Saudi Aramco.(KSA).

POSITION: Project Planning Engr/Q.s./Cost Engr.

DATE: February 1993 – Nov. 1999

Responsible for driving the implementation of the standard planning processes & systems across all sites, in particular.

Plan all scheduled maintenance/construction work orders by analyzing the basic job steps, determining their relative sequence in the overall job.

Visit select job sites to estimate manpower requirements, identify special equipment and tools required, estimate duration of job, and identify safety hazards en-route and on-site as well as identify environmental considerations for ad-hoc activities.

Establish details time schedule with activity listing, coding, dependencies and durations.

Ensure production impacts from scheduled activities are minimized.

Strive to build standard job plan templates for repetitive work.

Establish necessary resource loading schedules.

Analysis of contract documentation, project information, BOQ’s and drawings.

Monitor cost expenditure over projects.

Produce necessary scope, time and cost reports on periodic basis.

Plans and directs the provision of effective and reliable cost estimating services.

Compilation of accurate budgets,manage the Company cost data and trend forecast analysis.

Directs establishment of Project Cost Estimation procedures.

Prepare payment certificates to the sub-contractors.

Incorporate the Contract changes in the schedule and follow-up of activities.

Draw up weekly and monthly cost control reports and to be approved by the Project Manager.

Monitor the progress and the forecast and have them approved by the leaders of each discipline.

Have the Project breakdown approved by the various managers, in particular by the Project Manager.

COMPANY : 14] Atlantic Gulf & Pacific Co. of Manila(Project: Expansion Projects of Hotmill/Coldmill Modules, National Steel Corporation, ILIGAN CITY, Lanao Del Norte, Southern,Philippines)

POSITION: Q.S./Office Engr. / Appoint OPCEN Head Engr.

DATE: May 1986 – February 1993

Review and prepare final estimates from working drawings then check variances from original bill of quantities as specified in the contract for possible addition or deletion of quantities.

Accurately understanding the designs and drawings and preparing the material take off as per schedule of constructions.

In charge of Project Monitoring and Monthly Billings to client.

Prepare variations of timelines and BOQ between planned versus actual.

Preparation of recommendations for award of contractor packages.

Preparing and presenting cash flow and cost management advice to clients Interpreting and offering advice on contract.

Preparation of recommendations for award of contractor packages.

Agreement of final accounts on the projects.

Report all variations on timelines to the projects and implications on the same to the overall project costing and profitability.

Preparation of cost plans.

Giving feedback to the project manager if the project performance resulted to overrun the project.

COMPANY : 15] Erincor Development Corporation(Project:AGUS V HYDROELECTRIC POWER PLANT-( National Power Corporation )

POSITION: Cadet Engr/Eng’g Aid.

DATE: Marh 1983 – April 1986

Assist to site Engineers works such as preparations of rebar cutting schedule and to be approved by client inspector and Engineering design.

To track Daily Progress installation of rebars, formworks,welding, piping,mechanical installations, electrical and instrumentation works. And resources allocations, such as Manpower, Equipment and Materials utilization.

To assists As-built Drawing preparations and materials supplied reconciliation reports to client.

Preparations of rebar cutting schedule and to be approved by client inspector and Engineering design.

Material Expediting for site requirements per structure and area.

Assist in preparation of daily pouring schedule and concrete requirements to site.