EXECUTIVE SUMMARY

OBJECTIVE

• To apply my knowledge and utilize my acquired professional skills in the development, direction, and execution of construction projects and ensuring customer satisfaction and to be have an excellent contribution to the progress of the company.

PROFILE SUMMARY

• Competent, diligent & result oriented civil engineer professional in the field of supervision, project coordination & project execution with a solid background in design and works preparation.

• Proven effective in construction management, a meticulous and systematic worker with good organization skills, focused on cost efficiency and progress.

• Prepare Project Baseline Schedule and Detailed Plan in Primavera.

• Loading of resources - materials, labor, plant and machinery needed to carry out a construction project according to the BOQ, drawings, plans, & technical specification

• Preparing project execution plans and construction sequence

• Prepare construction schedule of materials, labor & equipment

• Estimating and preparing quantity survey covering tender preparations, quantity take off, variation order, progress billing, valuation accomplishment and invoicing

• Review the technical documents from vendors & subcontractor and managing all subcontracting works (contract, progress monitoring & control)

• Preparing and submitting weekly progress report.

• Preparing and submitting to the client the Monthly Report which include of all engineering and procurement status, schedule and progress Summary (plan & actual), document control register, HSE statistic, cost and contract, equipment report and progress photograph

• Hardworking and can work under pressure with minimum amount of supervision.

• Working independently or as part of a team and highly motivated to provide an excellent result PROFESSIONAL EDUCATION

• Jun 1982 – Apr 1987 Bachelor of Science in Civil Engineering - Baliuag Colleges, Philippines

• Mar 1985 – Jun 1985 Industrial Electricity - National Manpower & Youth Council, Philippines CAREER SUMMARY

• 09/2016 – 02/2019 Planning Engineer, QS, Technical Engineer Julius Berger Nigeria Plc

• 05/2009 – 08/2016 Planning Engineer, Quantity Surveyor Julius Berger Nigeria Plc

• 07/2006 – 03/2009 Planning Engineer, Quantity Surveyor I.T.B. Nigeria Limited

• 02/2001 – 03/2005 Site Engineer, Quantity Surveyor Arabian Oil & Gasfield Services

• 09/1994 – 12/1999 Site Engineer, Quantity surveyor Al-Zeera International Pools

• 10/1987 – 08/1994 Site Engineer, Estimator CEEMM Construction Corp. CERTIFICATION

• Registered Civil Engineer Licensed No. 0064426 – since September 1992

• 3rd Class Building Wiring Electrician Certificate No. 03-3-85-0850 – Since August 1985 Page 2

CAREER HISTORY

Julius Berger Nigeria Plc Lagos Nigeria

Planning Engineer, Scheduler, Quantity Surveyor, Technical Office Engineer Sep. 2016 - Feb. 2019 Project

• Rehabilitation, Reconstruction and Expansion of Lagos - Ibadan Dual Carriageway Section 1 (Lagos

- Shagamu) 44 km

• Proposed 20 Storey Head Office Development (Lagos Famfa Oil Tower)

• Rehabilitation of 77 km long carriageway from Lagos to Abeokuta Duties & Responsibilities

• Preparing project execution plans and construction sequence

• Preparing and submitting to the client the weekly progress report & weekly photo

• Do planning for new incoming projects incorporating the engineering design, procurement aspect, and construction project to create a master program schedule

• Loading of resources - materials, labor, plant and machinery needed to carry out a construction project according to the BOQ, drawings, plans, and technical specification

• Preparing and submitting to the Client the actual weekly man-hours with direct and indirect man- hours

• Preparing and submitting to the client the Monthly Report which include of all engineering and procurement status, schedule and progress Summary (plan & actual), document control register, HSE statistic, cost and contract, equipment report and progress photograph Julius Berger Nigeria Plc Lagos Nigeria

Planning Engineer, Scheduler, Quantity Surveyor May 2009 – Aug. 2016 Project

• EPCC of Revamp of NLNG MOF Jetty 2 Facilities Project

• EPCC of Marine Control Building & VTIMS Project for Nigeria LNG Limited

• EPC of an Airfield (Bonny River Terminal Airstrip) for Nigeria LNG Limited on Bonny Island

• RA 238 Rotator Apartment 3 Storey Building (10 buildings)

• EPC of RA Hospital Laboratory Extension

• Bonny Integrated Business Complex Phase 1 Site Preparation and Jetty Phase 1

• Clubhouse Extension Modification and Expansion

• Civil Works for Lighting Upgrade NLNG Jetty 1 & 2 Duties & Responsibilities

• Do planning for new incoming projects incorporating the engineering design, procurement aspect, and construction project to create a master program schedule

• Loading of resources - materials, labor, plant and machinery needed to carry out a construction project according to the BOQ, drawings, plans, and technical specification

• Weekly updating all activities and scheduling the progress of the project comparing the schedule % complete versus performance % complete (plan % versus actual %)

• Preparing and estimating the tender document

• Preparation of claims change and extra orders

• Preparing and submitting monthly valuation (value of work done) to the Client

• Preparing and submitting to the Client the actual weekly man-hours with direct and indirect man- hours

• Preparing and submitting to the client the Monthly Report which include of all engineering and procurement status, schedule and progress Summary (plan & actual), document control register, HSE statistic, cost and contract, equipment report and progress photograph Page 3

I.T.B. Nigeria Limited Lagos Nigeria

Planning Engineer, Scheduler, Quantity Surveyor Jul. 2006 – Mar. 2009 Project

• Milan Intercontinental Hotel 24th Storey building

• Waves Office Projects10th Storey (4 building)

• Ocean Parade Phase II 12th Storey (4 building)

• UACN Apartment 7th Storey (2 building)

• Le Meridien Hotel 16th Storey building

Duties & Responsibilities

• Preparing master schedule and detailed schedule for the new project which includes activity ID, activity name, original duration, baseline project start, baseline project finish, activity logic and total float

• Loading of resources - materials, labor, plant and machinery needed to carry out a construction project, plans, and technical specification.

• Creating schedule of rates items (SOR), rate analysis (Global & Site Level) and resources rate estimate

• Monitoring site progress through inputting actual date of activity start and finish, actual percentage work done, actual expenses, and actual resources consumption.

• Updating and scheduling the site progress status and directly reported to the Cost Control Manager.

• Recording daily resources consumption (materials, labor, tools & equipment)

• Inputting daily requisition which linked directly to inventory section

• Preparing weekly and monthly report such as resources contribution, cost breakup, cost variance, resource consumption, daily progress, monthly program, materials requisition, and material job cost.

• Preparing quotations, work orders, measuring work and billing for subcontractor Arabian Oil & Gasfield Services LLC Ruwi, Oman

Site Engineer, Quantity Surveyor Feb. 2001 – Mar. 2005 Project

• Construction of administration building & warehouse

• Equipment foundation for pumps, transformers, hypo chloric generators and tanks foundation, cable trenches, slab works, stair and flat form, and other accessory offsite works

• Building construction and chemical storage at Oman Cement Corporation

• Construction twin villa of Saada Al-Aufy

• Ministry of Defense car park construction

• Maintenance projects such as steel structures, concrete structures, safety fences, and all other works categorized as maintenance work.

Duties & Responsibilities

• Attending project progress site meeting with the clients and/or consultants

• Taking appointment to the clients for the new project’s inquiries

• Preparing quotation for new projects and estimating bill of quantity

• Daily supervising and monitoring the status of the site

• Preparing and submitting weekly and monthly report to the Project Manager (i.e. progress of every activity, summary progress percentage, man-hours report, cost report, etc.)

• Quantity survey and estimating of new change orders

• Do monthly invoicing on progress completed work

Al-Zeera International Pools Manama, Bahrain

Site Engineer, Quantity Surveyor, Sales Engineer Sep. 1994 – Dec. 1999 Project

• Semi Olympic pool for H.H. SHK Hamad Bin Salman Al Khalifa Page 4

• Three swimming pools with Jacuzzi for Nasser Hassa Compound

• Seven swimming pool for Abdul Nabi Compound

• Elevated Pool Al-Qaed Apartelle

• Semi Olympic overflow type to Mustafa Jalali

• Hospital construction, expansion and renovation of Dr. Osama Almoayyed

• Construction of artificial lagoons and landscaping works for Col. Salman Zayani Duties & Responsibilities

• Submit weekly and monthly transparent report to the Director of Operation about the progress of the project

• Attend project site meeting and appointment with clients and/or consultants

• Responsible in Project production and quality monitoring

• Responsible in completion and turn-over of the project to the client

• Responsible in commissioning and demonstration of the project

• Responsible in after-sales maintenance of the project

• Design structures and hydraulic for water filtration systems of swimming pools, fountains, artificial lagoons, waterfalls, water walls, water features and other associated facilities

• Landscaping design and construction

• Estimate and prepare quotation for swimming pool and SPA Construction, water feature and renovation work

• Prepare list of manpower and their scope of work for everyday work schedule

• Procure and controlling of materials, tools, equipment’s, and chemicals

• Marketing and sales of products and services of the following categories: SBD Products for concrete repair and restoration, Industrial Coating Application, Mathios décor stone and refractories, Hayward and Certikin Products such as Pumps, Heat Pump, Blower, Filters, Chlorinator, Electric and Gas Heaters, Underwater light, Fountains, and Water Chillers CEEMM Construction Corporation Manila, Philippines Site Engineer, Estimator Oct. 1987 - Aug. 1994

Project

• Construction of warehouse and canteen building at San Miguel Corporation

• Boiler & Control House at Pure foods Corporation

• Installation of Gen Set House and associated equipment at Philippine Long Distance Telecommunication

• Construction of elevated water tank, caustic soda tank and piping works at Polyphosphate Corporation

• Installation of antenna tower for Globe and Smart Communications, Incorporation

• Pipelines repainting & other associated works at Petron Refineries in Limay, Bataan

• Maintenance Works at Caltex Refineries & Caltex Main Office

• Maintenance Services at Lungs Center Hospital of the Philippines Duties & Responsibilities

• Manage and supervise construction of the manufacturing facilities such as the Production building, Administration building, Canteen building, Generator house, Warehouse building, roads and drainage, rip rapping, elevated water tank, deep well drilling, & water distribution system

• Estimating the Bill of Quantity (BOQ) of materials

• Prepare program of work in Bar Chart, PERT-CPM, Manpower Distribution and Cash Flow Diagram

• Preparing project costing and scheduling of payments

• Inspection and Payment approval of the progress billing presented by the sub-contractor

• Quality control of materials to be applied/purchased for the project

• Supervise, monitor and prepare weekly progress report

• Coordinate with the resident inspector regarding work schedule Page 5

SKILLS

• Excellent knowledge of Primavera P6 software and Microsoft Project Professional, AutoCAD / AutoCAD Civil 3D (Quantity Survey) and Julian Program - ERC Equipment

• Excellent knowledge in Excels 2016, Word 2016, Outlook 2016 & Web Base ERP Solution

• Excellent knowledge in project management, scheduling, project control, tracking & measurement in vertical & horizontal construction projects

• Excellent problem-solving skills, highly organized and leadership skills PERSONAL PROFILE

• Date of Birth: 07/02/1965

• Marital Status: Married

• Nationality: Filipino

• Known Language: English, Tagalog

• Hobby: Playing musical instrument and arranging musical note

• Passport: EC6261873

SEMINARS / COURSES ATTENDED

• 2018 - Primavera P6 Professional Advance Rel 16 Ed 1 Oracle University, Online Course

• 2018 - Primavera Advanced Training P6 Rel 16 Julius Berger Nigeria Plc, Abuja, Nigeria

• 2014 – Project Management in Primavera P6 Rel 8.3 First Fossil Nigeria Limited, Nigeria

• 2010 - Platinum Safety Award Julius Berger Nigeria Plc., Nigeria

• 2009 - Primavera Project Management Adv Course Total Technology Consultants, Nigeria

• 2006 - Project and Contract Management EKO Hotel and Suites, Lagos, Nigeria

• 2005 - AutoCAD version 2005 UIST, Baliuag, Bulacan, Philippines

• 1993 - Structural Analysis & Design Quality Computer System, Philippines

• 1992 - Construction Project Management Quality Computer System, Philippines

• 1987 - Seminar on Seismic Analysis Allied Professional Center, Philippines VOLUNTEER WORK

• 2018 - Basic First Aid Nigerian Red Cross Society, Nigeria REFERENCE

• Mr. Thomas Christl, Project Manager, Julius Berger Nigeria PLC, Lagos, Nigeria Phone: +234 813-***-****, Email: ac9ynd@r.postjobfree.com

• Mr. Peter Fausel, Project Manager, Julius Berger Nigeria PLC, Lagos, Nigeria Phone: +234 810-***-****, Email: ac9ynd@r.postjobfree.com

• Mr. Alfredo Gatus, Head Quantity Surveyor, Julius Berger Nigeria PLC, Lagos, Nigeria Phone: +234 703-***-****, Email: ac9ynd@r.postjobfree.com DECLARATION

I hereby certify that all written information above are true and correct to the best of my ability and belief. ENGR. ROMUALDO V. TIQUIA



Contact this candidate