Post Job Free
Sign in

Manager Project

Location:
Mumbai, Maharashtra, India
Posted:
August 02, 2019

Contact this candidate

Resume:

Mr. MUKESH KUMAR C Eng [India], PMP [PMI, USA]

TITLE Sr. MANAGER – OPERATIONS (O&G PROJECTS)

COMPANY AFCONS INFRASTRUCTURE LTD.

Industry sector Oil and Gas / Power / Energy

Highest Degree Mechanical Engineering (HEAT POWER)

Phone/ Email/Skype +91-877*******/**************@*****.***/Mukesh_kr.

Functional Area Site Engineering / Project Management

Strength Optimistic & Hard working

Total Experience 16 Year(s)

PROFILE

Work Experience : 14 years

Experience Classifications

12yrs O & G Project Management

3yrs Interface Management

12yrs Construction Management

14yrs Packages (Rotating + Static)

10yrs Hook-up & Commissioning

Employment History

AFCONS INFRASTRUCTURE LTD. as MANAGER (PMT)

Oct. 2011 till Date

AFCONS GUNANUSA JOINT VENTURE as MANAGER (PMT)

Jan 2010 till Sep. 2011

LARSEN & TOUBRO LTD. as SR. PROJECT ENGINEER

Feb 2006 to Dec 2009

ISGEC YAMUNANAGAR as ASST. ENGINEER

Jul 2003 to Jan 2006

Professional profile

PROFESSIONAL CERTIFICATION

PMP

Project Management Institute (USA)

Chartered Engineer [India]

Institution of Engineers (INDIA)

GLOBAL LITERACY

INDONESIA, MALAYSIA, SINGAPORE, JAPAN & VIETNAM

PROFESSIONAL MEMBERSHIP

Membership ID - 4453193

PROJECT MANAGEMENT INSTITUTE - www.pmi.org

Corporate Member - AM134810–0

INSTITUTION OF ENGINEERS (INDIA) – www.ieindia.org

TECHNICAL QUALIFICATION

Graduate in Mechanical Engineering (Heat Power)

Institution of Engineers (INDIA) - CGPA-7/10

Diploma in Mechanical Engineering

State Board of Technical Education, Haryana (INDIA) - 75.31%

Basic Profile Competency

Planning Software knowledge : Primavera Project Management

Computer Proficiency : Ms-office package, Auto CAD & CNC Programming

System Awareness : ISO-9001, OHSAS-18001

Code Awareness : ASME, AWS & API Codes of Engineering & Construction

EPC Project Experience with Critical Packages

HRD Process Platform - Two PGC Trains (Solar Mars 100 Gas Turbine + KHI Three stage Compressor)

ICPR Process Platform - One PGC Train (Solar Titan 130 Gas Turbine + KHI Three stage compressor)

One Power Generation Unit (SGT-400 Gas Turbine + Convertem Generator)

NQRC Project - One PGC Train (Solar Titan 130 Gas Turbine + KHI Three stage compressor)

VEDP Project - Three Booster Compressors (SGT 400 Gas Turbine + Two stages Compressor)

Two High Pressure Compressors (SGT 400 Gas Turbine + Three stages compressor)

PROJECT ROLE AND PROFILE

MANAGER – OPERATIONS

Main Role

• Site In-charge (barge rep) for offshore campaign.

• Project delay analysis & generating arbitration basis.

• Engineering/Vendor Co-ordination

• Purchase Specification Approval

• Managing Internal and Interface Issue

• Pre-commissioning Lead

• Dy. Commissioning Manager / Mech. Manager for Installation Erection and Commissioning of all Static packages and Rotary machineries

• Lead role for String Test of Turbo machineries (Process Gas Compressor Train- Gas Turbine + Compressor

Skill set includes

• Field construction and management expertise

• Very positive attitude, willingness to work in a team as well as lead a team

• Accepts ownership of assignments, strives to manage projects in the best interest of organization while meeting the customer expectations. I was continually rated as Highly Valued.

• Involvement in plant erection, commissioning and start-up.

• Participate in progress meetings with customer, vendor meetings and inter-discipline meetings.

• Strong experience in Oil & Gas Upstream process Gas compression facilities/platform fabrication, pre-commissioning, commissioning and final handover to client.

• Engineering Co-Ordination for Rotating & Static equipments during different stages of project.

• Familiar with relevant international codes and standards such API, ASME, TEMA, AWS etc.

• Sound understanding of Train control Logics, Anti-surge control system, Cause and effect diagrams.

• Co-ordinate HAZID meeting and approval process.

Skill Sub-set includes

• Witness shop inspection and testing.

• Attend design reviews, model reviews

• Coordinate and plan resources for execution of project.

• Provide pro-activeness, creativity and efficiency in project execution.

• Progress reporting, raise Technical Queries (TQ), high-light scope changes.

PROFESSIONALY TRAINED THROUGH

Technical Qualification:

Graduate in Mechanical Engineering (Heat Power)

Institution of Engineers (INDIA)

(CGPA-7/10) in winter, 2007

Diploma in Mechanical Engineering

Secured Distinction from Govt. Polytechnic Sirsa, Haryana.

75.31% in June, 2003

Special Project study done:

Vibration Analysis (Offshore Gas compression System)

Certification obtained:

ASNT LEVEL-II in

Radiographic Testing

Ultrasonic Testing

Magnetic Particle Test

Dye Penetrate Testing

STCW-2010 Certification under the authority of the Directorate General, Ministry of Shipping, Govt. of India in

Fire Prevention & Fire Fighting

Personal Survival Techniques

Elementary First Aid

Helicopter Underwater Escape Training

Training & Seminars attended:

Dupont HSE training certificates

Dekra Process Safety training

Centrifugall Compressors

Basics of Rotary Equipments

Laser Alignment and Condition Monitoring

PVELITE (Static Equipment Design)

Basics of Piping

Hazardous area classification

Safety at work and material handling

Communication skill and Business Etiquettes

MAJOR OIL AND GAS PROJECT HANDLED

Project 1: “Life Extension of Well Head Platforms Project - USD 166 Million” ONGC

Construction Manager – O&G DIV. AFCONS January 2016 to till

The scope of work include Surveys (pre-engineering, pre-construction/pre-installation and post- installation) Design, Engineering, Procurement, Fabrication, Load Out, Tie down/Sea fastening Tow-out/Sail-out, Transportation, Installation, Hook-up, Testing, Pre-commissioning, Commissioning.

Project 2: “Capacity Expansion Project - USD 25 Million” CRL Terminals Pvt Ltd. (A Royal VOPAK Company)

Manager (Mechanical) – O&G DIV. AFCONS October 2015 to June 2016

The scope of work include Surveys (Pre-construction/pre-installation and post- installation) Procurement, Fabrication, Load Out, Transportation, Installation, Hook-up, Testing, Pre-commissioning, Commissioning of rotating and static Packages.

Project 3: “HRD PROCESS PLATFORM - USD 293 Million” ONGC

Manager (PMT) – O&G DIV. AFCONS December12 to July15

The scope of work include Surveys (pre-engineering, pre-construction/pre-installation and post- installation) Design, Engineering, Procurement, Fabrication, Load Out, Tie down/Sea fastening Tow-out/Sail-out, Transportation, Installation, Hook-up, Testing, Pre-commissioning, Commissioning of Process Separation and Two Process Gas Compressor 2X1.6 mmscmd(SOLAR Gas Turbine (MARS 100) + KAWASAKI Compression Units)

Project 4: “Asam Pipeline Project - USD 66 Million” ONGC

Manager (Commissioning) – O&G DIV. AFCONS January 2013 to March 2013

• Managing Internal and Interface Issue

• Pre-commissioning Lead

• Commissioning Manager

Project 5: “MHS RD – ICPR PROCESS PLATFORM - USD 366 Million” ONGC

Manager - Mechanical – AGJV January 2010 to October 2012

The project scope of works is the Engineering, Procurement, Construction, Commissioning and Installation of the ICP-R platform, Flare Tripod and connecting bridge. The ICP-R platform consist Main Structural Frame, Building Module, Process Module, Turbo Generator (SIEMENS GAS TURBINE -100) and Process Gas Compressor 1X2.3 mmscmd (SOLAR Gas Turbine (TITAN 130) + KAWASAKI Compression Units) Gas Dehydration Package, Produced Water Conditioning System etc.

Project 6: “POWER GENERATION PLANT” UNIVERSAL BIO-MASS ENERGY PVT LTD.

Manager - Commissioning September 2009 to January 2010

The project scope of works is the Installation and commissioning of the 67 MT (@67 bar & 475o C) Steam Generator (ISGEC JOHN THOMPSON) and 14.5 MW Steam Turbine Generator (QJPS) along with other power plant accessories.

Project 7: “AL-SHAHEEN FIELD DEVELOPMENT PROJECT” MEARSK OIL QATAR

Sr. Project Engineer (Mechanical) – E&C DIV. L&T June 2009 to August 2009

Completion of project including Fabrication, Installation and commissioning of two well head (ASHA & ASIA) platforms, complete with rotary/static equipment, piping systems, exotic materials, control and instrumentation, and other utilities. Modules include Crude Oil Separation, Transfer Pump, Chemical Injection and auxiliaries, living quarters, etc.

Project 8: “NQ RECONSTRUCTION PROJECT - USD 125 Million” ONGC

Sr. Project Engineer (Mechanical) - E&C DIV. L&T December 2007 to June 2009

This was a fast track project where the time between reception of major equipment and pre-commissioning test is only two month. Project including Fabrication and commissioning of one process gas compressor module with SOLAR-KHI (GT-TITAN 130) Compression package 1 X 2.4 mmscmd and will be installed at NQ PROCESS COMPLEX - MUMBAI HIGH NORTH FIELD

Project 9: “VASAI EAST DEVELOPMENT PROJECT - USD 170 Million” ONGC

Project Engineer (Mechanical) - E&C DIV. L&T February 2007 to December 2007

A Project which was including Fabrication and commissioning of five Process Gas Compression Trains (Three compressor modules - Single Booster, Double Booster & High Pressure) with five no. of Gas Compression Units (SIEMENS Gas Turbine (SGT- 400) + Compressor) for BCPA-2 platform at MUMBAI HIGH.

Project 10: “MH-B&S-4 WELL HEAD PLATFORM PROJECT” ONGC

Project Engineer (Mechanical) - E&C DIV. L&T February 2006 to February 2007

Completion of project was including Fabrication and commissioning of four no. of well head platforms and jacket along with one heli-deck presently running in Mumbai High Field. The BF platform having the heli-deck, building module and equipped with air compression facility (AIRPACK B.V., Netherlands) & small power generation, Mechanical Handling System, Fire & Safety System.

OTHER PROJECTS EXECUTED IN ISGEC, YAMUNA NAGAR

Project 1: “12000T HYDRAULIC PRESS” HACO, BELGIUM

Project 2: “DOWN COILER” JINDAL STAINLESS LTD.

Project 3: “BULLET PRESS” DRDO, KANPUR

Project 4: “COIL TRANSFER BEAM” TISCO, JAMSHEDPUR

RESPONSIBILITIES PERFORMED IN ISGEC, YAMUNA NAGAR July 2003 to January 2006

Discussion for priorities with higher management

Time estimation for planned and nailed activities

Shop floor plan project-wise, weekly basis

Estimation for welding consumables for respective jobs

Work allocation

Co-ordination with internal depts. TPI and customer representative

Verification of contractor billing

Personal Details

Address : 601-Shivshakti Apartments, Sundarvan Lane, Off Lokhandwala Comp.,

Andheri (W), Mumbai - 400053 (INDIA)

Language Known : English, Indonesian, Hindi, Punjabi, Gujarati

Passport detail : Passport no. – Z3624279

Issued By- REPUBLIC OF INDIA at AMRITSAR



Contact this candidate