Randall Patterson

**** *.*.**

th

Court

Cell # 954-***-**** Sunrise, FL 33351

Education: Graduated Florida Atlantic University 1980. Completed superintendent internship program in 1982 for Florida Business Centers. Procore, Blue Beam, Adobe Pro, Pro-log, Microsoft Project, Sure Track, Timberline, Sage, and Red Team. OSHA certified 2009 Prime Group Jeff Lee

4651 Sheridan Street Director of Construction

Hollywood, FL 33021 ( 954 ) 548 – 1564

January 2017 – Present

Superintendent / Project Manager

Autograph by Marriott – The Daytona, a 6-story post tension specialty 144 room hotel with restaurant valued at $28 million. Located across from racetrack has specialty items requiring precise coordination to accommodate abnormal lead times. Generated revised plan set submitted to City. Generated and implemented RFI’s in a constantly changing design. Scheduled all trades, verifying compliance with specifications and submittals. Working with FFE design team on specialty furnishings, changing wall and ceiling designs to ensure proper fit and finishes with material deliveries that maintain C.O. schedule. Review, negotiate and approve all change orders. Liaison with International Speedway Corporation Motorsports Design and Development Team to integrate Hotel along with integrate Hotel along with Mid - Rise and Garden Style Apartment complexes also being built by Prime Group as part of The Daytona One Development project. Implemented and monitored OSHA Safety program Generated three weeks look ahead and Project Duration schedules, as well as conducted weekly subcontractor and safety meetings. HRC Construction Corp. Hector Rodriguez

12555 Orange Drive President

Davie, FL 33330 954-***-****

October 2016 – January 2017

Superintendent / Project Manager

Comfort Suites 7 story valued at $12.6 million. Permitted project myself. Developed permanent Power plan with FPL Design Engineer. Completed site development using Vibro Replacement. Adjusted structural, MEP and Civil plans in conjunction with Engineers as conflicts in plans arose. Simultaneously coordinated design changes with owner and FFE company in Philadelphia. changing equipment selections, verifying correct submittals were given to City and contractors. Monitor all work to maintain quality and ensure all inspections passed. Generated all RFI’s on project, again working with Engineers and Architect to obtain resolution. Verify all equipment models correct prior to manufacture / shipment. Schedule delivery dates and monitor installation 2

of all MEP items as well as Specialty Items requested by owner. Maintained daily reports including safety meetings and weekly subcontractor coordination meetings as well as prepare monthly bank funding application. Initiated and enforced OSHA safety program. GSD Construction, Inc. Greg DeJohn

1475 Anglers Avenue President

Fort Lauderdale, FL 33312 (954) 728 - 5163

September 2015 to October 2016

Superintendent / Project Manager

Hampton Inn Pompano Beach 7 story. A post tension structural design project with load bearing masonry and sheer walls to 3

rd

floor which is time consuming. Developed Project Duration Schedule. Completed bid and project buy out process constructing project build team. Initiated Permit process, obtaining and starting Vibro Replacement Soil Stabilization and balance of site Development. Interacted with all engineers, architects and brand representatives changing plans accordingly issued revised plans as necessary resubmitting complete as built revisions to City insuring flawless C.O. inspection process. Coordinated with FFE Design team and owners through revisions to installation and opening. Monitored quality conducting monthly Brand Representative and Bank Inspections. Issued weekly 3 weeks Look Ahead updating Project Duration Schedules. Developed and enforced Safety Program to ensure OSHA compliance. Conducted weekly subcontractor coordination and safety meetings. Obtained approval on Structural, Civil, and MEP plan revisions. Participated in design process on 4 additional Hotels in Homestead, Florida City, West Palm Beach, and Clewiston Florida. Seawood Builders Chris Lipke

715 E. Hillsboro Blvd. Vice President

Deerfield Beach, FL 33441 954-***-****

(954) 421 – 4200

February 2013 - September 2015

Superintendent / Project Manager

Hampton Inn Biscayne 8 story Hotel and 8 story parking garage designed in post tension valued at

$14.9 million. Structure was usual Post Tension design with block infill making aggressive Duration Schedule possible. Completed site development, Installed Buck Hoist and continued to erect structure averaging a floor per week completion on schedule. and began FPL design process. Conducted weekly subcontractor coordination and safety meetings maintaining OSHA compliance. Conducted monthly OAC meetings coordinating revisions and Permit status. Project was on schedule until architect contracted TLC Engineering and MTCI plan review processors failed to acquire building permit allowing bank to fund the project. Returning after a 2-month delay completed project in revised Duration Schedule that included Building Infill caused by delay at cost to owners and investors. Transferred to another project until funding could be secured. Portico 3

in Sunrise valued at $78 million consisting of 4 six story and 2 five story apartment buildings with 2 five story parking garages. Main building design was tunnel form construction which is a daily minimum of 4,000 plus square feet being placed daily. Maintained safety program, scheduled trades, completed weekly reports to investors and prepare monthly bank draw requests. J.A.M Construction, Inc. John A. McKinney

4349 N.W. 19

th

Avenue President

Coconut Creek, FL 33316 (954) 410 - 9591

(950) 420 - 0465

March 2007 – February 2013

Superintendent/ Project Manager

Projects included a 2 story 46,000square foot office building in Weston, Fl. A $6.8 million 118,450 square foot five story tilt wall office building in Doral, FL. Southern Logistics shipping facility in Miami valued at $4.3 million. Sea Monarch seventeen story condominium concrete restoration project valued at $1.7 million. Native Sun Corporate office / warehouse 64,000 square foot $1.7 million in Hollywood, Fl. Completed eleven custom homes ranging from 3,000 to 7,500 square feet valued at $1.3 to $12.6 million. Bank United in Sunrise on schedule $3.7 million. Completed Sawgrass Landings, consisting of one 16-store strip mall and one 2 story office building plus a tilt wall 94,000 square foot L.A. Fitness. Completed Fountains of Miramar site development valued at $2.8 million. Started bid process and contractor qualifying while beginning site development for 18.7-acre Heron Bay Project. Completed site utilities value $ 3.2 million with 148 structures including drain fields in 2.4 months. Project consists of three 3 story tilt wall buildings, a single 2 story C.B.S. Building, a sixteen-store strip mall, and one SunTrust Bank complete value of $49.5 million. I supervised all of these simultaneously using three full underground crews, with separate tilt-wall and C.B.S. contractors. Completed tenant build outs post project completion in excess of $1.3 million. A 6,800 square foot Bank United in Sunrise Florida valued at $ 2.4 million. Maintained safety compliance and records on all projects. Stor – All Systems, Inc. John P. Judd

1375 W. Hillsboro Blvd. Director of Construction

Deerfield Beach, Florida 33442 (954) 592 – 3328

954-***-****

May 1992 – February 2007

National Field Supervisor

Completed projects in Florida, Georgia, Colorado, Virginia, and Washington D.C. Responsibilities included review of preliminary plans from architects and engineers to minimize discrepancies prior to permit application. Expedite bidding process and permitting processing in every state addressing comments and product submittals until permits were obtained. Supervise construction from site development and utility construction to C.O. while implementing as well as monitoring safety policies. Initiate plan revisions and review change orders, both from projects 4

built by Stor - All Construction and ones sub-contracted to outside G.C.’s up to 5 simultaneously. Interacted with governmental and state agencies verifying code compliance assuring no delays receiving Certificate of Occupancy upon completion of projects. Address all RFI’s, generate punch lists, issuing deficiency notices and taking whatever steps necessary to insure deficiencies were corrected. Review and mediate all change orders and back charges, finally prepare facilities for acquisition by management. Completed 23 projects in the five states on schedule, all within targeted budget allowing for unforeseen utility construction conditions. These projects ranged from $ 4.4 to 11.9 million. Implement and monitored OSHA safety programs in all states. S.T. Wicole Construction, Inc. David Poist

4340 N. W. 19

th

Avenue Vice President

Pompano Beach, FL 33319 ( 954) 530 - 4083

(954) 975 - 5117

February 1983 – April 1992

Superintendent

Completed two office/storage buildings in Lyons Business Park valued at $4.3 million, on schedule and under budget. I completed Boca East project consisting of 157 high-end custom homes ranging from $765,000 to $3.1 million. Interfaced with architects, engineers, building officials and owners on RFI’s and Change orders. Completed three Southern Storage facilities ranging from $2.1 to $ 7.6 million, completed close to schedule and budget under extremely adverse conditions. Florida Atlantic University, state project # BR650, child development center valued at $18.6 million, completed on schedule and under budget utilizing on campus inspecting engineers. Broward County Animal Control Center completed on schedule and close to budget despite having to follow guidelines issued by the F.A.A. and Naval Department. Project valued at $12.7 million. Bank of America project in Pompano Beach, Federal Hwy branch $4.8 million. Coconut Creek High School valued at $21.6 million including $2.3 million in site development and infrastructure. All projects completed without liquidated damages. I completed eight spec homes interacting with customers, architects, and engineers ranging from $1.1 to $2.4 million. Wachovia Bank projects in Fort Lauderdale and Coral Springs valued at $2.4 and 2.7 million competed on schedule under budget.

Florida Business Center George Johnston

3343 W. Commercial Blvd. Director of Construction

Fort Lauderdale, FL. 33309 (954) 913 - 0799

(954) -232 -7472

June 1984 – February 1994

Superintendent

Pineview Lakes Apartment project consisting of 12 three story buildings with clubhouse including Olympic pool, an eighteen-acre excavated lake in addition to the infrastructure. Simultaneously supervised 26 custom single-family homes ranging from 3,300 to 5,850 square feet valued at

$528,000 to $924,000 on the north side of the lake. Project was adjacent to Adios Country Club at a combined value of $51.7 million. It was completed on schedule and under budget. Cypress Lakes 5

Apartment project, consisting of eleven three story Building’s. Site development and structures only, left to start Pine View Lakes. The Exchange, project consisted of six single stories and two 2 story buildings with Alcoa Aluminum exterior panels valued at $41.3 million. Powerline Business Park project consisted of four single story office/warehouse Building’s totaling 343,000 square feet valued at $4.2 million. Completed three Kentucky Fried Chicken restaurants in Fort Lauderdale area valued at $1.4 to 1.7 million each.

Excellent references furnished upon request.