Mr. MUKESH KUMAR C Eng [India], PMP [PMI, USA]
TITLE Sr. MANAGER – OPERATIONS (O&G PROJECTS)
COMPANY AFCONS INFRASTRUCTURE LTD.
Industry sector Oil and Gas / Power / Energy
Highest Degree Mechanical Engineering (HEAT POWER)
Phone/ Email/Skype +91-877*******/**************@*****.***/Mukesh_kr.
Functional Area Site Engineering / Project Management
Strength Optimistic & Hard working
Total Experience 16 Year(s)
PROFILE
Work Experience : 14 years
Experience Classifications
12yrs O & G Project Management
3yrs Interface Management
12yrs Construction Management
14yrs Packages (Rotating + Static)
10yrs Hook-up & Commissioning
Employment History
AFCONS INFRASTRUCTURE LTD. as MANAGER (PMT)
Oct. 2011 till Date
AFCONS GUNANUSA JOINT VENTURE as MANAGER (PMT)
Jan 2010 till Sep. 2011
LARSEN & TOUBRO LTD. as SR. PROJECT ENGINEER
Feb 2006 to Dec 2009
ISGEC YAMUNANAGAR as ASST. ENGINEER
Jul 2003 to Jan 2006
Professional profile
PROFESSIONAL CERTIFICATION
PMP
Project Management Institute (USA)
Chartered Engineer [India]
Institution of Engineers (INDIA)
GLOBAL LITERACY
INDONESIA, MALAYSIA, SINGAPORE, JAPAN & VIETNAM
PROFESSIONAL MEMBERSHIP
Membership ID - 4453193
PROJECT MANAGEMENT INSTITUTE - www.pmi.org
Corporate Member - AM134810–0
INSTITUTION OF ENGINEERS (INDIA) – www.ieindia.org
TECHNICAL QUALIFICATION
Graduate in Mechanical Engineering (Heat Power)
Institution of Engineers (INDIA) - CGPA-7/10
Diploma in Mechanical Engineering
State Board of Technical Education, Haryana (INDIA) - 75.31%
Basic Profile Competency
Planning Software knowledge : Primavera Project Management
Computer Proficiency : Ms-office package, Auto CAD & CNC Programming
System Awareness : ISO-9001, OHSAS-18001
Code Awareness : ASME, AWS & API Codes of Engineering & Construction
EPC Project Experience with Critical Packages
HRD Process Platform - Two PGC Trains (Solar Mars 100 Gas Turbine + KHI Three stage Compressor)
ICPR Process Platform - One PGC Train (Solar Titan 130 Gas Turbine + KHI Three stage compressor)
One Power Generation Unit (SGT-400 Gas Turbine + Convertem Generator)
NQRC Project - One PGC Train (Solar Titan 130 Gas Turbine + KHI Three stage compressor)
VEDP Project - Three Booster Compressors (SGT 400 Gas Turbine + Two stages Compressor)
Two High Pressure Compressors (SGT 400 Gas Turbine + Three stages compressor)
PROJECT ROLE AND PROFILE
MANAGER – OPERATIONS
Main Role
• Site In-charge (barge rep) for offshore campaign.
• Project delay analysis & generating arbitration basis.
• Engineering/Vendor Co-ordination
• Purchase Specification Approval
• Managing Internal and Interface Issue
• Pre-commissioning Lead
• Dy. Commissioning Manager / Mech. Manager for Installation Erection and Commissioning of all Static packages and Rotary machineries
• Lead role for String Test of Turbo machineries (Process Gas Compressor Train- Gas Turbine + Compressor
Skill set includes
• Field construction and management expertise
• Very positive attitude, willingness to work in a team as well as lead a team
• Accepts ownership of assignments, strives to manage projects in the best interest of organization while meeting the customer expectations. I was continually rated as Highly Valued.
• Involvement in plant erection, commissioning and start-up.
• Participate in progress meetings with customer, vendor meetings and inter-discipline meetings.
• Strong experience in Oil & Gas Upstream process Gas compression facilities/platform fabrication, pre-commissioning, commissioning and final handover to client.
• Engineering Co-Ordination for Rotating & Static equipments during different stages of project.
• Familiar with relevant international codes and standards such API, ASME, TEMA, AWS etc.
• Sound understanding of Train control Logics, Anti-surge control system, Cause and effect diagrams.
• Co-ordinate HAZID meeting and approval process.
Skill Sub-set includes
• Witness shop inspection and testing.
• Attend design reviews, model reviews
• Coordinate and plan resources for execution of project.
• Provide pro-activeness, creativity and efficiency in project execution.
• Progress reporting, raise Technical Queries (TQ), high-light scope changes.
PROFESSIONALY TRAINED THROUGH
Technical Qualification:
Graduate in Mechanical Engineering (Heat Power)
Institution of Engineers (INDIA)
(CGPA-7/10) in winter, 2007
Diploma in Mechanical Engineering
Secured Distinction from Govt. Polytechnic Sirsa, Haryana.
75.31% in June, 2003
Special Project study done:
Vibration Analysis (Offshore Gas compression System)
Certification obtained:
ASNT LEVEL-II in
Radiographic Testing
Ultrasonic Testing
Magnetic Particle Test
Dye Penetrate Testing
STCW-2010 Certification under the authority of the Directorate General, Ministry of Shipping, Govt. of India in
Fire Prevention & Fire Fighting
Personal Survival Techniques
Elementary First Aid
Helicopter Underwater Escape Training
Training & Seminars attended:
Dupont HSE training certificates
Dekra Process Safety training
Centrifugall Compressors
Basics of Rotary Equipments
Laser Alignment and Condition Monitoring
PVELITE (Static Equipment Design)
Basics of Piping
Hazardous area classification
Safety at work and material handling
Communication skill and Business Etiquettes
MAJOR OIL AND GAS PROJECT HANDLED
Project 1: “Life Extension of Well Head Platforms Project - USD 166 Million” ONGC
Construction Manager – O&G DIV. AFCONS January 2016 to till
The scope of work include Surveys (pre-engineering, pre-construction/pre-installation and post- installation) Design, Engineering, Procurement, Fabrication, Load Out, Tie down/Sea fastening Tow-out/Sail-out, Transportation, Installation, Hook-up, Testing, Pre-commissioning, Commissioning.
Project 2: “Capacity Expansion Project - USD 25 Million” CRL Terminals Pvt Ltd. (A Royal VOPAK Company)
Manager (Mechanical) – O&G DIV. AFCONS October 2015 to June 2016
The scope of work include Surveys (Pre-construction/pre-installation and post- installation) Procurement, Fabrication, Load Out, Transportation, Installation, Hook-up, Testing, Pre-commissioning, Commissioning of rotating and static Packages.
Project 3: “HRD PROCESS PLATFORM - USD 293 Million” ONGC
Manager (PMT) – O&G DIV. AFCONS December12 to July15
The scope of work include Surveys (pre-engineering, pre-construction/pre-installation and post- installation) Design, Engineering, Procurement, Fabrication, Load Out, Tie down/Sea fastening Tow-out/Sail-out, Transportation, Installation, Hook-up, Testing, Pre-commissioning, Commissioning of Process Separation and Two Process Gas Compressor 2X1.6 mmscmd(SOLAR Gas Turbine (MARS 100) + KAWASAKI Compression Units)
Project 4: “Asam Pipeline Project - USD 66 Million” ONGC
Manager (Commissioning) – O&G DIV. AFCONS January 2013 to March 2013
• Managing Internal and Interface Issue
• Pre-commissioning Lead
• Commissioning Manager
Project 5: “MHS RD – ICPR PROCESS PLATFORM - USD 366 Million” ONGC
Manager - Mechanical – AGJV January 2010 to October 2012
The project scope of works is the Engineering, Procurement, Construction, Commissioning and Installation of the ICP-R platform, Flare Tripod and connecting bridge. The ICP-R platform consist Main Structural Frame, Building Module, Process Module, Turbo Generator (SIEMENS GAS TURBINE -100) and Process Gas Compressor 1X2.3 mmscmd (SOLAR Gas Turbine (TITAN 130) + KAWASAKI Compression Units) Gas Dehydration Package, Produced Water Conditioning System etc.
Project 6: “POWER GENERATION PLANT” UNIVERSAL BIO-MASS ENERGY PVT LTD.
Manager - Commissioning September 2009 to January 2010
The project scope of works is the Installation and commissioning of the 67 MT (@67 bar & 475o C) Steam Generator (ISGEC JOHN THOMPSON) and 14.5 MW Steam Turbine Generator (QJPS) along with other power plant accessories.
Project 7: “AL-SHAHEEN FIELD DEVELOPMENT PROJECT” MEARSK OIL QATAR
Sr. Project Engineer (Mechanical) – E&C DIV. L&T June 2009 to August 2009
Completion of project including Fabrication, Installation and commissioning of two well head (ASHA & ASIA) platforms, complete with rotary/static equipment, piping systems, exotic materials, control and instrumentation, and other utilities. Modules include Crude Oil Separation, Transfer Pump, Chemical Injection and auxiliaries, living quarters, etc.
Project 8: “NQ RECONSTRUCTION PROJECT - USD 125 Million” ONGC
Sr. Project Engineer (Mechanical) - E&C DIV. L&T December 2007 to June 2009
This was a fast track project where the time between reception of major equipment and pre-commissioning test is only two month. Project including Fabrication and commissioning of one process gas compressor module with SOLAR-KHI (GT-TITAN 130) Compression package 1 X 2.4 mmscmd and will be installed at NQ PROCESS COMPLEX - MUMBAI HIGH NORTH FIELD
Project 9: “VASAI EAST DEVELOPMENT PROJECT - USD 170 Million” ONGC
Project Engineer (Mechanical) - E&C DIV. L&T February 2007 to December 2007
A Project which was including Fabrication and commissioning of five Process Gas Compression Trains (Three compressor modules - Single Booster, Double Booster & High Pressure) with five no. of Gas Compression Units (SIEMENS Gas Turbine (SGT- 400) + Compressor) for BCPA-2 platform at MUMBAI HIGH.
Project 10: “MH-B&S-4 WELL HEAD PLATFORM PROJECT” ONGC
Project Engineer (Mechanical) - E&C DIV. L&T February 2006 to February 2007
Completion of project was including Fabrication and commissioning of four no. of well head platforms and jacket along with one heli-deck presently running in Mumbai High Field. The BF platform having the heli-deck, building module and equipped with air compression facility (AIRPACK B.V., Netherlands) & small power generation, Mechanical Handling System, Fire & Safety System.
OTHER PROJECTS EXECUTED IN ISGEC, YAMUNA NAGAR
Project 1: “12000T HYDRAULIC PRESS” HACO, BELGIUM
Project 2: “DOWN COILER” JINDAL STAINLESS LTD.
Project 3: “BULLET PRESS” DRDO, KANPUR
Project 4: “COIL TRANSFER BEAM” TISCO, JAMSHEDPUR
RESPONSIBILITIES PERFORMED IN ISGEC, YAMUNA NAGAR July 2003 to January 2006
Discussion for priorities with higher management
Time estimation for planned and nailed activities
Shop floor plan project-wise, weekly basis
Estimation for welding consumables for respective jobs
Work allocation
Co-ordination with internal depts. TPI and customer representative
Verification of contractor billing
Personal Details
Address : 601-Shivshakti Apartments, Sundarvan Lane, Off Lokhandwala Comp.,
Andheri (W), Mumbai - 400053 (INDIA)
Language Known : English, Indonesian, Hindi, Punjabi, Gujarati
Passport detail : Passport no. – Z3624279
Issued By- REPUBLIC OF INDIA at AMRITSAR